Bathroom worktops and vanity tops, cut to size in London

Calacatta Gold quartz worktop surface
  • 5.0 from 26 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote Order free samples

Bathroom worktops and stone vanity tops cut to size in quartz, granite, Dekton or other sintered stone, from £110/m² (stone only), in the narrower widths a bathroom takes, with shelves and window returns to match. We seat and seal the basin, a plumber connects it.

Bathroom tops cut to size: a small piece with a lot on it

A vanity top is short, and that is the whole difficulty. A basin, one or two tap holes, a splash return and often a window reveal all land within a few hundred millimetres of each other, and there is nowhere to move any of them to. On a kitchen run you can slide a join or a socket along a metre of stone. On a vanity you cannot.

The width is the constraint rather than the length. Standard vanity depths are far narrower than a kitchen worktop, which can work in your favour: a top can be cut from offcut stock where a piece suits, and then a material you were told was out of budget across a kitchen may be affordable across one basin. It also means the choice depends on what is on the rack rather than on a full slab order.

One division to be clear about. We seat and seal the basin into the stone. A plumber connects the water and the waste, and should be booked after us rather than alongside us, because the silicone needs to cure before the basin takes water.

Fitted 5–10 working days from template. The payment stages are set out on your quote.

Typical piece
One vanity top, sometimes a shelf or window board
Material
Quartz, granite or sintered stone, offcuts considered
Basin
Seated and sealed by us, connected by a plumber
Supply price
£110–£550/m², before fabrication and fitting

Get a fixed quote

Stone vanity tops

Which stone for a vanity top

Any surface we supply can be cut down to a vanity. Supply rates are read from our catalogue and cover the stone only; the basin aperture, tap holes, edges and fitting are quoted as their own lines.

Bathroom worktops: the materials we supply, how many colours of each, the supply-only price per square metre and what each suits
MaterialColoursSupply fromOn a vanity
Quartz69£130/m²Most bathrooms: no sealing, consistent colour, and copes with water standing on it. Strong cleaners and cosmetics are wiped off rather than left.
Granite45£121/m²A natural-stone vanity. Porous, so it is sealed before use and resealed periodically, which matters more in a bathroom than a kitchen.
Dekton63£110/m²No sealing, and resistant to the cleaning products and cosmetics a vanity collects. Thin formats suit a slim floating top.
Sintered stone8£280/m²Our own sintered stone range: no sealing, and unbothered by water, cleaners or cosmetics left standing.

Free samples are posted from the Worktop Worx quartz collection, up to four at a time. Other quartz, granite and sintered stone are judged from the slab.

What is involved

From the tap you bought to a fitted vanity top

The same stages as a kitchen, run across a much smaller piece, which changes what matters at each one.

  1. Before we quote

    Tell us the basin and the tap

    Not the style, the actual products. An undermount basin is machined to its own template and a tap is drilled to the spacing it needs. Both are settled before anything is cut, because a change afterwards means a new piece rather than an adjustment.

  2. Offcuts considered

    Pick from what is on the rack

    At vanity depths a top can come out of offcut stock where a piece suits, so the honest question is what we have rather than what is in the brochure. It widens the choice at the expensive end of the range and narrows it at the plain end.

  3. On site

    Template the unit, not the drawing

    The vanity unit has to be fitted, fixed and level first. A short piece has no slack in it, and a few millimetres of movement in the carcass shows on a top this size in a way it never would across a kitchen.

  4. Workshop

    Cut, bond and polish in the workshop

    The aperture is cut, an undermount basin is bonded and supported from beneath, and the cut edge is polished, because on a vanity you look straight down into it. Tap holes are drilled to the tap that is on site.

  5. Fitting day

    Fit, seal and hand over

    The top is scribed to the wall, bedded, sealed along the wall junction and cleaned down. Your plumber connects afterwards, once the sealant has had time to cure.

The awkward parts

What makes a bathroom different from a kitchen

Bathrooms are small rooms full of fixed obstacles, and the stone has to work around every one of them.

The basin decides the fabrication

An undermount basin is bonded under the stone and the aperture is polished, because that cut edge is visible from above every time the basin is used. An inset basin drops in from the top and covers the same edge. They are different pieces of work and they are priced differently.

Tap holes are drilled to your tap

There is no standard spacing worth machining to. A three-hole set, a single monobloc and a wall-mounted spout that needs nothing drilled at all are three different tops, and the decision has to be final before the piece is cut.

Window reveals and returns

Where a window sits above the basin, a stone reveal, a sill or a splash return off the vanity top can be cut from the same material and templated in the same visit, which is the only way the colour and the pattern carry across.

Offcut stock cuts both ways

A vanity is small enough to come out of remnant material, which puts expensive stone within reach. It also means the exact piece is finite. If you want a matching shelf or window board, order them together while the offcut is still on the rack.

Water sits on a vanity longer than on a worktop

A bathroom top gets splashed constantly and wiped down rarely. Quartz and sintered stone need no sealing. Granite does, and it wants resealing periodically. Cosmetics, toothpaste and anything acidic are harder on a vanity than cooking ever is on a kitchen.

We seat the basin, a plumber connects it

The same division of work as a kitchen sink. We bond, support and seal the basin into the stone. Supply, waste and any pop-up mechanism belong to a plumber, booked after us so the sealant has cured before the basin is loaded.

Vanity unit worktops

Vanity unit worktops: a new top on the unit you have

A new stone top can go on the vanity unit you already have, as long as the unit is sound. It is the same logic as replacing a kitchen worktop without replacing the kitchen: the unit stays, only the surface changes, and the unit has to be fixed, level and strong enough to carry stone. A wall-hung unit puts the whole weight into the wall rather than the floor, so what the wall is built of stops being a detail.

We template off the fitted unit, never off a plan, because a short piece has no slack in it and a few millimetres of movement in the carcass shows on a top this size. If the unit itself is being changed, fit the new one first and we template once it is in.

Trevi sintered stone worktop surface

Before you order

What we need, and what is not our trade

A vanity involves fewer decisions than a kitchen, and each one is harder to undo.

Have this settled

  • The basin itself, or its make and model, and whether it is undermount or inset
  • The tap, and how many holes it needs, including a wall-mounted one that needs none
  • The vanity unit fitted, fixed and level before we template
  • Whether you want a matching splash return, shelf or window board, decided while the offcut still exists
  • Walls at their finished thickness, because we scribe to the wall you have
  • A plumber booked for after our visit rather than the same slot

What we do not do

  • Connect water, waste or a pop-up waste: we seat and seal, a plumber connects
  • Supply or fit the vanity unit, the basin or the tap
  • Tile, plaster or make good the wall around a finished top
  • Cut a new tap hole into a top that is already fitted
  • Promise a batch match on a piece ordered months after the first one

Questions

Bathroom worktops: the questions worth asking

If yours is not here, ring and ask. You will get a straight answer rather than a call-back from a salesperson.

01

Can you cut a bathroom worktop to size for my vanity unit?

Yes, and it is cut to the unit as it stands rather than to a drawing. The vanity unit is fitted, fixed and level first, then we template it on site with the basin and the tap there, so the aperture and the tap holes are set out from the real objects. The top is cut, bonded and polished in our workshop and fitted afterwards.

02

Do you supply bathroom tops on their own, without a kitchen?

Yes. A vanity is priced as its own piece rather than as a length of worktop, templated, cut and fitted by us like any other job, and at vanity depths it can be cut from offcut stock where a piece suits. What we do not do is sell stone for somebody else to fit. If a kitchen is being done as well, ordering the two together puts both on the same slab run.

03

Can I have a bathroom top in the same stone as my kitchen?

Usually, and it is worth asking early. Ordered together, both come off the same slab run and the match is real. Ordered a year apart, engineered stone will have moved batch and granite will be a different slab, so the two read as related rather than identical. In separate rooms that is normally fine.

04

Is a vanity top cheaper than a kitchen worktop?

Per square metre it is the same stone at the same supply rate, £110 to £550 depending on the range. The piece is simply much smaller: a vanity top 1.2m wide and 0.5m deep is 0.6m², so at the quartz entry rate of £130/m² the stone is about £78 before fabrication and fitting. At vanity depths it can often come out of offcut stock, so a material that would be expensive across a kitchen can be affordable across one basin.

05

What is the best stone for a vanity top?

Quartz for most bathrooms, because it needs no sealing and water standing on it does it no harm. Sintered stone if you want a slim top or the most resistance to cleaners and cosmetics. Granite if you want natural stone, accepting that a bathroom is where its sealing matters most.

06

Undermount or inset basin?

Undermount looks cleaner and lets you wipe straight into the bowl, and the cut edge is polished because you look down onto it. Inset drops in from above and hides that edge, which makes it more forgiving and usually cheaper. Both are fine. The choice has to be made before the top is machined.

07

Does a bathroom worktop need sealing?

It depends on the material rather than the room. Quartz and sintered stone need no sealing. Granite does, and in a bathroom it is worth staying on top of, because cosmetics and cleaning products tend to sit on a vanity long before anyone wipes them off.

Read the vanity-top guide

Where this happens

Bathroom worktops in your part of London

Twelve neighbourhoods whose housing stock throws up this job most often. Each page covers what bathroom worktops actually involves in that stock: the access, the era of the building and what that does to the work.

These twelve are a sample, not a coverage boundary. We work in 723 Greater London neighbourhoods and out into Surrey, Hertfordshire, Buckinghamshire, Berkshire and Essex.

Worth reading

Before you book bathroom worktops

The questions that come up most, answered in full rather than in a sentence.

Stone for the bathroom vanity

A stone vanity top is cut from the same slabs as a kitchen worktop, in a narrower width, and quartz is the easy choice for a bathroom because it never needs sealing. The top is cut for the basin and tap you bought, and a plumber connects them afterwards.

Read the guide

Twenty or thirty millimetres, and why it matters

What the two standard thicknesses actually change, what they do not (strength, mostly), and why the honest deciding factors are weight, the carry into your kitchen and how you want the edge to read.

Read the guide

Getting a mark out of stone

Stains and etches look alike and need opposite treatments. How to tell them apart, what to do in the first minute, the poultice method properly explained, and what will make it permanently worse.

Read the guide

Keeping quartz clean without harming it

Clean a quartz worktop with warm water, a little washing-up liquid and a soft cloth, then dry it. For a deeper clean use a pH-neutral stone cleaner. Avoid bleach left standing, oven cleaner, abrasive pads and heat, because the resin in quartz is what they damage.

Read the guide

A window sill cut with the worktop

The best stone for an internal window sill is usually the one your worktop is made of, cut from the same batch at the same template visit. Quartz suits most kitchens and bathrooms, granite suits a sill you will seal, and a notched sill sits neatly inside the reveal.

Read the guide

What your sink choice does to the worktop

What each sink type does to the worktop it sits in: how the cut-out is cut and finished, what it costs in fabrication, what carries the weight, and why the sink has to be in your kitchen before anyone can template.

Read the guide

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26   See them on Google

Count as read from Google on 4 September 2026

★★★★★
“Kareem did the countertops dur8ng my kitchen remodel, and I was so impressed that I had him back to do the laundry room as well, which tells you everything you need to know. He is an absolute gem. Shows up when he says he will (which, let’s be honest, is rarer than it should be), does beautifully work, and clearly takes real pride in what he does. The…”
Susie WigginsGoogle review
★★★★★
“We recently had the Arctic Starburst worktop installed by Worktop WorX and it looks amazing. The subtle sparkle really catches the light and gives the kitchen a clean, modern feel. The Arctic Starburst surface feels high quality, durable, and is easy to keep clean. The finish and installation from Worktop WorX were spot on. Really happy with the result…”
Han LeeGoogle review · Arctic Starburst
★★★★★
“Excellent service from start to finish. The team at Worktop Worx were professional, friendly, and really paid attention to detail. They listened to what I wanted, gave helpful advice, and delivered a high-quality finish. The worktop looks amazing and has completely transformed the space. Everything was completed on time and left clean and tidy. Highly…”
Kam 98Google review
★★★★★
“I am really happy with the work! He fitted my kitchen granite worktop really nicely and got the job done on time, just as promised. He was friendly, professional, and made sure everything was done the way I wanted. Would definitely recommend Karam to anyone looking for a great job!”
esther boaduGoogle review · Granite
★★★★★
“We recently had our kitchen worktops supplied and fitted by Worktop WorX using Laurent Gold sintered stone, and we couldn’t be happier with the result. The finish, quality, and attention to detail were outstanding from start to finish. Karem was incredibly helpful throughout the whole process professional, knowledgeable, and always available to answer…”
Gabriel TivadarGoogle review · Laurent Gold sintered stone
★★★★★
“We have a new kitchen. Our builder recommended Worktop Worx for our worktop. Now we have an amazing worktop very good price too. Really recommend. They were really good to us. 10/10”
j thomasGoogle review

8 of our 26 Google reviews name Karem, who owns and runs Worktop Worx.

Next step

Send us the bathroom and we will price it properly

A photograph of the vanity unit with rough dimensions, and the basin and tap you have chosen, is enough to start. The quote costs nothing.

Get a fixed quote Order free samples