
City of London · EC2R EC3V
Splashbacks and upstands in Bank
Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.
- 5.0from 23 Google reviews
- 25-year material · 5-year workmanship
- Fitted 3-7 working days from template
Bank kitchens
What the kitchens here are actually like
The room is square, the walls are plumb and the floor is flat, so almost every complication in the job belongs to the building rather than the kitchen. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Same slab run, same day, same batch.
Conversions of former banking and office buildings give unusual room shapes with very tall ceilings and thick masonry, so kitchens are often an L of 3-3.5m tucked into a corner of a large single room, with the stone chosen to sit against ornate original plasterwork.
Pied-a-terre flats here are used lightly, so the brief is durability and low maintenance rather than a big cooking layout. The Bank junction itself is restricted to buses and cycles during weekday daytime hours, which is the single most important planning fact for a delivery here - the approach has to be worked out from the permitted streets, not the shortest route. Plan the delivery route around the Bank junction restrictions first and the kitchen second, because a wrong turn here is a fine and a missed slot.
Piece size is set by the lift car and the entrance dogleg, which routinely turns a two-piece kitchen into a three-piece one. Every socket, switch and any USB point has to be cut out of the stone to the actual measured position, so the template has to be taken with the faceplates off and the back boxes visible. Decided before fabrication starts.
The stock behind these kitchens runs to banking hall and office building converted to flats, Victorian commercial building with residential upper floors, modern apartment in a mixed-use scheme and small pied-a-terre flat. Which of those you have decides most of what follows.
True everywhere
Splashbacks and upstands, in short
- Cut from the same slab run as the worktop, at the same time.
- Ordered later, from a different batch, the match is not reliable where the pieces meet.
- Socket and switch positions must be final before templating.
- The joint to the worktop is siliconed, never grouted.
Covered on our the City run. Fitted 3–7 working days from template.
Victorian and Edwardian terraces
The shape of the run
Where the return runs into a wall that is out of square, the corner is templated as the angle it really is rather than as ninety degrees. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Corners get their own pieces.
Victorian and Edwardian terraces
Getting stone into the room
Add security desks, ANPR on the City's entry points and short loading windows, and an early or late slot is usually the only practical option.
Victorian and Edwardian terraces
What gets asked for here
Honestly, this is not what we do most on this patch. Worktop replacement, worktop installation and worktop design & quotation come up more often. That is a statement about the local housing rather than about the work, and nothing about how it is quoted, cut or fitted changes because of it.
Access
Getting stone into a Bank kitchen
The Bank junction itself is restricted to buses and cycles during weekday daytime hours, which is the single most important planning fact for a delivery here - the approach has to be worked out from the permitted streets, not the shortest route. Add security desks, ANPR on the City's entry points and short loading windows, and an early or late slot is usually the only practical option.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
the City patch
Bank is covered on our the City run, along with the rest of the Square Mile.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop splashbacks & upstands in Bank
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you actually work in Bank, or just list it?
Yes. Bank is on the patch, and the postcodes we work here are EC2R, EC3V. It is worked on our the City run, along with the rest of the Square Mile. A dedicated loading bay or service yard is the easiest arrangement in a managed building, provided the slot is booked and someone has the key to the shutter. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. One trip is always better than three. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
What is different about worktop splashbacks & upstands in Bank?
Piece size is set by the lift car and the entrance dogleg, which routinely turns a two-piece kitchen into a three-piece one. The plasterboard is flat enough for a full-height panel; it is the socket positions that cause the trouble. The wall makes that decision, not the brochure. Plan the delivery route around the Bank junction restrictions first and the kitchen second, because a wrong turn here is a fine and a missed slot.
Is access a problem in Bank?
The Bank junction itself is restricted to buses and cycles during weekday daytime hours, which is the single most important planning fact for a delivery here - the approach has to be worked out from the permitted streets, not the shortest route. Add security desks, ANPR on the City's entry points and short loading windows, and an early or late slot is usually the only practical option. The barrier, the entry code and the estate rules decide when a van can get near the door, and none of that is negotiable on the day. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. Joint positions follow from that.
Do you get much worktop splashbacks & upstands work in Bank?
Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop replacement, worktop installation and worktop design & quotation. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. A kitchen carved out of a larger room sits under whatever the original plan left behind, so the run frequently ends at a blocked doorway or a boxed-in service. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Siliconed to the worktop, never grouted. In a converted house the flat entrance and the internal doorway are usually tighter than the communal stairs, and that is easy to overlook. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Sockets final before template.
What decides the price of a worktop in Bank?
Where the return runs into a wall that is out of square, the corner is templated as the angle it really is rather than as ninety degrees. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. The joint to the worktop is siliconed, never grouted. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What do I need to sort out first?
Dot-and-dab plasterboard sounds solid and is hollow behind, so anything fixed through it has to hit a dab or a batten rather than a void. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Make the wall good first, or accept the detail. Any socket you intend to move must be moved and re-plastered before templating, because a cut-out in the wrong place means a new piece of stone. Mixed ownership means the decision-maker is not always the person who lets us in, so it is worth being clear early about who signs the quote off. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Decided before fabrication, not after.
Related
More around Bank
Other work we do in Bank
Next step
Splashbacks and upstands in Bank, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.