
Greenwich · SE10 SE3
Splashbacks and upstands in Maze Hill
Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.
- 5.0from 23 Google reviews
- 25-year material · 5-year workmanship
- Fitted 3-7 working days from template
Maze Hill kitchens
What the kitchens here are actually like
The kitchen normally sits in the back addition or a later side return, which puts the run against the oldest and least straight wall in the building. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. Same slab run, same day, same batch.
Whole houses tend to have a rear kitchen-diner running the full width of a back extension, while the converted flats keep a small galley squeezed into a former bedroom or the return.
Larger Georgian and Victorian houses on the park side, many divided into maisonettes. The hill is the problem, steep gradients up from the park gate, few dropped kerbs, and long paths behind front railings, so a two-man carry uphill on wet steps needs planning.
The flat entrance door and the internal doorways are usually tighter than the communal stairs, which is the opposite of what most people assume. A 100mm upstand bedded on silicone is the honest answer where the plaster bows, because it rides what a tall panel exposes. Cut from the same slab run as the tops.
What turns up on the job sheets is Georgian house, Victorian villa, Edwardian terrace and flat conversion. The differences between them show up at template, not at enquiry.
True everywhere
Splashbacks and upstands, in short
- Cut from the same slab run as the worktop, at the same time.
- Ordered later, from a different batch, the match is not reliable where the pieces meet.
- Socket and switch positions must be final before templating.
- The joint to the worktop is siliconed, never grouted.
Covered on our south east London run. Fitted 3–7 working days from template.
period detached houses and villas
What gets asked for here
Party-wall and lease conditions in a converted building set when noisy work can happen, which shapes the fitting day more than the kitchen does. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Sockets final before template.
The research on this patch does not put this among the three commonest jobs. Worktop installation, worktop templating and worktop replacement do. That changes how often we are here, not how the work is done.
period detached houses and villas
The building, and what it does to the job
Flat conversions here often put the kitchen on the first or second floor with no lift, so pricing has to reflect a stair carry rather than a doorstep drop.
period detached houses and villas
True everywhere, stated once
What decides between a slim upstand and a full-height splashback is nearly always the wall: what it is made of, how flat it is, and where the sockets ended up.
Access
Getting stone into a Maze Hill kitchen
The hill is the problem, steep gradients up from the park gate, few dropped kerbs, and long paths behind front railings, so a two-man carry uphill on wet steps needs planning.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
south east London patch
Maze Hill is covered on our south east London run, along with the rest of Greenwich.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop splashbacks & upstands in Maze Hill
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Is Maze Hill on your patch?
Yes. Maze Hill is on the patch, and the postcodes we work here are SE10, SE3. It is worked on our south east London run, along with the rest of Greenwich. A free-parking street with cars both sides can still leave the van forty metres away, and that distance is carry, not driving. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Handling is where these pieces get damaged. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
Why would worktop splashbacks & upstands in Maze Hill be any different from anywhere else?
Cornice, picture rails and deep skirting survive in converted rooms, so the run stands off the wall and the back edge follows the units rather than the plaster. Where a client wants a full-height piece behind the hob, it usually sits in the old chimney recess, and that recess is rarely square top to bottom or side to side, so it has to be templated as a trapezium rather than a rectangle. The wall makes that decision, not the brochure. Flat conversions here often put the kitchen on the first or second floor with no lift, so pricing has to reflect a stair carry rather than a doorstep drop.
How would you get a worktop into a property in Maze Hill?
The hill is the problem, steep gradients up from the park gate, few dropped kerbs, and long paths behind front railings, so a two-man carry uphill on wet steps needs planning. A walk-up with winders at every half-landing means the piece is rested and re-gripped on the way, so the crew size goes up before the piece size comes down. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. Joint positions follow from that.
Is Maze Hill really a worktop splashbacks & upstands area?
Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop installation, worktop templating and worktop replacement. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. Party-wall and lease conditions in a converted building set when noisy work can happen, which shapes the fitting day more than the kitchen does. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Same batch, same run, same day. A kitchen carved out of a larger room sits under whatever the original plan left behind, so the run frequently ends at a blocked doorway or a boxed-in service. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Siliconed to the worktop, never grouted.
What moves the number on a quote around here?
Two parallel runs with a walkway between them is the most efficient shape there is on a slab, because both pieces nest as straight lengths with almost no waste. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Joint placement is a decision, not an accident. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What needs to be ready before you come to Maze Hill?
A run can measure dead right at both ends and still belly out in the middle, which only appears once the template plots the intermediate points. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. An upstand rides what a panel exposes. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. Where ownership is split across a building, the common parts belong to someone else and the carry route is negotiated rather than assumed. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Same slab run as the tops.
Related
More around Maze Hill
Other work we do in Maze Hill
Next step
Splashbacks and upstands in Maze Hill, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.