Skip to content

Richmond upon Thames · TW1

Kitchen worktops in Eel Pie Island

Small idiosyncratic homes, many self-built or converted from boathouses and studios, with kitchens of 2m to 2.8m against a timber-framed wall, lightweight construction throughout, and open-plan living where a peninsula does the work of an island.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

The housing stock

What we are usually working with in Eel Pie Island

converted boathouseself-built river chalet1970s island houseartist studio conversion

Small idiosyncratic homes, many self-built or converted from boathouses and studios, with kitchens of 2m to 2.8m against a timber-framed wall, lightweight construction throughout, and open-plan living where a peninsula does the work of an island.

There is no vehicle access at all - everything crosses the humpbacked footbridge and then goes along narrow paths, usually on a sack barrow or by hand, and the island floods on high spring tides. No van gets on the island, so pieces are sized to be carried over the footbridge by two people, which usually means 1.5m maximum and more joints than you would normally accept.

The buildings themselves are mostly converted boathouse, self-built river chalet, 1970s island house and artist studio conversion. Which of those you have decides most of what follows.

Lath and plaster, a settled floor and a hall with a turn in it are the three things that decide how this job runs. The workshop works to the template drawing and to the measured route, in that order. Joins over gables, always.

Half-landings mean the back of the house sits at a slightly different level from the front, and a knocked-through kitchen crosses that line. The day is planned backwards from the hall, and the scribing takes longer than the carry. Walked, measured, protected, then lifted.

On a heavily veined stone the island and the run behind it are nested off the same area of slab so the movement relates across the room. A join that lands in the wrong place cannot be moved once the cut-outs are machined, so it is settled on the drawing. That is nested before any glass goes on the saw.

A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. The template visit is booked once the units are genuinely in, not when they are nearly in. Appliances on site, not on order.

Where ownership is split across a building, the common parts belong to someone else and the carry route is negotiated rather than assumed. The template happens when the units are in, fixed and level, whoever is fitting them. Fitted, fixed and level, then we come.

Access. There is no vehicle access at all - everything crosses the humpbacked footbridge and then goes along narrow paths, usually on a sack barrow or by hand, and the island floods on high spring tides.

At a glance

Borough
Richmond upon Thames
Postcodes
TW1
Covered on
our south west London run
Lead time
3–7 working days from template

There is nothing to visit in Eel Pie Island. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.

Questions

Working in Eel Pie Island

Do you fit kitchen worktops in Eel Pie Island?

Yes. Small idiosyncratic homes, many self-built or converted from boathouses and studios, with kitchens of 2m to 2.8m against a timber-framed wall, lightweight construction throughout, and open-plan living where a peninsula does the work of an island. A red route means no stopping, and no stopping means exactly that, so the stone comes in from a side street or from a bay behind the property. Where unloading has to happen in one go, the load order is planned so nothing has to come off twice. It is decided in the yard, not at the kerb.

What kind of kitchens do you usually work on in Eel Pie Island?

converted boathouse, self-built river chalet, 1970s island house and artist studio conversion. Edwardian terraces are wider and taller than the Victorian houses next to them, so the kitchen usually takes a full-width rear room rather than a narrow outrigger. The day is planned backwards from the hall. That is the shape of the day.

Is access difficult in Eel Pie Island?

There is no vehicle access at all - everything crosses the humpbacked footbridge and then goes along narrow paths, usually on a sack barrow or by hand, and the island floods on high spring tides. Everything comes through the front door and down the hall, so the tightest point on the route is usually the newel post at the foot of the stairs. Finding it out on the morning costs the whole slot, because there is no second route to fall back on. It gets checked before the first piece is lifted.

What do you get asked for most in Eel Pie Island?

Worktop fabrication, worktop templating and worktop installation, in that order. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. No stone is ever cut from a plan, which is inconvenient exactly when a programme is tight. Units fitted, fixed and level first. No van gets on the island, so pieces are sized to be carried over the footbridge by two people, which usually means 1.5m maximum and more joints than you would normally accept.

What decides the price of a worktop in Eel Pie Island?

Seating overhangs past roughly 300mm will not carry on the carcass alone, so flat steel bar or a plywood substrate has to be built into the units first. The nest is laid out around that, with joins placed over cabinet gables and kept clear of every cut-out. The bench proves it before the van does. Where a partition has been built off the floor screed rather than off the slab, it moves, and a mitre bonded across that corner is the first thing to open. On the day it means dry-laying, marking, and cutting the scribe on site before anything is bonded. Dry-lay, mark, cut, then bond. Material runs from £110 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines rather than rolled into one figure.

Do you work in flats and leasehold properties in Eel Pie Island?

Mixed ownership means the decision-maker is not always the person who lets us in, so it is worth being clear early about who signs the quote off. A template booked hopefully around another trade is the commonest cause of a wasted visit. No stone is cut from a plan. Tell us the building when you book and the lift, the stair turn and any freeholder notice get built into the day rather than found on it.

Next step

Get your Eel Pie Island kitchen priced

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489