Reception counter top
The upper, standing-height surface that visitors lean on and sign at. Long runs are joined over a support, at a change of direction rather than in the middle of a clear front face.

Stone reception counter tops and desk tops in quartz, granite, Dekton or other sintered stone, from £110/m² (stone only), fabricated to a joiner's carcass with the lower transaction shelf and knee recess worked in. Templated once the carcass is in and fitted across London.
A reception counter is usually two surfaces at two levels joined by a return. The upper one is where people stand. The lower one exists so that somebody using a wheelchair can be served at it, and that is not a preference to be traded away when the drawing gets tight.
A counter you are served at needs clear knee space beneath it, which means no leg, no gable and no bracket anywhere in the zone a person has to pull up to. That single requirement decides where the carcass can be supported, which decides where the stone can be joined, which is why it comes up long before colour does.
The rest is sequencing. We template off the built carcass rather than off the drawing, because a counter is a fabricated object that moves between the drawing and the site in exactly the way a wall does.
Fitted 5–10 working days from template. The payment stages are set out on your quote.
What we cut for a front desk
A reception is several pieces of stone at different heights, and each has its own job.
The upper, standing-height surface that visitors lean on and sign at. Long runs are joined over a support, at a change of direction rather than in the middle of a clear front face.
The served-at level, with clear knee space beneath it. Its height comes from the access requirements your designer is working to; what it does to the stone is move every support outboard of the knee zone.
The working surface behind the counter, where the screens, the card reader and the paperwork live. Cable grommets and monitor arm holes are machined in the workshop from the template, never cut on site.
A curved front is cut on the CNC from the template, because a curve that is fair in places is obvious on a long horizontal surface. A join across a curve shows more than one on a straight, so it is planned early.
Choosing the stone
Supply rates are read from our catalogue and cover the stone only. Fabrication, apertures, edges and fitting are quoted as their own lines.
| Material | Colours | Supply from | On a counter |
|---|---|---|---|
| Quartz | 69 | £130/m² | Engineered, so a long counter reads as one colour from end to end. No sealing, and the widest colour range for matching a brand palette. |
| Granite | 45 | £121/m² | A natural-stone counter where variation along the run is the point. Porous, so it is sealed before use and kept sealed. |
| Dekton | 63 | £110/m² | Counters in direct sun through glazing, and heavy-wear front edges. No sealing and stable under ultraviolet light. Brittle where unsupported. |
| Sintered stone | 8 | £280/m² | Our own sintered stone range: no sealing, stable in sun through glass, and supported properly at any overhang. |
Free samples are posted from the Worktop Worx quartz collection, up to four at a time. Other quartz, granite and sintered stone are judged from the slab.
What is involved
The order is fixed. Everything on this list depends on the one before it being finished.
Where the counter is supported, where the knee recess sits and where a join can land are one question rather than three. Answering it on paper with the joiner costs an hour. Answering it on site costs a piece of stone.
We template a counter that is standing where it will live. A carcass still on trestles, or fixed but not yet levelled, produces a drawing that fits nothing.
The upper counter, the lower shelf and the return between them are plotted in one visit, along with every aperture: cable grommets, card readers and anything else that comes up through the surface.
Long runs are joined, and the join is placed over a support and away from the line the eye follows along the counter. Pieces are dry-assembled in the workshop before anything is loaded onto a van.
Set down, levelled, joins pulled tight and polished flush, apertures checked against the actual fittings, then sealed and cleaned down before we leave.
The parts that decide it
A reception counter carries more competing requirements at once than anything else in a building.
The lower shelf has to be clear underneath for somebody to pull up to it. Whatever holds the counter up therefore moves outboard of that zone, and that decision belongs to the joiner before the carcass is built rather than to us afterwards.
Slabs are a fixed size, so a long counter has a join in it. It goes over a support, and it goes where the eye is not travelling: at a change of direction, or in line with a return, rather than in the middle of a clear front face.
Cable grommets, card reader cut-outs, monitor arm holes and anything else that breaks the surface are machined from the template. Cutting them on site means cutting them in a finished reception, which nobody wants and which puts the piece at risk.
A counter top that projects past its carcass to give visitors somewhere to lean is a cantilever like any other. Past roughly 300mm it needs steel or a bracket beneath it, placed clear of the knee zone.
A reception counter gets leant on, written on, wheeled into and cleaned every night. The front edge takes that wear, so a profile with a proper radius outlasts a sharp arris, and the material matters more than it does in a room people pass through once.
A counter in a building open to the public sits outside our 25-year material warranty, which is written for residential installations. The stone is covered by the maker's commercial warranty instead, and our 5-year workmanship guarantee covers the fitting. Both are stated on the quote.
Templating from the drawing can look like a way to save time when the joinery and the stone are chasing the same deadline. The answer is still no. A carcass is fabricated somewhere else and installed against real walls on a real floor, and it lands a few millimetres away from the drawing in ways nobody can predict. Stone is cut once. Template a counter off paper and you find out on fitting day, in a finished reception, with no material left to give. Building the carcass a week earlier costs less than that.
Beyond the front desk
The slabs we cut for a reception are the same ones that go into the rest of a commercial building: a staff kitchen, a cafe servery, a back bar, a salon or a surgery. We template, fabricate and fit them the same way as a counter, around the other trades and to their programme.
What a commercial kitchen worktop or a clinical worktop has to meet is set by the people responsible for the room. On a food preparation line that is your designer and your environmental health officer; in a dental or medical surgery it is the practice's own infection-control specification. We do not advise on either. What we can tell you is how each material behaves: quartz and sintered stone need no sealing, granite is porous and has to be sealed and kept sealed, and quartz should not take a pan straight off the heat.
In a home, the stone carries our 25-year material warranty, which is written for residential installations. In a business, the stone is covered by the maker's commercial warranty instead, and our 5-year workmanship guarantee covers the fitting either way. Which applies is stated on your quote.
Bar tops and back-bar worktops Stone table tops Kitchen worktops in quartz, granite and sintered stone

Before we template
Most of the first list belongs to the joiner, which is why the two trades should be talking before either of them quotes.
Questions
If yours is not here, ring and ask. You will get a straight answer rather than a call-back from a salesperson.
Quartz where the counter should read as one colour from end to end, with no sealing and a wide range for matching a brand palette. Sintered stone where sun comes through glazing onto the counter or the front edge takes heavy wear. Granite where natural variation along the run is the look you want, accepting that it is sealed and kept sealed.
Stone is priced by the square metre, from £110 to £550 across the surfaces we hold, supply only. A counter top 3m long and 0.6m deep is 1.8m², so at the quartz entry rate of £130/m² the stone is about £234. The lower shelf, the return, apertures, edges and fitting are quoted as their own lines.
That is set by the access requirements your project is designed to, and it belongs to your architect or designer rather than to us. What we can tell you is what it does to the stone: the lower shelf needs clear knee space beneath it, so any support has to sit outside that zone, and that changes where the counter can be joined.
No. A carcass is built elsewhere and installed against real walls, and it never lands exactly on the drawing. Stone is cut once, so a counter templated off paper is found to be wrong in a finished reception. We would rather wait the week.
Yes. Curves are cut on the CNC from the template, which is the only way a long curve stays true. A curved front also changes how the piece is joined, because a join across a curve is far more visible than one on a straight run, so it gets planned early.
We template, fabricate and fit stone worktops in commercial rooms the same way as a counter. What the surface has to meet, for food preparation or infection control, is set by your designer and the authority responsible for the room, so we work to their specification rather than advise on it.
Yes. The slabs we cut for a reception are the same ones that go into a salon, a surgery, a staff kitchen or a cafe servery, and we template, fabricate and fit them the same way as a counter, around the other trades and to their programme. What a surgery or servery worktop has to meet is set by the people responsible for the room, so we work to their specification rather than advise on it.
In anything longer than a slab, yes. Slabs come in fixed sizes and there is no way around that. What we control is where it goes: over a support, and at a point the eye is not following, such as a change of direction. You see the proposed positions at template and sign them off.
Where we work
We template and fit across Greater London and out into Essex, Hertfordshire, Surrey, Buckinghamshire and Berkshire. The stone is cut in our workshop and fitted by our own installers, wherever the job is.

Next
Every job runs through more than one of these. Follow the thread rather than guessing which order things go in.
Home and trade bar surfaces, with the overhang carried properly.
Read the detailCut, profiled and drilled to the bases you already own.
Fitted by our own installers, scribed, joined, sealed and cleaned down.
Read the detailWorth reading
The questions that come up most, answered in full rather than in a sentence.
Why joins exist, what decides how many you get, where a good one belongs, and the honest truth about how visible a join is in quartz, granite and sintered stone.
Read the guideThe edge is the part of the worktop you touch every day and the detail that dates a kitchen fastest. What the common profiles are, what each costs you in labour, and how to pick.
Read the guideWhat the two standard thicknesses actually change, what they do not (strength, mostly), and why the honest deciding factors are weight, the carry into your kitchen and how you want the edge to read.
Read the guideThe three materials compared on the things that genuinely differ in a working kitchen (heat, stains, scratches, joins and cost) rather than on brochure adjectives.
Read the guideSix drivers decide your price, and only one of them is the colour you picked. An honest breakdown of where the money goes and how to compare two quotes properly.
Read the guideA tape measure, ten minutes and a sheet of paper is enough to start a proper written quote. Here is exactly what to record and what to photograph.
Read the guideEvery one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.
Read all 26 See them on Google
Count as read from Google on 4 September 2026
“We have a new kitchen. Our builder recommended Worktop Worx for our worktop. Now we have an amazing worktop very good price too. Really recommend. They were really good to us. 10/10”
“We recently had a Calacatta Gold worktop installed by Worktop Worx and are really pleased with the result. It has completely transformed our kitchen, much brighter, modern, and high-end compared to our old wooden surface. The team were professional, efficient, and the finish is excellent with great attention to detail. The worktop looks amazing and is…”
“We recently had the Arctic Starburst worktop installed by Worktop WorX and it looks amazing. The subtle sparkle really catches the light and gives the kitchen a clean, modern feel. The Arctic Starburst surface feels high quality, durable, and is easy to keep clean. The finish and installation from Worktop WorX were spot on. Really happy with the result…”
“Excellent service from start to finish. The team at Worktop Worx were professional, friendly, and really paid attention to detail. They listened to what I wanted, gave helpful advice, and delivered a high-quality finish. The worktop looks amazing and has completely transformed the space. Everything was completed on time and left clean and tidy. Highly…”
“I am really happy with the work! He fitted my kitchen granite worktop really nicely and got the job done on time, just as promised. He was friendly, professional, and made sure everything was done the way I wanted. Would definitely recommend Karam to anyone looking for a great job!”
“We recently had our kitchen worktops supplied and fitted by Worktop WorX using Laurent Gold sintered stone, and we couldn’t be happier with the result. The finish, quality, and attention to detail were outstanding from start to finish. Karem was incredibly helpful throughout the whole process professional, knowledgeable, and always available to answer…”
8 of our 26 Google reviews name Karem, who owns and runs Worktop Worx.
Next step
A joinery drawing, a sketch or photographs with rough dimensions is enough to start. The quote costs nothing.