Skip to content

Merton · KT3 SW20

Splashbacks and upstands in Motspur Park

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

Motspur Park kitchens

What the kitchens here are actually like

1930s semi1950s terracePostwar detached

A side passage and a back door mean the stone rarely has to come through the house, which changes the job more than most people expect. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. The wall decides, not the brochure.

Plots are deeper here than in inner Merton, so kitchens open into full-width rear extensions with bifolds and a genuine island rather than a peninsula. Two-run layouts with a 3m island are common in the larger detached houses.

The level crossing by the station holds traffic and can add a long wait to a timed delivery, so the run is planned around it. Otherwise access is straightforward with driveways and wide side returns.

Solid brick with a render coat is firm to work against and out of plumb, so the scribe at worktop height is different from the one at plinth level. These kitchens are nearly always retiled at least twice, and stripping the old tiles takes the bottom course of plaster with it because the original laminate top ran underneath the tiles rather than up to them. Cut from the same slab run as the tops.

What we are usually templating in is 1930s semi, 1950s terrace and Postwar detached. That mix is why two jobs on the same road can run completely differently.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered on our south west London run. Fitted 3–7 working days from template.

1930s and inter-war semis

Getting stone into the room

A drive that shelves towards the house needs the van chocked and the trolley controlled, since a loaded A-frame gathers speed quickly on a slope. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. Handling is where these pieces get damaged.

1930s and inter-war semis

What gets asked for here

Honestly, this is not what we do most on this patch. Worktop installation, worktop design & quotation and worktop templating come up more often. That is a statement about the local housing rather than about the work, and nothing about how it is quoted, cut or fitted changes because of it.

1930s and inter-war semis

The building, and what it does to the job

Islands out here are frequently sited over a raised floor slab in the new extension, so check the finished floor level and unit height against the rest of the kitchen before templating.

Access

Getting stone into a Motspur Park kitchen

The level crossing by the station holds traffic and can add a long wait to a timed delivery, so the run is planned around it. Otherwise access is straightforward with driveways and wide side returns.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

south west London patch

Motspur Park is covered on our south west London run, along with the rest of Merton.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in Motspur Park

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Is Motspur Park on your patch?

Yes. Motspur Park is on the patch, and the postcodes we work here are KT3, SW20. It is worked on our south west London run, along with the rest of Merton. A drive that shelves towards the house needs the van chocked and the trolley controlled, since a loaded A-frame gathers speed quickly on a slope. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. Handling is where these pieces get damaged. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Why would worktop splashbacks & upstands in Motspur Park be any different from anywhere else?

A detached house of this age has a drive, a side path and a back door, so access is rarely the constraint and the design can follow the room. That leaves a ragged band right where the upstand has to sit, which is fine for a 100mm upstand that covers it, but a full-height splashback needs the wall made good first or it will rock on the high spots. Cut from the same slab run as the tops. Islands out here are frequently sited over a raised floor slab in the new extension, so check the finished floor level and unit height against the rest of the kitchen before templating.

How would you get a worktop into a property in Motspur Park?

The level crossing by the station holds traffic and can add a long wait to a timed delivery, so the run is planned around it. Otherwise access is straightforward with driveways and wide side returns. The van gets close to the door and the stone comes off the tail lift onto a trolley, which is about the shortest carry we ever get. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. Joint positions follow from that.

Is Motspur Park really a worktop splashbacks & upstands area?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop installation, worktop design & quotation and worktop templating. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Sockets final before template. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Same batch, same run, same day.

What moves the number on a quote around here?

Seating overhangs past roughly 300mm will not carry on the carcass alone, so flat steel bar or a plywood substrate has to be built into the units first. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Corners get their own pieces. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What needs to be ready before you come to Motspur Park?

A junction between an original floor and a later extension slab is almost never at the same level, so units carrying a run across it need packing first. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. An upstand rides what a panel exposes. The old tiling must be off and the wall made good and dry before templating, not on fitting day. An owner living in the house makes the decisions and lives with them, so the specification tends to go towards the material rather than towards the lowest total. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Decided before fabrication, not after.

Next step

Splashbacks and upstands in Motspur Park, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489