Skip to content

Merton · SW20

Splashbacks and upstands in Cannon Hill

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

Cannon Hill kitchens

What the kitchens here are actually like

1930s semi1960s low-rise flatPostwar detached

Units are often only 500mm deep, so a standard 600mm stone top overhangs at the front and the doors need checking against it. Socket positions, sill heights and wall flatness are the three things that settle this, and all three are properties of the building. Same slab run, same day, same batch.

The 1960s low-rise blocks have compact fitted kitchens where a single 2.4m run and a return is the whole job.

Houses backing onto the common have kitchens reorientated to face the green, often with a peninsula under a rear window rather than a full extension. Roads bordering the common are quiet but have limited turning space and grass verges that a loaded van will sink into after rain.

The window sits in the middle of the run over the sink, and its board and cill set the limit on how tall an upstand can be. That step is exactly what an upstand covers and what a full-height panel exposes, so unless the wall is skimmed level end to end, a 100mm band is the reliable choice. Cut from the same slab run as the tops.

On these streets the housing is 1930s semi, 1960s low-rise flat and Postwar detached. That mix is why two jobs on the same road can run completely differently.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered on our south west London run. Fitted 3–7 working days from template.

1930s and inter-war semis

Getting stone into the room

Flats in the low-rise blocks are reached by external stairs with an open landing, which makes wind a genuine handling issue with a slab on edge.

1930s and inter-war semis

What gets asked for here

Second or third on the list around here, after worktop replacement. Same visit, same bench, same crew, same lead time.

1930s and inter-war semis

The building, and what it does to the job

In the flats the window sill often sits lower than the worktop line, so a sill-height check has to happen before the sink run is cut.

Where a run finishes into a reveal, the depth of that reveal is taken at worktop height and nowhere else. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. An upstand rides what a panel exposes.

Access

Getting stone into a Cannon Hill kitchen

Roads bordering the common are quiet but have limited turning space and grass verges that a loaded van will sink into after rain. Flats in the low-rise blocks are reached by external stairs with an open landing, which makes wind a genuine handling issue with a slab on edge.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

south west London patch

Cannon Hill is covered on our south west London run, along with the rest of Merton.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in Cannon Hill

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you actually work in Cannon Hill, or just list it?

Yes. Cannon Hill is on the patch, and the postcodes we work here are SW20. It is worked on our south west London run, along with the rest of Merton. On a street with no restrictions the constraint is other residents rather than a warden, so it is worth putting a cone or a car out early. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. One trip is always better than three. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

What is different about worktop splashbacks & upstands in Cannon Hill?

The window sits in the middle of the run over the sink, and its board and cill set the limit on how tall an upstand can be. Patched plaster next to original render sits at different depths, and that step is exactly what an upstand covers. Cut from the same slab run as the tops. In the flats the window sill often sits lower than the worktop line, so a sill-height check has to happen before the sink run is cut.

Is access a problem in Cannon Hill?

Roads bordering the common are quiet but have limited turning space and grass verges that a loaded van will sink into after rain. Flats in the low-rise blocks are reached by external stairs with an open landing, which makes wind a genuine handling issue with a slab on edge. Weight tells on a staircase more than anywhere else, because there is nowhere to set a piece down mid-flight and no way to change your grip once it is moving. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. It decides panel size before anything is cut.

Is worktop splashbacks & upstands common in Cannon Hill?

It is one of the three we do most here, behind worktop replacement. Same template visit, same workshop, same installers either way. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Siliconed to the worktop, never grouted. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Sockets final before template.

What decides the price of a worktop in Cannon Hill?

The catch with a galley is that both runs are seen end-on from the doorway, so any difference in overhang between the two reads immediately. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Corners get their own pieces. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What do I need to sort out first?

Where a run finishes into a reveal, the depth of that reveal is taken at worktop height and nowhere else. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. An upstand rides what a panel exposes. Boiler position, flue and any pipework drops must be settled and the wall skimmed level before templating the splashback run. Owner-occupied kitchens are usually being done once, which is why the edge profile, the vein direction and where a join falls are worth the conversation. Full-height panels need the wall made good first, which is another trade and another timescale. Decided before fabrication, not after.

Next step

Splashbacks and upstands in Cannon Hill, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489