The housing stock
What we are usually working with in Castelnau
Distinctive early Victorian paired villas with tall rooms and deep plans - kitchens usually at the rear or in a lower ground, with 3.5m to 4m runs, high ceilings that allow full-height splashbacks, and space for a proper island in the wider houses.
Tall rooms tempt full-height slab splashbacks, and at 2.4m plus these become the heaviest single piece on the job - plan the lift for the splashback, not the top.
The road is a busy artery towards the bridge with red-route style restrictions at peak, so unloading happens in the side turnings; villa front gardens are short with a flight of steps up to a raised entrance.
What turns up on the job sheets is 1840s stucco villa, Victorian semi, interwar flats and postwar infill. That mix is why two jobs on the same road can run completely differently.
The kitchen normally sits in the back addition or a later side return, which puts the run against the oldest and least straight wall in the building. Pieces are cut, mitred, machined and dry-assembled on the bench before anything is loaded onto a van. Joins over gables, always.
Walls are thick, lime-plastered and built in a soft brick, so they take a scribe well and take a fixing badly. The day is planned backwards from the hall, and the scribing takes longer than the carry. The slow parts are slow for a reason.
Seating overhangs past roughly 300mm will not carry on the carcass alone, so flat steel bar or a plywood substrate has to be built into the units first. On the day that means dry-laying the whole layout first and only then pulling and bonding the joins. The join is the last thing finished.
Piece length is set by the internal diagonal of the lift car, not by the length of the slab. The fitting day is planned backwards from that point, before anything comes off the van. None of it is worked out on the doorstep.
Access. The road is a busy artery towards the bridge with red-route style restrictions at peak, so unloading happens in the side turnings; villa front gardens are short with a flight of steps up to a raised entrance.
At a glance
- Borough
- Richmond upon Thames
- Postcodes
- SW13
- Covered on
- our south west London run
- Lead time
- 3–7 working days from template
There is nothing to visit in Castelnau. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.
Services
What we do in Castelnau
Six services, ordered by what Castelnau's housing stock actually asks for most.
Nearby
We also work around Castelnau
Questions
Working in Castelnau
Do you fit kitchen worktops in Castelnau?
Yes. Distinctive early Victorian paired villas with tall rooms and deep plans - kitchens usually at the rear or in a lower ground, with 3.5m to 4m runs, high ceilings that allow full-height splashbacks, and space for a proper island in the wider houses. Where the frontage is a clearway the unload happens away from the door and the carry gets longer, which is a crew and time question rather than a stone one. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Handling is where these pieces get damaged.
What kind of kitchens do you usually work on in Castelnau?
1840s stucco villa, Victorian semi, interwar flats and postwar infill. Rooms are tall with deep window reveals, and a run finishing into a reveal is templated to it rather than assumed square. The day is planned backwards from the hall. Walked, measured, protected, then lifted.
Is access difficult in Castelnau?
The road is a busy artery towards the bridge with red-route style restrictions at peak, so unloading happens in the side turnings; villa front gardens are short with a flight of steps up to a raised entrance. A car that takes 2.4m on the diagonal will not take a three-metre worktop however it is stood, and there is no trimming it on the landing. Finding it out on the morning costs the whole slot, because there is no second route to fall back on. That is what the morning is planned around.
What do you get asked for most in Castelnau?
Worktop splashbacks & upstands, worktop fabrication and worktop installation, in that order. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Same batch, same run, same day. Tall rooms tempt full-height slab splashbacks, and at 2.4m plus these become the heaviest single piece on the job - plan the lift for the splashback, not the top.
What decides the price of a worktop in Castelnau?
An island is a single visible piece with four finished edges and no wall to hide against, so it is the piece the whole kitchen is judged on. A layout that has been packed and levelled run by run instead of to one datum shows as a step where two pieces meet. Dry-lay first, always. Floors settle, and once base units are packed and levelled properly the stone sits true while everything else in the room admits it is not. Cut it square where it should be radiused and the piece will fail on the lift, not in the kitchen. Radiused, polished, and clear of the joins. Material runs from £110 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines rather than rolled into one figure.
Do you work in flats and leasehold properties in Castelnau?
A street with houses in single occupation next to the same houses cut into flats produces two completely different jobs from the same elevation. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Decided before fabrication, not after. Tell us the building when you book and the lift, the stair turn and any freeholder notice get built into the day rather than found on it.
Next step
Get your Castelnau kitchen priced
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.