
Merton · SW20 SW19
Worktop replacement in Wimbledon Chase
Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.
- 5.0from 23 Google reviews
- 25-year material · 5-year workmanship
- Fitted 3-7 working days from template
Wimbledon Chase kitchens
What the kitchens here are actually like
Two runs and a return into a rear extension is the pattern, and the return is the piece that never nests neatly on a slab. Old top out in the morning, new stone down and sealed the same afternoon, with a plumber either side of us. Sound carcasses are the one condition.
A good proportion of bungalows here mean single-level kitchens where the whole room can be worked at once, wide U-shapes with a run on three walls and no upstairs to negotiate.
The semis follow the standard rear kitchen plan with the pantry recess absorbed into a taller unit run. Bungalow ceilings are low, which means tall wall units come down close to the top, check hob clearance and upstand height before cutting the splashback panel.
Bungalow kitchens are frequently extended into the rear or opened into the roof space, so the room is part original and part new build. The kitchen is normally the original back room with a later side-return or rear extension bolted on, and that helps us: most pieces can go down the side alley and in through the back door in one length, so we can avoid joins that a front-door route would force. Units kept, surface changed, one day.
What turns up on the job sheets is 1930s semi, Interwar bungalow and 1950s detached. The differences between them show up at template, not at enquiry.
True everywhere
Worktop replacement, in short
- The units stay. Only the surface changes.
- Old tops come out in the morning, new stone is down and sealed the same day.
- A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
- The carcasses have to be sound: stone is far heavier than laminate.
Covered on our south west London run. Fitted 3–7 working days from template.
1930s and inter-war semis
What gets asked for here
Second or third on the list around here, after worktop installation. Same visit, same bench, same crew, same lead time.
1930s and inter-war semis
Getting stone into the room
Driveways and dropped kerbs are common so the van gets close to the door, and single-storey properties mean the carry is level from van to room. The constraint is usually a low porch canopy or a narrow front door reveal rather than stairs.
Gravel and block paving both look like hard standing and neither takes a loaded trolley, so the run from tail lift to door gets boarded. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. Old tops out and new stone in, both through the same gap.
Access
Getting stone into a Wimbledon Chase kitchen
Driveways and dropped kerbs are common so the van gets close to the door, and single-storey properties mean the carry is level from van to room. The constraint is usually a low porch canopy or a narrow front door reveal rather than stairs.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
south west London patch
Wimbledon Chase is covered on our south west London run, along with the rest of Merton.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop replacement in Wimbledon Chase
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Is Wimbledon Chase on your patch?
Yes. Wimbledon Chase is on the patch, and the postcodes we work here are SW20, SW19. It is worked on our south west London run, along with the rest of Merton. A front drive is the best thing that can happen to a fitting day, because the tail lift comes down within a few metres of the door and nothing is on a clock. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. Old tops out and new stone in, both through the same gap. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
Why would worktop replacement in Wimbledon Chase be any different from anywhere else?
Wide doorways and level thresholds mean full-length pieces go in whole and the join count comes down to slab length alone. The junction between the old floor and the extension floor is where a run crossing it needs packing before stone goes on. Units kept, surface changed, one day. Bungalow ceilings are low, which means tall wall units come down close to the top, check hob clearance and upstand height before cutting the splashback panel.
How would you get a worktop into a property in Wimbledon Chase?
Driveways and dropped kerbs are common so the van gets close to the door, and single-storey properties mean the carry is level from van to room. The constraint is usually a low porch canopy or a narrow front door reveal rather than stairs. Everything comes through the front door and down the hall, so the tightest point on the route is usually the newel post at the foot of the stairs. We plan the strip-out and the carry as one movement so the kitchen is only out of use for a single day. The strip-out is planned around it.
Is worktop replacement common in Wimbledon Chase?
It is one of the three we do most here, behind worktop installation. Same template visit, same workshop, same installers either way. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. A day, not a project. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. The carcasses have to be sound, because stone is several times the weight of what is coming off. A day, not a project.
What moves the number on a quote around here?
A U shape uses more linear metres than people expect, and the two returns rarely nest together, so a second slab is a genuine possibility. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. Carcasses have to be sound first. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What needs to be ready before you come to Wimbledon Chase?
The returns into a breast recess are the tightest scribes in the room, and they are eased in rather than forced. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. Found at template, not on fit day. Unlock the side gate and clear the alley of bins, bikes and pots, and arrange a plumber for the sink and an electrician if the hob is hard-wired. An owner living in the house makes the decisions and lives with them, so the specification tends to go towards the material rather than towards the lowest total. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Units kept, surface changed.
Related
More around Wimbledon Chase
Other work we do in Wimbledon Chase
Next step
Worktop replacement in Wimbledon Chase, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.