Merton · SW19

Splashbacks and upstands in South Wimbledon

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

The same kitchen from the doorway, Arctic Starburst turning both corners past the induction hob to the tall units

South Wimbledon kitchens

The kitchens we meet in South Wimbledon

People often assume splashback and upstand work in South Wimbledon is a straight swap, and sometimes it is, though the kitchen usually has an opinion about that. Small two-storey terraces where the kitchen stays in the original rear outrigger, a single 2.4m to 3m run with the boiler still on the wall and no room for an island. Landlord refits and first-time-buyer updates dominate, so it is usually swapping a tired laminate top for a slab and adding upstands rather than moving anything. None of that has to be decided before you get a price. It is what the survey is for.

The rear wall of the addition carries both the back door and the window, which leaves very little unbroken wall for a run to sit against. Cutting sockets and switch plates into stone is a workshop operation, so the electrics have to be final before the template. A bowed wall gets measured at three heights first.

There is no back addition on these, so the kitchen is the original rear room and the run is one wall long with a door at each end of it. A 100mm upstand bedded on silicone is the honest answer where the plaster bows, because it rides what a tall panel exposes. The wall gets made good first or the gap shows.

What we are usually templating in is Victorian bylaw terrace, Edwardian terrace, Postwar council block and Above-shop flat. They were built to different tolerances, and the stone has to absorb that.

Worktop join finished flush against a wall
  • Victorian bylaw terrace
  • Edwardian terrace
  • Postwar council block
  • Above-shop flat

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.
Borough
Merton
Postcodes
SW19
Covered on
our south west London run
Fitted
5–10 working days from template

The place

Why South Wimbledon is its own job

We measure and fit in South Wimbledon often enough to know what to ask about before anyone agrees a date. Front doors open more or less straight onto the pavement with no front garden to stage on, and Merton High Street plus the tram line limit where a van can sit. Hallways are around 900mm wide with a dogleg at the stairs, so the slab is turned on edge before the first corner. Old walls out here bow badly over a 3m run, so scribe generously and expect to take 10 to 15mm off the back edge rather than trusting the plaster line. Access, levels and out-of-square walls all land on the same quote as the stone, itemised line by line.

The work

What worktop splashbacks & upstands involves

The pieces are made to the wall they will stand against, so they are not stock items and cannot be ordered from a size. Each one is drawn for its own stretch of wall. These are templated after the worktop is fitted and settled, never before, so they scribe to the wall the worktop actually meets. Socket and switch positions need to be final first. You end up with a wall that gets wiped down in the same pass as the worktop, because it is the same material carrying on upward rather than a different one starting.

Upstands and splashbacks are drawn, priced and made as their own piece of work, not thrown in as an offcut at the end of a worktop order. Where a run is longer than one sheet will give, the split is put on a vertical that lines up with a cabinet gable or the end of the hob. A rear extension often puts the sink under a window whose sill is barely clear of the surface, and that settles the height before anyone gets a say. Stone behind the hob, not grout.

Corners and joins See the options

The money

What it costs in South Wimbledon

Upstands and splashbacks are priced by the metre of finished edge and the number of cut-outs, not by the area of wall they cover. Two facing runs mean two sets of edges and two scribes in a small span, which is why a compact galley rarely prices as cheaply as its area suggests. Multiplying your worktop area by something between £110 and £550 gives you a material bill rather than a job cost, and the two are far enough apart to be worth keeping separate. Height is a decision with a figure against it.

Victorian and Edwardian terraces

South Wimbledon in the housing figures

On the South Wimbledon streets we cover, the twenties and thirties barely register, so the standard semi galley is not the shape we are fitting. The same wall build-up comes up again and again, so what works on one holds for the next. Templated once the top has settled in place.

Victorian and Edwardian terraces

What South Wimbledon asks for

Around here this shares the list with worktop replacement and worktop installation. Worktop replacement edges it, but the difference is how often we are on the street rather than anything about the work.

Victorian and Edwardian terraces

The building, and what it does to the job

Where two pieces meet over a fall in the floor the join has to be flush to the hand as well as true to the level, because the eye reads the join and forgives the room. A mitred external return around it has to come from the same position in the slab, or the pattern visibly steps at the corner. The reveal decides where the stone dies.

Access

Getting stone into a South Wimbledon kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South west London patch

South Wimbledon is covered on our south west London run, along with the rest of Merton.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in South Wimbledon

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Is South Wimbledon far enough out to be a problem for you?

Yes. South Wimbledon is on the patch, and the postcodes we work here are SW19. It is worked on our south west London run, along with the rest of Merton. Unrestricted kerbside is straightforward as long as the space in front of the property is actually clear when the van arrives. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. A long carry turns a light piece into an awkward one. You never have to visit anything or collect anything: we template in your kitchen and fit in your kitchen.

02

What is different about worktop splashbacks & upstands in South Wimbledon?

That rear wall carries the back door and the only window, which leaves very little uninterrupted length for a sink run. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here, it rides the bow and hides the junction the worktop can never close on its own. Solid plaster on brick takes a panel; a hollow wall wants thought. Floors settle, and once base units are packed and levelled properly the stone sits true while everything else in the room admits it is not. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. A bowed wall shows on a panel and hides under an upstand.

03

Is access a problem in South Wimbledon?

A step up off the pavement means the piece is lifted to the threshold before it is carried anywhere, and that first lift is the one that wants four hands. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. The break goes where a joint reads as deliberate. On a street with no restrictions the constraint is other residents rather than a warden, so it is worth putting a cone or a car out early. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. Panels come across in one pass with the route already cleared.

04

Do you do much worktop splashbacks & upstands around South Wimbledon?

It is inside the three we do most here, under worktop replacement. Either way: same template, same workshop, same fitters. Damage in a let flat is settled as a deposit deduction, so a surface that can be repaired in place is worth more than one that has to be replaced whole. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. The annexe gets the same panel as the main run. The person choosing the worktop is not the person using it, and that shifts the balance from appearance towards running cost. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. A repeated spec needs a repeatable splashback.

05

What makes one South Wimbledon kitchen dearer than the next?

The walkway between the two runs is fixed by the units either side, so any overhang added to one worktop comes straight off the space somebody has to stand in. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. A peninsula end takes a panel on both faces. Material alone is £110 to £550 per square metre, and templating, fabrication and fitting are never folded into that figure.

06

What holds a template up more often than anything else?

A junction between an original floor and a later extension slab is almost never at the same level, so units carrying a run across it need packing first. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Mitred returns come from one place in the slab. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. Where ownership is split across a building, the common parts belong to someone else and the carry route is negotiated rather than assumed. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. An owner can wait for it; a void period cannot.

07

What happens to the worktop that comes off?

Old laminate is light and awkward rather than heavy, so it is usually the easier half of the day. The sink and hob are lifted out with the old top and kept aside if you are reusing them. The units stay where they are and only the surface changes. A free-parking street with cars both sides can still leave the van forty metres away, and that distance is carry, not driving. Full-height panels are the awkward thing to move, light enough to lift and long enough to flex on the way. A short bay slot is when the tall pieces get damaged.

08

What if a piece cracks while it is being carried in?

Door frames and the stair route are protected too, since most contact happens on the way in. Floors and units are protected before anything comes through the door. Stone cannot be filled and made good the way laminate can, so a damaged piece is remade rather than patched. A Victorian hall arch sits lower than the ceiling either side of it, and it is the point a piece carried on edge meets first. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. A panel that would need turning indoors is turned outside instead.

09

What happens if a piece will not go up the stairs?

Splitting a run costs a join, and that is the price of getting stone into the room at all. A piece travels on edge, never flat, because on edge is how stone of that length carries its own weight. A meter cupboard set into the hall wall narrows the run at exactly the height a carried piece travels. Panels travel on edge in a frame, and the frame needs the same clearance the finished piece does. What can be got into the room decides the height above the worktop.

10

Can I have grooves instead of a separate drainer in South Wimbledon?

The bowl position has to be settled before templating, since the grooves are set out from it. Grooves are machined into the surface rather than applied to it, so there is nothing to come loose later. Machining is permanent. If a later kitchen moves the sink, the grooves stay where they were cut. Lower ground floor kitchens are reached by a stair with a winder in it, and the head height over that winder is lower than the room at either end. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Full height needs a flat wall and a finished electrician.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Karim is excellent, he did superb job with Templeting and fitting my kitchen, highly recommend”
M SgGoogle review
★★★★★
“I am really happy with the work! He fitted my kitchen granite worktop really nicely and got the job done on time, just as promised. He was friendly, professional, and made sure everything was done the way I wanted. Would definitely recommend Karam to anyone looking for a great job!”
esther boaduGoogle review · granite
★★★★★
“Nice work from worktop worx. Highly recommended”
Rasika KumarageGoogle review

Next step

Splashbacks and upstands in South Wimbledon, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.