Skip to content

Islington · N1 EC1

Splashbacks and upstands in Angel

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

Angel kitchens

What the kitchens here are actually like

Georgian terraceearly Victorian terracewarehouse conversionnew-build apartment

The kitchen normally sits in the back addition or a later side return, which puts the run against the oldest and least straight wall in the building. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. The wall decides, not the brochure.

A dense mix of period flats and newer apartments, where period conversions put the kitchen in a rear room or a former closet wing on a 2.4-3m run, while converted warehouses and newer blocks give open-plan runs with an island. Whole-house Georgian jobs put the kitchen at lower ground with garden access and a long single wall.

Check the filtered-street layout before fit day, because a wrong turn through a camera gate costs more than the delivery and the legal approach usually adds a long carry. Upper Street is a red route with bus lanes, City Road and Pentonville Road are red routes on the southern edge, and the side streets are controlled Monday to Friday with some seven-day bays near the Green. Several surrounding streets sit inside camera-enforced traffic filters, so the route in for a van is not the route a satnav gives you.

Georgian houses put the kitchen in a basement or a rear closet wing, and the stairs down to it are the tightest part of the whole route. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here, it rides the bow and hides the junction the worktop can never close on its own. The wall makes that decision, not the brochure.

What we are usually templating in is Georgian terrace, early Victorian terrace, warehouse conversion and new-build apartment. Each of those behaves differently once the old top comes off.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered on our north London run. Fitted 3–7 working days from template.

period detached houses and villas

Getting stone into the room

The realistic answer on a main road is an early slot, a spotter on the van and pieces staged in one movement rather than several trips. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. That is why they are crated the way they are.

period detached houses and villas

What gets asked for here

Honestly, this is not what we do most on this patch. Worktop replacement, worktop templating and worktop installation come up more often. That is a statement about the local housing rather than about the work, and nothing about how it is quoted, cut or fitted changes because of it.

Access

Getting stone into a Angel kitchen

Upper Street is a red route with bus lanes, City Road and Pentonville Road are red routes on the southern edge, and the side streets are controlled Monday to Friday with some seven-day bays near the Green. Several surrounding streets sit inside camera-enforced traffic filters, so the route in for a van is not the route a satnav gives you.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

north London patch

Angel is covered on our north London run, along with the rest of Islington.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in Angel

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you cover Angel?

Yes. Angel is on the patch, and the postcodes we work here are N1, EC1. It is worked on our north London run, along with the rest of Islington. The realistic answer on a main road is an early slot, a spotter on the van and pieces staged in one movement rather than several trips. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. Handling is where these pieces get damaged. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Does the housing in Angel change how worktop splashbacks & upstands works?

Georgian houses put the kitchen in a basement or a rear closet wing, and the stairs down to it are the tightest part of the whole route. Where a client wants a full-height piece behind the hob, it usually sits in the old chimney recess, and that recess is rarely square top to bottom or side to side, so it has to be templated as a trapezium rather than a rectangle. The wall makes that decision, not the brochure. Check the filtered-street layout before fit day, because a wrong turn through a camera gate costs more than the delivery and the legal approach usually adds a long carry.

How does the stone actually reach a kitchen in Angel?

Upper Street is a red route with bus lanes, City Road and Pentonville Road are red routes on the southern edge, and the side streets are controlled Monday to Friday with some seven-day bays near the Green. Several surrounding streets sit inside camera-enforced traffic filters, so the route in for a van is not the route a satnav gives you. Garden routes carry their own hazards: a drain cover, a step up to a patio, wet decking, or a lawn that will not take a loaded trolley. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. It decides panel size before anything is cut.

Is Angel really a worktop splashbacks & upstands area?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop replacement, worktop templating and worktop installation. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. In a converted house the flat entrance and the internal doorway are usually tighter than the communal stairs, and that is easy to overlook. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Sockets final before template. Party-wall and lease conditions in a converted building set when noisy work can happen, which shapes the fitting day more than the kitchen does. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Siliconed to the worktop, never grouted.

Why do two Angel kitchens the same size price differently?

The catch with a galley is that both runs are seen end-on from the doorway, so any difference in overhang between the two reads immediately. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. The joint to the worktop is siliconed, never grouted. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What has to be finished before you can template?

A run can measure dead right at both ends and still belly out in the middle, which only appears once the template plots the intermediate points. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. Make the wall good first, or accept the detail. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. The same building type can arrive as a careful one-off kitchen or as a fast turnaround, and the honest answer is that they are priced differently. Full-height panels need the wall made good first, which is another trade and another timescale. Same slab run as the tops.

Next step

Splashbacks and upstands in Angel, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489