Merton · SW20 SW19
Splashbacks and upstands in Wimbledon Chase
Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.
Wimbledon Chase kitchens
What the kitchens here are actually like
A side passage and a back door mean the stone rarely has to come through the house, which changes the job more than most people expect. Socket positions, sill heights and wall flatness are the three things that settle this, and all three are properties of the building. Same slab run, same day, same batch.
A good proportion of bungalows here mean single-level kitchens where the whole room can be worked at once — wide U-shapes with a run on three walls and no upstairs to negotiate.
Bungalow ceilings are low, which means tall wall units come down close to the top — check hob clearance and upstand height before cutting the splashback panel. The semis follow the standard rear kitchen plan with the pantry recess absorbed into a taller unit run.
Bungalow kitchens are frequently extended into the rear or opened into the roof space, so the room is part original and part new build. That leaves a ragged band right where the upstand has to sit, which is fine for a 100mm upstand that covers it, but a full-height splashback needs the wall made good first or it will rock on the high spots. Cut from the same slab run as the tops.
The buildings themselves are mostly 1930s semi, Interwar bungalow and 1950s detached. Which of those you have decides most of what follows.
True everywhere
Splashbacks and upstands, in short
- Cut from the same slab run as the worktop, at the same time.
- Ordered later, from a different batch, the match is not reliable where the pieces meet.
- Socket and switch positions must be final before templating.
- The joint to the worktop is siliconed, never grouted.
Covered from the New Malden patch. Fitted 3–7 working days from template.
1930s and inter-war semis
Getting stone into the room
Driveways and dropped kerbs are common so the van gets close to the door, and single-storey properties mean the carry is level from van to room. The constraint is usually a low porch canopy or a narrow front door reveal rather than stairs.
Everything comes through the front door and down the hall, so the tightest point on the route is usually the newel post at the foot of the stairs. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. It decides panel size before anything is cut.
1930s and inter-war semis
What gets asked for here
Second or third on the list around here, after worktop installation. Same visit, same bench, same crew, same lead time.
Access
Getting stone into a Wimbledon Chase kitchen
Driveways and dropped kerbs are common so the van gets close to the door, and single-storey properties mean the carry is level from van to room. The constraint is usually a low porch canopy or a narrow front door reveal rather than stairs.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
New Malden patch
Wimbledon Chase is worked from our New Malden run, covering South West London & Surrey.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop splashbacks & upstands in Wimbledon Chase
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Is Wimbledon Chase on your patch?
Yes. Wimbledon Chase is on the patch, and the postcodes we work here are SW20, SW19. It is run from the New Malden side, covering South West London & Surrey. A front drive is the best thing that can happen to a fitting day, because the tail lift comes down within a few metres of the door and nothing is on a clock. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Handling is where these pieces get damaged. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
Why would worktop splashbacks & upstands in Wimbledon Chase be any different from anywhere else?
Wide doorways and level thresholds mean full-length pieces go in whole and the join count comes down to slab length alone. These kitchens are nearly always retiled at least twice, and stripping the old tiles takes the bottom course of plaster with it because the original laminate top ran underneath the tiles rather than up to them. Decided before fabrication starts. Bungalow ceilings are low, which means tall wall units come down close to the top — check hob clearance and upstand height before cutting the splashback panel.
How would you get a worktop into a property in Wimbledon Chase?
Driveways and dropped kerbs are common so the van gets close to the door, and single-storey properties mean the carry is level from van to room. The constraint is usually a low porch canopy or a narrow front door reveal rather than stairs. Door width, hall width and the diagonal at the turn are three separate measurements, and it is the diagonal that catches people out. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. It decides panel size before anything is cut. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.
Do you do much worktop splashbacks & upstands around Wimbledon Chase?
It is one of the three we do most here, behind worktop installation. Same template visit, same workshop, same installers either way. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Same batch, same run, same day. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Siliconed to the worktop, never grouted.
What moves the number on a quote around here?
With three walls in play the chance of one of them being out of square is high, and the template has to carry all three angles. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Corners get their own pieces. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What needs to be ready before you come to Wimbledon Chase?
Alcove pieces get cut oversize on both scribe edges, with the true wall angles carried on the template drawing rather than assumed. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. Scribed, dubbed out, or set proud. Pick one. The old tiling must be off and the wall made good and dry before templating, not on fitting day. Where someone is living in the house through the work, the strip-out and the fit are planned so the kitchen is out of use for a day and not a week. Splashbacks are cut from the same slab run as the tops, so they have to be decided before fabrication, not after. Decided before fabrication, not after.
Related
More around Wimbledon Chase
Other work we do in Wimbledon Chase
Next step
Splashbacks and upstands in Wimbledon Chase, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.