You get the date at template
Not a vague week. A fitting date, fixed when the drawing is signed off, with the fabrication slot booked against it.

Six steps, plus the one after handover. The quote costs nothing, and we fit 5 to 10 working days after the template.
Here is the whole process written down, including the parts that are your job rather than ours, so you always know what happens next and who is doing it.
Steps one to three cost you nothing and commit you to nothing. Step four is where the room is measured properly. Steps five and six happen inside 5 to 10 working days, and step seven is the one most companies do not bother with.
Working days from template, at the outside
The process
Each step links through to the service page if you want the full detail on that part.
Plans, a sketch or photographs with rough run lengths. We come back with a range before anybody gets in a van.
You do not need drawings to start. A photograph of the room with a tape measurement written along each run tells us most of what we need for a first number. Better still, if you have a kitchen plan from a supplier, send that.
We read it for the things that move a price: how many corners, whether an island has an overhang, whether a window sill sits inside a run, whether there are drainer grooves. Then we reply with any questions, and after that a written itemised quote, so you know where you stand before anything is booked.
Worth knowing
Shortlist the surfaces you are seriously considering and judge them against your own kitchen, at night, under your own lights.
There are 185 surfaces in the range across quartz, granite and sintered stone, from £110/m² supply at the entry point. Narrowing that down on a screen is hard, which is why every colour page shows the surface fitted in real kitchens, and why we can arrange for you to see the slab before anything is cut.
Judge them against where the kitchen actually is, next to the door colour and the flooring, in the evening under your own lighting. Showroom lighting flatters every slab ever quarried. And we will tell you where a cheaper surface does the same job. The gap between a mid-range quartz and the top of the range is usually about pattern, not performance.
Worth knowing
Every cut-out, edge, upstand and join itemised, with the supply rate shown separately from the work.
The quote is a list, not a number. Square metres per run against the supply rate for your chosen slab, then the edge profile, each cut-out, the joins, the upstands or splashbacks, and the work itself as its own lines rather than buried in the stone price. If you drop something later, you can see exactly what comes off.
Approve it and that is what you pay. The only two things that move it are a change you make to the specification, or a room that measures differently at template from the plan we quoted against. In either case you get the revised number before a slab is cut, not an invoice afterwards.
Worth knowing
Two to three hours on site
The room is plotted digitally once your units are fitted and level. This visit is where your fitting date is fixed.
A templater plots your kitchen as it actually is: every wall angle, every bow in the plaster, every return that is not quite square. The drawing that comes off it is what the cutting machine follows. No stone is ever cut from a plan.
It takes two to three hours for a typical kitchen, longer with an island or several returns. While we are there you agree the join positions, the overhangs and the tap hole placement standing in the room rather than finding out later. You sign off the drawing, and the fabrication slot is booked with your fitting date attached to it.
Worth knowing
Cut, mitred and polished to your template, then dry-assembled on the bench with the sink and hob dry-fitted.
Your pieces are laid out on the actual slab first. On a material with real movement in it, that layout decides whether a vein runs through a join or stops dead at it. Then it is cut to the template drawing, mitred where the edge detail calls for it, and polished to match the factory face.
Before anything is loaded, the kitchen is assembled on the bench: runs laid out together, joins pulled up, your sink dropped into its aperture and the hob offered up. Anything wrong is found there, where it costs an hour, instead of in your kitchen where it costs a day and a slab.
Worth knowing
Scribed to your walls, joins pulled and sanded flush, sink and hob seated and sealed, then cleaned down.
Floors and units are protected before anything comes through the door. Pieces are dry-laid, the back edges scribed to the real line of your walls, then bedded and levelled onto the units. Joins are drawn up, bonded with colour-matched adhesive and sanded flush so there is nothing to feel under your hand.
The sink and hob are seated into the stone and sealed. They are not connected. That is a plumber and an electrician, and they should be booked after us rather than alongside us, because fresh silicone needs to cure before it takes water.
Worth knowing




Our lead time promise
Measured from the day we template, not from your enquiry. That is the only measurement of lead time that means anything, because it is the only point at which the work can actually start.
Not a vague week. A fitting date, fixed when the drawing is signed off, with the fabrication slot booked against it.
If any of those happen we tell you the same day. Silence is the thing people actually complain about.
Template day
Run this the day before, not on the morning. If one line is not true, the template cannot be taken and the lead time restarts from the rebooked date.
If you are not certain about any of it, send us a photograph of the units the day before. We would far rather move an appointment than send a templater to a kitchen that is not ready.
Ready before we arrive
Two to three hours on site

Paying for it
Your written quote sets out every stage and when payment falls due. The quote itself costs nothing.
Enquiry and quotation
The full itemised written quote costs nothing, and there is no obligation attached to it.
Confirming the job
Every payment, and the point each one falls due, is set out on your written quote, so you know all of it before you agree to anything.
Changes along the way
If anything changes after the template, it is priced and agreed with you in writing before any work is done.
Your quote sets out both amounts before you commit to anything, and the figure you approve is the figure you pay unless you change the specification or the room measures differently at template.
Step 07
The job is not finished when the van leaves. A stone worktop has a couple of genuine weaknesses, and knowing them on day one is worth more than any warranty document.
Quartz, granite and sintered surfaces do not want the same treatment. Engineered quartz is non-porous and never needs sealing. Natural granite is a quarried stone and some finishes benefit from a resealing routine. Your guide says which category yours falls into and what to clean it with.
Almost never a knife. It is chemical and thermal: oven cleaner, drain unblocker, paint stripper or bleach left sitting on the surface, and on engineered quartz a pan straight off a gas ring. Use a trivet, wipe anything caustic straight away, and the surface will outlast the kitchen around it.
Chips in stone can often be repaired in place. A tube of filler applied first makes a proper repair harder and more visible, so call us and describe it before anything goes near it.
We templated it, we cut it and we fitted it, so there is nobody to be referred to. The 5-year workmanship guarantee covers our fabrication and fitting, for every kitchen we fit, and the 25-year material warranty covers the stone itself against manufacturing defects (residential installations).
If something does not look right, ring us in the first week rather than living with it for a year. It is easier to put right while we still have your template drawing on the bench, and we would rather know.
Questions
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Fitting happens 5 to 10 working days after we template. How long the stage before that takes is set by your kitchen rather than by us, because we cannot template until the units are fitted and level. Quotation and choosing the surface usually run alongside your kitchen fit rather than after it.
Nothing at enquiry and nothing for the written quote. Your written quote sets out every payment stage and when each one falls due.
We cannot take the template, because a template taken off unfinished units produces a worktop that does not fit. We rebook, and the lead time restarts from the new template date. If you are unsure the day before, send a photograph of the units and we will tell you honestly whether to keep the appointment.
For the template, yes: join positions, overhangs and tap hole placement are agreed and signed off on the day. For installation, somebody needs to be on site with access for the whole visit, but it does not have to be you.
No. Stone is cut once, to the millimetre, from a template taken off the units as installed. Any company offering to template from a plan or from units that are not yet fixed is moving the risk of a misfit onto you.
We seat and seal them into the stone. We do not connect water, waste, gas or electrics. That is a plumber and an electrician, booked after us rather than alongside us, because fresh silicone needs to cure before the sink takes water.
Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.
Read all 35 See them on Google
Count as read from Google on 13 November 2026
“We recently had the Arctic Starburst worktop installed by Worktop WorX and it looks amazing. The subtle sparkle really catches the light and gives the kitchen a clean, modern feel. The Arctic Starburst surface feels high quality, durable, and is easy to keep clean. The finish and installation from Worktop WorX were spot on. Really happy with the result…”
“Great work, super helpful team. I'd definitely recommend!”
“Five stars isn’t enough. Professional, prompt, genuinely helpful. Legitimately impressed. Fair price and Karem treated me like a real person. That’s rare- and that’s why I m leaving this review.”
“I used Karem’s services 5 years ago for purchasing and fitting the quartz worktop in my then brand new kitchen. The price was reasonable and the service reliable and spot on, no delays in fitting, misunderstanding or excuses. I recommended him to a friend, who also used his services and they were happy too! If I need to order new kitchen work top again,…”
“Absolutely delighted with our new worktop from Worktop WorX. The Capri White finish looks incredible, clean, modern, and really brightens up the whole kitchen while pairing beautifully with the darker cabinetry. The quality of the worktop is outstanding, with a flawless finish and seamless installation that really shows the attention to detail. It’s not…”
“Kareem did the countertops dur8ng my kitchen remodel, and I was so impressed that I had him back to do the laundry room as well, which tells you everything you need to know. He is an absolute gem. Shows up when he says he will (which, let’s be honest, is rarer than it should be), does beautifully work, and clearly takes real pride in what he does. The…”
Step one
Plans, a sketch or photographs with rough run lengths. We reply with any questions, then a written itemised quote, and the quote costs nothing.
Prefer to talk it through? +44 7830 847489 · Contact us