
Merton · SW20 SW19
Worktop templating in Wimbledon Chase
A digital template plotting the room as it really is, taken once your units are fitted, fixed and level.
- 5.0from 23 Google reviews
- 25-year material · 5-year workmanship
- Fitted 3-7 working days from template
Wimbledon Chase kitchens
What the kitchens here are actually like
A side passage and a back door mean the stone rarely has to come through the house, which changes the job more than most people expect. Two to three hours on site, once the units are fitted, fixed and level. Units fitted, fixed and level first.
A good proportion of bungalows here mean single-level kitchens where the whole room can be worked at once, wide U-shapes with a run on three walls and no upstairs to negotiate.
The semis follow the standard rear kitchen plan with the pantry recess absorbed into a taller unit run. Bungalow ceilings are low, which means tall wall units come down close to the top, check hob clearance and upstand height before cutting the splashback panel.
Where the roof has been converted there is usually a steel over the kitchen that went in after the walls, and the run beneath it is worth checking for square. The typical 1930s kitchen sits at the back with a low window over the sink run, so the template records the exact sill height above the units to settle whether an upstand fits or the stone has to die into a window board. No stone is ever cut from a plan.
On these streets the housing is 1930s semi, Interwar bungalow and 1950s detached. Each of those behaves differently once the old top comes off.
True everywhere
Worktop templating, in short
- Two to three hours on site for a typical kitchen.
- Units must be fitted, fixed and level first. No stone is ever cut from a plan.
- Sink, tap and hob must be physically on site, not just ordered.
- A Belfast or butler sink must be installed and at its final height.
Covered on our south west London run. Fitted 3–7 working days from template.
1930s and inter-war semis
What gets asked for here
The research on this patch does not put this among the three commonest jobs. Worktop installation, worktop splashbacks & upstands and worktop replacement do. That changes how often we are here, not how the work is done.
1930s and inter-war semis
Getting stone into the room
Driveways and dropped kerbs are common so the van gets close to the door, and single-storey properties mean the carry is level from van to room. The constraint is usually a low porch canopy or a narrow front door reveal rather than stairs.
Carrying through the house means protecting the whole route first: floor boarded, banister padded, and the front door held open on a wedge rather than by hand. Door widths, turn diagonals and any change of level are recorded on the drawing alongside the run dimensions. It goes on the drawing with the run dimensions.
Access
Getting stone into a Wimbledon Chase kitchen
Driveways and dropped kerbs are common so the van gets close to the door, and single-storey properties mean the carry is level from van to room. The constraint is usually a low porch canopy or a narrow front door reveal rather than stairs.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
south west London patch
Wimbledon Chase is covered on our south west London run, along with the rest of Merton.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop templating in Wimbledon Chase
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Is Wimbledon Chase on your patch?
Yes. Wimbledon Chase is on the patch, and the postcodes we work here are SW20, SW19. It is worked on our south west London run, along with the rest of Merton. Off-street parking means the van stays put all day, so tools, packers and the offcut we would rather have than not are all within reach. It is noted on the job sheet at template so the fitting crew inherit the answer rather than rediscovering it. It goes on the job sheet for the fitting crew. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
Why would worktop templating in Wimbledon Chase be any different from anywhere else?
Where the roof has been converted there is usually a steel over the kitchen that went in after the walls, and the run beneath it is worth checking for square. The typical 1930s kitchen sits at the back with a low window over the sink run, so the template records the exact sill height above the units to settle whether an upstand fits or the stone has to die into a window board. No stone is ever cut from a plan. Bungalow ceilings are low, which means tall wall units come down close to the top, check hob clearance and upstand height before cutting the splashback panel.
How would you get a worktop into a property in Wimbledon Chase?
Driveways and dropped kerbs are common so the van gets close to the door, and single-storey properties mean the carry is level from van to room. The constraint is usually a low porch canopy or a narrow front door reveal rather than stairs. A narrow entrance hall with a turn into the back of the house caps the longest piece we can physically get in, whatever the run itself measures. The templater measures that route on the same visit, so the drawing leaves site already knowing the maximum piece. The template records it along with everything else.
Is Wimbledon Chase really a worktop templating area?
Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop installation, worktop splashbacks & upstands and worktop replacement. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. No stone is ever cut from a plan, which is inconvenient exactly when a programme is tight. The room as it is, not as it was drawn. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. Two to three hours on site, with the sink, tap and hob physically present. Units fitted, fixed and level first.
What moves the number on a quote around here?
Three runs means two internal corners, and each corner is a decision about mitre or butt joint before anything is nested. A layout templated off one wall instead of one datum will not sit right once all the pieces are down together. The drawing leaves site complete. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What needs to be ready before you come to Wimbledon Chase?
Where a breast interrupts a long wall the join can often go there, so it reads as a natural break rather than a line in the middle of a worktop. The template plots it as it is, at the exact height the worktop will sit, and the drawing carries that through. Plotted, not estimated. All base units in, including anything standing on the later extension slab, walls skimmed to final thickness, and the sink, tap and hob delivered so cut-outs and tap centres are set from the actual items. The householder is normally on site at template, and that is the right time to settle sink position, tap centres and overhang rather than agree them by email. A template booked hopefully around another trade is the commonest cause of a wasted visit. No stone is cut from a plan.
Related
More around Wimbledon Chase
Other work we do in Wimbledon Chase
Next step
Worktop templating in Wimbledon Chase, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.