
Merton · SW20
Worktop replacement in Cannon Hill
Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.
- 5.0from 23 Google reviews
- 25-year material · 5-year workmanship
- Fitted 3-7 working days from template
Cannon Hill kitchens
What the kitchens here are actually like
Small, roughly square kitchens with a back door and a window in the middle of the run: short lengths, few joins, and a lot to work around. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. A single day, planned properly.
The 1960s low-rise blocks have compact fitted kitchens where a single 2.4m run and a return is the whole job.
Roads bordering the common are quiet but have limited turning space and grass verges that a loaded van will sink into after rain. Houses backing onto the common have kitchens reorientated to face the green, often with a peninsula under a rear window rather than a full extension.
The window sits in the middle of the run over the sink, and its board and cill set the limit on how tall an upstand can be. Post-war terraces have small, roughly square kitchens with a back door and a window in the middle of the run, so runs are short and joins are rare, but there are usually two corners and a window cill to work around in a couple of metres. Units kept, surface changed, one day.
The buildings themselves are mostly 1930s semi, 1960s low-rise flat and Postwar detached. Which of those you have decides most of what follows.
True everywhere
Worktop replacement, in short
- The units stay. Only the surface changes.
- Old tops come out in the morning, new stone is down and sealed the same day.
- A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
- The carcasses have to be sound: stone is far heavier than laminate.
Covered on our south west London run. Fitted 3–7 working days from template.
1930s and inter-war semis
What gets asked for here
The research on this patch puts this at the top of the list, above worktop splashbacks & upstands and worktop installation.
1930s and inter-war semis
The building, and what it does to the job
In the flats the window sill often sits lower than the worktop line, so a sill-height check has to happen before the sink run is cut.
1930s and inter-war semis
Getting stone into the room
Flats in the low-rise blocks are reached by external stairs with an open landing, which makes wind a genuine handling issue with a slab on edge.
Communal stairs get boarded and the handrail padded, and we walk the route with a tape before the first piece leaves the van. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. It sets what the day actually looks like.
Access
Getting stone into a Cannon Hill kitchen
Roads bordering the common are quiet but have limited turning space and grass verges that a loaded van will sink into after rain. Flats in the low-rise blocks are reached by external stairs with an open landing, which makes wind a genuine handling issue with a slab on edge.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
south west London patch
Cannon Hill is covered on our south west London run, along with the rest of Merton.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop replacement in Cannon Hill
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you actually work in Cannon Hill, or just list it?
Yes. Cannon Hill is on the patch, and the postcodes we work here are SW20. It is worked on our south west London run, along with the rest of Merton. On a street with no restrictions the constraint is other residents rather than a warden, so it is worth putting a cone or a car out early. We stage the strip-out so the old tops leave in one trip rather than trickling out across the afternoon. Old tops out and new stone in, both through the same gap. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
What is different about worktop replacement in Cannon Hill?
In the flats the window sill often sits lower than the worktop line, so a sill-height check has to happen before the sink run is cut.
Is access a problem in Cannon Hill?
Roads bordering the common are quiet but have limited turning space and grass verges that a loaded van will sink into after rain. Flats in the low-rise blocks are reached by external stairs with an open landing, which makes wind a genuine handling issue with a slab on edge. Communal stairs get boarded and the handrail padded, and we walk the route with a tape before the first piece leaves the van. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. It sets what the day actually looks like.
Is Cannon Hill mostly worktop replacement work for you?
Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop splashbacks & upstands and worktop installation. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. The carcasses have to be sound, because stone is several times the weight of what is coming off. A day, not a project. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. Old tops out in the morning, new stone down and sealed the same afternoon. A day, not a project.
What decides the price of a worktop in Cannon Hill?
The catch with a galley is that both runs are seen end-on from the doorway, so any difference in overhang between the two reads immediately. Old laminate has often been holding a run square for years, and taking it off shows what the units were really doing. The units stay, the surface changes. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What do I need to sort out first?
Sill height gets settled with the template on site, because it is one of the few dimensions nobody has measured before we arrive. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. The laminate has been covering it up. Empty the base units completely and have a plumber disconnect the sink, tap and any washing machine plumbed in under the worktop before we arrive. An owner living in the house makes the decisions and lives with them, so the specification tends to go towards the material rather than towards the lowest total. If the carcasses are tired the honest answer is that stone will find that out, and it is better said before than after. Plumber either side of us.
Related
More around Cannon Hill
Other work we do in Cannon Hill
Next step
Worktop replacement in Cannon Hill, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.