Skip to content

Richmond upon Thames · TW12

Stone bar tops in Hampton

A bar top takes weight on its front edge all evening, so the overhang and what carries it matter more than the slab does.

  • 5.0from 26 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Hampton kitchens

The buildings and streets around Hampton

Georgian riverside houseVictorian cottage1930s semipostwar detachedmodern riverside flats

Getting stone bar top work in Hampton right is mostly a matter of knowing what you are dealing with before the order goes in, and that means looking properly. Riverside houses with kitchens raised above flood level or set behind a lightwell, small period cottages with sub-2.5m runs, and a large interwar suburban belt inland where the standard job is a rear extension with a 3.6m run and an island of about 2m. Neither case is harder than the other for us. Both start with somebody standing in the kitchen with a tape.

A hundred and forty years of alterations sit under the current kitchen, and the worktop is what has to sit flat on top of all of it. The material question follows from what actually gets put down on it, which is citrus, ice and wet glasses rather than hot pans and chopping boards. The front edge takes the wear, so the front edge takes the detail.

The rear room is generous with a chimney breast in one corner, so the run gains a return and two scribed ends whatever the plan drew. A bar in a house of this age is usually either the end of a through-lounge or a cellar conversion, and the cellar is the harder of the two because the headroom fixes the counter height before anybody else gets a say. Where the walls give nothing, the bar stands on its own.

Most of what we quote on here is Georgian riverside house, Victorian cottage, 1930s semi, postwar detached and modern riverside flats. Each of those behaves differently once the old top comes off.

True everywhere

Stone bar tops, in short

  • Anything past about 300mm of unsupported overhang gets steel or a corbel underneath.
  • The front edge is the one people touch, so it is profiled and polished on all exposed faces.
  • Quartz is the usual choice indoors; porcelain and sintered stone where drinks and citrus are constant.
  • A bar top is fitted level to itself, not to the floor, because floors in older buildings rarely are.
Borough
Richmond upon Thames
Postcodes
TW12
Covered on
our south west London run
Fitted
5–10 working days from template

The place

Why Hampton is its own job

A worktop is made to fit one kitchen, and in Hampton the kitchen and the way into it are what we work from. The riverside road is narrow with limited pull-in and floods on high tides, several houses are reached by a footpath from a shared parking area, while the suburban roads inland have driveways and easy standing. In the flood-prone riverside properties the plinths and carcasses are often raised or moisture-resistant, so worktop heights sit higher than standard - confirm before templating. None of this needs to be a drama. It needs somebody to measure it properly and write down what they found.

The work

What bar tops involves

What is covered is the template, the machining, the support fixed into the frame and the fitting, with the frame itself either built by us as joinery or by whoever is already on site. We measure the frame before we measure the top, because a bar top is set level to itself and the frame is what it will be packed off. You end up with a front edge that takes people leaning on it all evening without the top shifting, because the load was worked out before the stone was ordered.

Most bar tops we are asked to quote began life on a plan as a seating projection that somebody assumed the cabinets would carry. Flat steel is let in flush with the bearing face of the frame, so the stone still lands on a continuous plane rather than on a bar standing proud of everything else. The back is scribed to whatever the plaster does, and the front is set out from a line of its own. Frame checked, steel in, stone down.

Worktop join finished flush against a wall
Corners and joinsSee the options

The money

What it costs in Hampton

A bar top is priced from what holds it up as much as from the stone, because the steel, the corbels and the time spent fixing them are real lines rather than an allowance. The island is normally the largest single piece in the kitchen, which makes it the piece that sets the carry and sometimes the price. Thickness, finish and colour move a slab within the £110 to £550 supply band before anyone touches it, so that figure is settled by what you pick rather than by the room. You see what the projection costs before agreeing to it.

period detached houses and villas

The carry, and what it rules out

Some drives are wide enough for the van and too short for the tail lift, because the tail lift needs its own clear metre behind the vehicle. A trade bar is fitted around opening times, so the window the van has and the window the room has are rarely the same window. Permits are sorted before a corbel is drilled.

period detached houses and villas

What Hampton asks for

Where a family has been living around a building site for months, the finish date carries more weight than any other part of the specification. Where the same detail is repeating across several rooms the support gets standardised once and then cut to length, which is cheaper than drawing it each time. A bar in constant use is a maintenance decision as well.

Nothing about the houses on this patch predicts how much of this we do, because it is not housing work. What the houses ask for is worktop design & quotation, worktop templating and worktop installation. The stone, the machining and the crew are the same.

Access

Getting stone into a Hampton kitchen

The riverside road is narrow with limited pull-in and floods on high tides, several houses are reached by a footpath from a shared parking area, while the suburban roads inland have driveways and easy standing.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted, working days from template. The same on this patch as every other.

south west London patch

Hampton is covered on our south west London run, along with the rest of Richmond upon Thames.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Hampton

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you cover Hampton?

Yes. Hampton is on the patch, and the postcodes we work here are TW12. It is worked on our south west London run, along with the rest of Richmond upon Thames. Where the drive falls away from the house the trolley wants to run, and where it climbs the same load has to be pushed the whole way up. A bar fit runs longer than a worktop run, because the frame, the support and the stone are three stages and only the last of them is quick. The nose stays wrapped until the frame is ready for it. The template happens in your kitchen and so does the fit, so there is nothing to visit and nothing to collect.

Why would bar tops in Hampton be any different from anywhere else?

The party wall is the straightest surface in the house and everything else has moved away from it over a century. A bar in one of these houses is either the end of a through-lounge or a cellar conversion, and the two behave differently. A long counter is a beam before it is a surface. Where a corner is a couple of degrees off, a mitre cut to a theoretical ninety degrees opens on the wall side and there is no closing it afterwards. A bar top is levelled to itself rather than to what it stands on, so the packing goes into the frame and the stools take up whatever the floor is doing. Steel spans what a carcass cannot.

What is the carry like in Hampton?

A level threshold with hard standing outside it is the one arrangement where a full run goes in without a single re-grip. The steel and the corbels travel that same route and go in first, so a bar is three separate carries into one room rather than a single delivery. A bar top is heavier than it looks because the apron is solid. A visitor or a neighbour parked on the drive is a five-minute problem at eight in the morning and an hour-long one at eleven. That has to cover more than the unload, since the corbels, the flat bar and the fixings all come off the van well before the top does. Fitting a bar top is slower than carrying one.

Is Hampton really a bar tops area?

Not especially, and pretending otherwise would be simple enough. What the research on this patch actually lists is worktop design & quotation, worktop templating and worktop installation. It is a fact about the local housing rather than about the work. The job is quoted, cut and fitted the same way wherever on the patch it lands. An open-plan extension puts the worktop in the middle of the living space, so it is looked at from the sofa as well as worked on. A bar is nearly always the last thing added to a project, so it is templated on a visit of its own once the joinery around it has stopped moving. One detail across several rooms keeps the fixings the same. Extension budgets are usually well spent by the time the worktop is ordered, which is where the choice between quartz and a thinner sintered stone actually gets made. Harder use and stronger cleaning products push the answer towards porcelain or sintered stone, because a resin-bound surface is the one that shows what has been left standing on it. The evening use is what the piece is sized for.

Where does the money go on a Hampton worktop?

It is the heaviest single piece in the kitchen, so the number of hands needed on the day and the route in are worked out from that piece rather than from the runs. A bar laid over that is a second level rather than a wider one, so it wants a spine underneath it and a settled detail where the two heights meet. What the shape gives in length it takes back in support. Supply only, material is £110 to £550 per square metre, with templating, fabrication and fitting quoted on their own lines.

What needs to be ready before you come to Hampton?

The stone carries the scribe because the wall cannot be persuaded, so back edges are cut oversize and eased in rather than dropped straight down. Where the nose has to be carried past something fixed the support moves rather than the stone, since a corbel landing in the knee space is worse than no corbel at all. A bar top is set to one datum along its own length. Send the length you want, the number of stools, and photographs walking from the pavement through to the room, including the cellar stair if the bar is going down there. Mixed ownership means the decision-maker is not always the person who lets us in, so it is worth being clear early about who signs the quote off. A home bar is discretionary work, so the edge profile, the corbel detail and the radius on the nose are worth settling properly rather than defaulting to whatever is quickest. Sealing a bar top is a yearly job and we say so.

What if a worktop will not physically fit through the building?

If a piece cannot be got in at all, we say so at the template rather than on the day. Splitting a run costs a join, and that is the price of getting stone into the room at all. A piece travels on edge, never flat, because on edge is how stone of that length carries its own weight. The tail lift is still the pinch point, because the piece has to be walked off it onto the trolley while it is sitting at chest height. A top with a bonded apron on the front arrives deeper than a worktop and behaves like a beam, so there is no easing it round a turn at all. Where the way in is awkward the bar is drawn in tiers.

Is taking the old top off part of the job?

If you want the old top kept for a garage or a utility, say so and it stays on site. Old laminate is light and awkward rather than heavy, so it is usually the easier half of the day. The sink and hob are lifted out with the old top and kept aside if you are reusing them. Where the front garden has been paved over completely the van stands close to the house, and the route in is still a standard front door. Where the clock is running the frame is levelled and the steel is in before the top ever leaves the tail lift. The frame is checked before anything comes off the van.

Do you cut drainer grooves on Hampton kitchens?

Grooves are machined in the workshop at the same time as the bowl cut-out, because they cannot be done well in a kitchen. Grooves and an undermounted bowl are usually specified together, since the grooves are run to the bowl edge. Where there is no room for a separate drainer, grooves are usually what gets specified instead. Ceilings are generous and the rooms are narrow, so the runs are long, the aisle is tight and there is nowhere to stand a slab on edge. A bar top put into a room like that is an overhang question first, because the nose has to carry people leaning on it long after the slab has stopped being interesting. Nothing about a bar top is designed around a wall.

Upstands or a full-height splashback?

Ordered later from a different batch, the match is not reliable where the two pieces meet. An upstand is a slim strip that follows the worktop up the wall; a full-height splashback runs from the worktop to the underside of the wall units. It is quoted by area like the worktop, so a long run is a material line rather than a trim. These were built with a scullery that has since been swallowed by an extension, leaving a change of floor level roughly where the run crosses. In a cellar the headroom fixes the counter height first and everything else works back from it, and the stair down is the tightest part of the route because stone carried downward is harder to control than stone carried up. The apron is bonded on the bench, never built up in the room.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 on Google →
Excellent work and highly recommend. Very professional and did an outstanding job with my worktop. Karem responded very quickly and swiftly, top guy!

Faisal K

Google review

Perfect service,the best on this job

Kleant Istrefi

Google review

I recently had my kitchen worktop and splashback done by Karem from Worktop WorX and i am very pleased with the result. From the initial consultation and measurements to the final installation, the whole process was smooth and professional. The attention for details and the quality made the difference and everything was finished to a high standard. I definitely recommend Worktop WorX to anyone looking for reliable and high quality kitchen work

Alexandru Balint

Google review

Next step

Stone bar tops in Hampton, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489