Skip to content

Ealing · W7

Splashbacks and upstands in Hanwell

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

Hanwell kitchens

What the kitchens here are actually like

Victorian terraceEdwardian terrace1930s semiHanwell village older stock

Lath and plaster, a settled floor and a hall with a turn in it are the three things that decide how this job runs. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. Siliconed to the top, never grouted.

Terraces with rear kitchen extensions and side-return infills, largely first proper renovations on a controlled budget.

The Uxbridge Road and the approaches to the viaduct congest badly, terraces have no driveways, and the streets near the station are permit-controlled. Runs of 3.5m to 4.5m, single-bowl undermount, quartz chosen over granite on price. A lot of these terraces still have the original outside WC standing in the rear return, so the top has to stop and restart around it rather than run through.

The addition wall is half a brick thick in places and has usually had a damp course injected and been re-plastered, which leaves it neither flat nor consistent. A 100mm upstand bedded on silicone is the honest answer where the plaster bows, because it rides what a tall panel exposes. Cut from the same slab run as the tops.

What turns up on the job sheets is Victorian terrace, Edwardian terrace, 1930s semi and Hanwell village older stock. The differences between them show up at template, not at enquiry.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered on our west London run. Fitted 3–7 working days from template.

Victorian and Edwardian terraces

Getting stone into the room

Without a bay the van ends up on a single yellow with a crew member watching it, which takes a pair of hands off the carry. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. One trip is always better than three.

Victorian and Edwardian terraces

What gets asked for here

Honestly, this is not what we do most on this patch. Worktop replacement, worktop installation and worktop templating come up more often. That is a statement about the local housing rather than about the work, and nothing about how it is quoted, cut or fitted changes because of it.

Victorian and Edwardian terraces

True everywhere, stated once

What decides between a slim upstand and a full-height splashback is nearly always the wall: what it is made of, how flat it is, and where the sockets ended up.

Access

Getting stone into a Hanwell kitchen

The Uxbridge Road and the approaches to the viaduct congest badly, terraces have no driveways, and the streets near the station are permit-controlled.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

west London patch

Hanwell is covered on our west London run, along with the rest of Ealing.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in Hanwell

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you cover Hanwell?

Yes. Hanwell is on the patch, and the postcodes we work here are W7. It is worked on our west London run, along with the rest of Ealing. Without a bay the van ends up on a single yellow with a crew member watching it, which takes a pair of hands off the carry. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. One trip is always better than three. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Does the housing in Hanwell change how worktop splashbacks & upstands works?

The addition wall is half a brick thick in places and has usually had a damp course injected and been re-plastered, which leaves it neither flat nor consistent. A 100mm upstand bedded on silicone is the honest answer where the plaster bows, because it rides what a tall panel exposes. Cut from the same slab run as the tops. A lot of these terraces still have the original outside WC standing in the rear return, so the top has to stop and restart around it rather than run through.

How does the stone actually reach a kitchen in Hanwell?

The Uxbridge Road and the approaches to the viaduct congest badly, terraces have no driveways, and the streets near the station are permit-controlled. Everything comes through the front door and down the hall, so the tightest point on the route is usually the newel post at the foot of the stairs. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. Joint positions follow from that.

Is Hanwell really a worktop splashbacks & upstands area?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop replacement, worktop installation and worktop templating. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Same batch, same run, same day. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Siliconed to the worktop, never grouted.

Why do two Hanwell kitchens the same size price differently?

A galley run down a side-return extension usually measures longer than a slab will give in one length, so a join is designed in from the start rather than discovered. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Joint placement is a decision, not an accident. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What has to be finished before you can template?

Where a corner is a couple of degrees off, a mitre cut to a theoretical ninety degrees opens on the wall side and there is no closing it afterwards. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Make the wall good first, or accept the detail. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. Where ownership is split across a building, the common parts belong to someone else and the carry route is negotiated rather than assumed. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Same slab run as the tops.

Next step

Splashbacks and upstands in Hanwell, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489