From first message to a worktop you can put a kettle on

Undermount sink in a Calacatta Glacier worktop below the window, with herbs on the sill

Six steps, plus the one after handover. Nothing is payable until we template, and we fit 5 to 10 working days after that.

Six steps, and you always know which one you are on

Most worktop complaints are not about stone. They are about a company going quiet between the deposit and the fitting date. So here is the whole process written down, including the parts that are your job rather than ours.

Steps one to three cost you nothing and commit you to nothing. Step four is where the room is measured properly and the deposit is taken. Steps five and six happen inside 5 to 10 working days, and step seven is the one most companies do not bother with.

10

Working days from template, at the outside

3 hrsOn site for the template visit, at most
1Visit to fit a typical kitchen
15+Years our fitters have worked with stone

Get a fixed quote

The process

What happens at every stage, and who has to do it

Each step links through to the service page if you want the full detail on that part.

  1. Tell us about the kitchen

    Plans, a sketch or photographs with rough run lengths. We come back with a range before anybody gets in a van.

    You do not need drawings to start. A photograph of the room with a tape measurement written along each run tells us most of what we need for a first number. Better still, if you have a kitchen plan from a supplier, send that.

    We read it for the things that move a price: how many corners, whether an island has an overhang, whether a window sill sits inside a run, whether there are drainer grooves. Then we come back the same working day with an indicative range, so you find out whether we are in the right conversation before anyone visits.

    Get a fixed quote

    Worth knowing

    • Send plans, a sketch, or photos with rough measurements
    • Tell us the sink and hob if you have already chosen them
    • Say if you are keeping existing units: that changes the whole sequence
    • Nothing to pay and nothing to sign at this stage
  2. Choose your surface

    Order the samples you are seriously considering and look at them in your own kitchen, at night, under your own lights.

    There are 181 surfaces in the range across quartz, granite and sintered stone, from £110/m² supply at the entry point. Narrowing that down on a screen is hard, which is why quartz samples are free and sent to your door.

    Look at them where the kitchen actually is, next to the door colour and the flooring, in the evening under your own lighting. Showroom lighting flatters every slab ever quarried. And we will tell you where a cheaper surface does the same job. The gap between a mid-range quartz and the top of the range is usually about pattern, not performance.

    Order free samples

    Worth knowing

    • Quartz: engineered, non-porous, consistent from slab to slab
    • Granite: quarried, every slab different, untroubled by heat off the hob
    • Dekton and sintered stone: ultra-compact and thin enough for fine mitred edges
    • Order the three you are actually deciding between, not ten
  3. Fixed written quote

    Every cut-out, edge, upstand and join itemised, with the supply rate shown separately from the work.

    The quote is a list, not a number. Square metres per run against the supply rate for your chosen slab, then the edge profile, each cut-out, the joins, the upstands or splashbacks by the metre, and templating, fabrication and fitting as their own lines. If you drop something later, you can see exactly what comes off.

    Approve it and that is what you pay. The only two things that move it are a change you make to the specification, or a room that measures differently at template from the plan we quoted against. In either case you get the revised number before a slab is cut, not an invoice afterwards.

    Start a quote

    Worth knowing

    • Supply price shown separately from fabrication and fitting
    • Cut-outs priced individually, so the maths is visible
    • Join count estimated now and confirmed at template
    • Still nothing payable at this point
  4. Template

    Two to three hours on site

    The room is plotted digitally once your units are fitted and level. This visit is where the deposit is taken and your fitting date is fixed.

    A templater plots your kitchen as it actually is: every wall angle, every bow in the plaster, every return that is not quite square. The drawing that comes off it is what the cutting machine follows. No stone is ever cut from a plan.

    It takes two to three hours for a typical kitchen, longer with an island or several returns. While we are there you agree the join positions, the overhangs and the tap hole placement standing in the room rather than finding out later. You sign off the drawing, the deposit is taken, and the fabrication slot is booked with your fitting date attached to it.

    Worth knowing

    • Units must be fitted, fixed and level before we can template
    • A Belfast or butler sink has to be installed and set at its final height first
    • Your sink, tap and hob need to be on site: we machine to the physical item
    • Somebody has to be there who can sign off the join positions
  5. Fabrication

    Cut, mitred and polished to your template, then dry-assembled on the bench with the sink and hob dry-fitted.

    Your pieces are laid out on the actual slab first. On a material with real movement in it, that layout decides whether a vein runs through a join or stops dead at it. Then it is cut to the template drawing, mitred where the edge detail calls for it, and polished to match the factory face.

    Before anything is loaded, the kitchen is assembled on the bench: runs laid out together, joins pulled up, your sink dropped into its aperture and the hob offered up. Anything wrong is found there, where it costs an hour, instead of in your kitchen where it costs a day and a slab.

    Worth knowing

    • Joins placed over a cabinet gable, never spanning an unsupported gap or a cut-out
    • Finished joins are typically 2–3mm, colour-matched and sanded flush
    • Sink and hob dry-fitted before dispatch
    • Upstands and splashbacks cut from the same slab run at the same time
  6. Installation

    Scribed to your walls, joins pulled and sanded flush, sink and hob seated and sealed, then cleaned down.

    Floors and units are protected before anything comes through the door. Pieces are dry-laid, the back edges scribed to the real line of your walls, then bedded and levelled onto the units. Joins are drawn up, bonded with colour-matched adhesive and sanded flush so there is nothing to feel under your hand.

    The sink and hob are seated into the stone and sealed. They are not connected. That is a plumber and an electrician, and they should be booked after us rather than alongside us, because fresh silicone needs to cure before it takes water. The balance is due before installation, so fitting day is about the work.

    Worth knowing

    • A straightforward run is a morning; an island and splashbacks will take most of the day
    • Parking close to the property matters: every piece is carried in by hand
    • We do not connect water, waste, gas or electrics
    • Surfaces cleaned down and protection lifted before we leave

Our lead time promise

Templated to fitted in 5 to 10 working days

Not three to seven days from your enquiry, but from the day we template. That is the only measurement of lead time that means anything, because it is the only point at which the work can actually start.

Most of the trade quotes seven to ten working days for the same stage. The reason is usually that the company you bought from is not the company cutting the stone: your kitchen goes into a queue at a fabricator who has never spoken to you. We cut in our own workshop, so the only queue is ours and we can see the whole of it.

You get the date at template

Not a vague week. A fitting date, fixed when the drawing is signed off, with the fabrication slot booked against it.

The three things that move it

  • A surface we have to bring in rather than one already in stock
  • A specification change made after the template has been signed off
  • A template visit that had to be abandoned because the kitchen was not ready, which restarts the clock from the rebooked date

If any of those happen we tell you the same day. Silence is the thing people actually complain about.

Get a fixed quote

Template day

The prep checklist, so the visit is not wasted

Run this the day before, not on the morning. If one line is not true, the template cannot be taken and the lead time restarts from the rebooked date.

If you are not certain about any of it, send us a photograph of the units the day before. We would far rather move an appointment than send a templater to a kitchen that is not ready.

Ready before we arrive

Two to three hours on site

  • All base units fitted, fixed to the wall and levelled on their final feet
  • Belfast or butler sink installed and set at its finished height
  • Sink, tap and hob physically on site: boxed is fine, a listing on a website is not
  • Appliances that sit under the worktop present, or their exact dimensions confirmed
  • End panels and any tall unit that a run dies into already fitted
  • Walls plastered and at their final thickness (tiling comes after the worktop)
  • Sockets and switches in their final positions if you are having a splashback
  • Worktops clear, with room to work along every run
  • Somebody on site for two to three hours who can make decisions
Calacatta Glacier running around three walls of a taupe shaker kitchen, past the oven housing to the sink

Paying for it

Deposit at template, balance before installation

Two payments, both at points where something concrete has happened. Nobody should be asking you for a large sum before they have measured the room.

Nothing

Enquiry and quotation

Indicative range, samples and the full itemised written quote all cost nothing. There is no charge for a site visit at this stage and no obligation attached to any of it.

Deposit

At template

Taken once you have signed off the template drawing. That is the point the slab is committed to your kitchen and the workshop slot is booked, so it is the first point at which money is fair to ask for.

Balance

Before installation

Settled before the fitting day rather than on the doorstep, so nobody is doing sums while a worktop is being carried through the house.

Your quote sets out both amounts before you commit to anything, and the figure you approve is the figure you pay unless you change the specification or the room measures differently at template.

Get a fixed quote

Step 07

Aftercare, which is where most companies stop reading

The job is not finished when the van leaves. A stone worktop has a couple of genuine weaknesses, and knowing them on day one is worth more than any warranty document.

A care guide for your stone, not a generic leaflet

Quartz, granite and sintered surfaces do not want the same treatment. Engineered quartz is non-porous and never needs sealing. Natural granite is a quarried stone and some finishes benefit from a resealing routine. Your guide says which category yours falls into and what to clean it with.

What actually damages a stone worktop

Almost never a knife. It is chemical and thermal: oven cleaner, drain unblocker, paint stripper or bleach left sitting on the surface, and on engineered quartz a pan straight off a gas ring. Use a trivet, wipe anything caustic straight away, and the surface will outlast the kitchen around it.

If you chip an edge, ring before you fill it

Chips in stone can often be repaired in place. A tube of filler applied first makes a proper repair harder and more visible, so call us and describe it before anything goes near it.

The same company answers the phone

We templated it, we cut it and we fitted it, so there is nobody to be referred to. The 5-year workmanship guarantee covers our fabrication and fitting, for every kitchen we fit, and the 25-year material warranty covers the stone itself against manufacturing defects (residential installations).

If something does not look right, ring us in the first week rather than living with it for a year. It is easier to put right while we still have your template drawing on the bench, and we would rather know.

Questions

What people ask before they commit

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

How long does the whole process take?

Fitting happens 5 to 10 working days after we template. How long the stage before that takes is set by your kitchen rather than by us, because we cannot template until the units are fitted and level. Quotation and sample stages usually run alongside your kitchen fit rather than after it.

02

When do I have to pay, and how much?

Nothing at enquiry, nothing for samples and nothing for the written quote. A deposit is taken at the template visit once you have signed off the drawing, and the balance is settled before installation. We do not ask for money before we have seen and measured the room.

03

What happens if my kitchen is not ready on template day?

We cannot take the template, because a template taken off unfinished units produces a worktop that does not fit. We rebook, and the lead time restarts from the new template date, which usually costs a week. If you are unsure the day before, send a photograph of the units and we will tell you honestly whether to keep the appointment.

04

Do I need to be at home?

For the template, yes: join positions, overhangs and tap hole placement are agreed and signed off on the day. For installation, somebody needs to be on site with access for the whole visit, but it does not have to be you.

05

Can you fit worktops before the kitchen units go in?

No. Stone is cut once, to the millimetre, from a template taken off the units as installed. Any company offering to template from a plan or from units that are not yet fixed is moving the risk of a misfit onto you.

06

Do you connect the sink, tap and hob?

We seat and seal them into the stone. We do not connect water, waste, gas or electrics. That is a plumber and an electrician, booked after us rather than alongside us, because fresh silicone needs to cure before the sink takes water.

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26   See them on Google

01/01
★★★★★
“Absolutely delighted with our new worktop from Worktop WorX. The Capri White finish looks incredible, clean, modern, and really brightens up the whole kitchen while pairing beautifully with the darker cabinetry. The quality of the worktop is outstanding, with a flawless finish and seamless installation that really shows the attention to detail. It’s not only stylish but also feels incredibly durable and practical for everyday use. Cam handled everything from start to finish and made the whole process smooth and stress-free. Professional, reliable, and clearly takes pride in the work. Highly recommend Worktop WorX. We couldn’t be happier with the result!”
Dawid MyszorGoogle review · Capri White
★★★★★
“Excellent service and top quality workmanship. The worktop looks absolutely amazing and the attention to detail is impressive. The team was professional, punctual, and very easy to work with. Highly recommended for anyone looking for a premium kitchen worktop! 👌”
Costin RomanGoogle review
★★★★★
“Excellent service from start to finish. The team at Worktop Worx were professional, friendly, and really paid attention to detail. They listened to what I wanted, gave helpful advice, and delivered a high-quality finish. The worktop looks amazing and has completely transformed the space. Everything was completed on time and left clean and tidy. Highly recommended 5/5”
Kam 98Google review
★★★★★
“I am really happy with the work! He fitted my kitchen granite worktop really nicely and got the job done on time, just as promised. He was friendly, professional, and made sure everything was done the way I wanted. Would definitely recommend Karam to anyone looking for a great job!”
esther boaduGoogle review · Granite
★★★★★
“We recently had our kitchen worktops supplied and fitted by Worktop WorX using Laurent Gold sintered stone, and we couldn’t be happier with the result. The finish, quality, and attention to detail were outstanding from start to finish. Karem was incredibly helpful throughout the whole process professional, knowledgeable, and always available to answer…”
Gabriel TivadarGoogle review · Laurent Gold sintered stone
★★★★★
“We have a new kitchen. Our builder recommended Worktop Worx for our worktop. Now we have an amazing worktop very good price too. Really recommend. They were really good to us. 10/10”
j thomasGoogle review
★★★★★
“I used Karem’s services 5 years ago for purchasing and fitting the quartz worktop in my then brand new kitchen. The price was reasonable and the service reliable and spot on, no delays in fitting, misunderstanding or excuses. I recommended him to a friend, who also used his services and they were happy too! If I need to order new kitchen work top again,…”
shoshencenceGoogle review · Quartz
★★★★★
“Kareem did the countertops dur8ng my kitchen remodel, and I was so impressed that I had him back to do the laundry room as well, which tells you everything you need to know. He is an absolute gem. Shows up when he says he will (which, let’s be honest, is rarer than it should be), does beautifully work, and clearly takes real pride in what he does. The…”
Susie WigginsGoogle review
★★★★★
“We recently had a Calacatta Gold worktop installed by Worktop Worx and are really pleased with the result. It has completely transformed our kitchen, much brighter, modern, and high-end compared to our old wooden surface. The team were professional, efficient, and the finish is excellent with great attention to detail. The worktop looks amazing and is…”
RO74 TVXGoogle review · Calacatta Gold
★★★★★
“We recently had the Arctic Starburst worktop installed by Worktop WorX and it looks amazing. The subtle sparkle really catches the light and gives the kitchen a clean, modern feel. The Arctic Starburst surface feels high quality, durable, and is easy to keep clean. The finish and installation from Worktop WorX were spot on. Really happy with the result…”
Han LeeGoogle review · Arctic Starburst
★★★★★
“We installed new kitchen and got the worktop and splash back from them. Their professional work and commitment was wonderful. Quality of work compared to price was way too good. Thank you guys.”
MD Matinur RahmanGoogle review
★★★★★
“Karem did a fantastic job at installing my antique bronze mirror for my coffee/drinks unit. He was really professional and his communication throughout was clear.”
KalsGoogle review
★★★★★
“Professional, polite and friendly service. Very pleased with finished product.”
costas andrewsGoogle review
★★★★★
“Great experience from this company, I am happy with the materials, fitting and the team.”
Rrahim BratiGoogle review
★★★★★
“Perfect service,the best on this job”
Kleant IstrefiGoogle review
★★★★★
“I am really happy with my worktop. It is beautiful and the service provided was second to none. I totally recommend.”
Magaly RGoogle review
★★★★★
“Nice work from worktop worx. Highly recommended”
Rasika KumarageGoogle review
★★★★★
“I recently had my kitchen worktop and splashback done by Karem from Worktop WorX and i am very pleased with the result. From the initial consultation and measurements to the final installation, the whole process was smooth and professional. The attention for details and the quality made the difference and everything was finished to a high standard. I…”
Alexandru BalintGoogle review
★★★★★
“Lovely team, business and quality motivated, prompt delivery with installation. Affordable prices. Wide range of worktops available. High recommendation”
Loreta SkalisieneGoogle review
★★★★★
“Karem did an excellent job on my kitchen. He was professional, reliable, and paid great attention to detail. The finish looks amazing and has completely transformed my kitchen. Thank you! Would highly recommend his work!”
Catalina RaduGoogle review
★★★★★
“Really impressed with the quality and finish of these worktops. Great range of materials, precise fabrication, and smooth communication throughout. The whole process was easy and the final result looks fantastic. Highly recommend!”
Nastasia DragoGoogle review
★★★★★
“Karim is excellent, he did superb job with Templeting and fitting my kitchen, highly recommend”
M SgGoogle review
★★★★★
“We had a fantastic experience with Worktop WorX from start to finish. The team was professional, friendly, and delivered excellent workmanship. We chose the beautiful Capri White worktop, and it has completely transformed our kitchen with its elegant, high-end look.”
NoniGoogle review · Capri White
★★★★★
“Great service. Super quick and easy communication. I love my new worktop 🥹🥹”
Sara ArghirGoogle review
★★★★★
“Great work, super helpful team. I'd definitely recommend!”
Andreea TanaseGoogle review
★★★★★
“Excellent work and highly recommend. Very professional and did an outstanding job with my worktop. Karem responded very quickly and swiftly, top guy!”
Faisal KGoogle review

Step one

Start at the beginning. Send us the kitchen.

Plans, a sketch or photographs with rough run lengths. An indicative range comes back the same working day, and nothing is payable until we template.

Prefer to talk it through? +44 7830 847489 · Contact us

Get a fixed quote Order free samples