
Richmond upon Thames · TW1
Worktop templating in Eel Pie Island
A digital template plotting the room as it really is, taken once your units are fitted, fixed and level.
- 5.0from 23 Google reviews
- 25-year material · 5-year workmanship
- Fitted 3-7 working days from template
Eel Pie Island kitchens
What the kitchens here are actually like
The kitchen normally sits in the back addition or a later side return, which puts the run against the oldest and least straight wall in the building. Two to three hours on site, once the units are fitted, fixed and level. The room as it is, to the millimetre.
Small idiosyncratic homes, many self-built or converted from boathouses and studios, with kitchens of 2m to 2.8m against a timber-framed wall, lightweight construction throughout, and open-plan living where a peninsula does the work of an island.
There is no vehicle access at all - everything crosses the humpbacked footbridge and then goes along narrow paths, usually on a sack barrow or by hand, and the island floods on high spring tides. No van gets on the island, so pieces are sized to be carried over the footbridge by two people, which usually means 1.5m maximum and more joints than you would normally accept.
Half-landings mean the back of the house sits at a slightly different level from the front, and a knocked-through kitchen crosses that line. Alcoves either side of the breast are rarely the same width and rarely parallel, so each one is templated as its own piece with its own scribe. Recorded as it is, not as it was drawn.
The stock behind these kitchens runs to converted boathouse, self-built river chalet, 1970s island house and artist studio conversion. They are not interchangeable, and a worktop finds the differences quickly.
True everywhere
Worktop templating, in short
- Two to three hours on site for a typical kitchen.
- Units must be fitted, fixed and level first. No stone is ever cut from a plan.
- Sink, tap and hob must be physically on site, not just ordered.
- A Belfast or butler sink must be installed and at its final height.
Covered on our south west London run. Fitted 3–7 working days from template.
Victorian and Edwardian terraces
The shape of the run
Seating overhangs past roughly 300mm will not carry on the carcass alone, so flat steel bar or a plywood substrate has to be built into the units first. Join positions and vein direction are marked on the template drawing before it leaves site. Real angles, not plan angles.
Victorian and Edwardian terraces
What gets asked for here
This is one of the three jobs that come up most here, behind worktop fabrication. It is the same template visit, the same workshop and the same installers either way.
Victorian and Edwardian terraces
True everywhere, stated once
A template records what the building actually did, not what the plan intended. How far those two things diverge is entirely a function of when the house was built.
Access
Getting stone into a Eel Pie Island kitchen
There is no vehicle access at all - everything crosses the humpbacked footbridge and then goes along narrow paths, usually on a sack barrow or by hand, and the island floods on high spring tides.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
south west London patch
Eel Pie Island is covered on our south west London run, along with the rest of Richmond upon Thames.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop templating in Eel Pie Island
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you actually work in Eel Pie Island, or just list it?
Yes. Eel Pie Island is on the patch, and the postcodes we work here are TW1. It is worked on our south west London run, along with the rest of Richmond upon Thames. Loading exemptions on red routes are narrow, time-limited and heavily camera-enforced, so we plan around them rather than relying on them. The templating visit needs somewhere to stop for two or three hours, which is a different problem from unloading for twenty minutes. It goes on the job sheet for the fitting crew. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
What is different about worktop templating in Eel Pie Island?
Edwardian terraces are wider and taller than the Victorian houses next to them, so the kitchen usually takes a full-width rear room rather than a narrow outrigger. The template plots the bow along the back of the run, which is why a tape reading taken beforehand never matches. Recorded as it is, not as it was drawn. No van gets on the island, so pieces are sized to be carried over the footbridge by two people, which usually means 1.5m maximum and more joints than you would normally accept.
Is access a problem in Eel Pie Island?
There is no vehicle access at all - everything crosses the humpbacked footbridge and then goes along narrow paths, usually on a sack barrow or by hand, and the island floods on high spring tides. Everything comes through the front door and down the hall, so the tightest point on the route is usually the newel post at the foot of the stairs. The templater measures that route on the same visit, so the drawing leaves site already knowing the maximum piece. It goes on the drawing with the run dimensions.
Do you do much worktop templating around Eel Pie Island?
It is one of the three we do most here, behind worktop fabrication. Same template visit, same workshop, same installers either way. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. The template visit is booked once the units are genuinely in, not when they are nearly in. Units fitted, fixed and level first. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. No stone is ever cut from a plan, which is inconvenient exactly when a programme is tight. The room as it is, not as it was drawn.
What decides the price of a worktop in Eel Pie Island?
An island is a single visible piece with four finished edges and no wall to hide against, so it is the piece the whole kitchen is judged on. The template records every angle in that shape as it actually is rather than as the plan drew it. One datum for the whole room. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What do I need to sort out first?
Taped internal angles in plasterboard belly at the corner, so the run picks up a few millimetres over the last 300mm and a plan-angle mitre will not close. It is recorded on the drawing with the run dimensions so the workshop is not guessing. Measured at worktop height, nowhere else. Units fixed and packed level over the sloping floor, walls replastered and dry at their final thickness (tiling and splashbacks go on after the worktop, never before), and the sink, tap and hob physically on site, with a Belfast sink built in and set at its finished height. The same building type can arrive as a careful one-off kitchen or as a fast turnaround, and the honest answer is that they are priced differently. The template happens when the units are in, fixed and level, whoever is fitting them. Fitted, fixed and level, then we come.
Related
More around Eel Pie Island
Other work we do in Eel Pie Island
Next step
Worktop templating in Eel Pie Island, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.