Skip to content

Merton · SW19 CR4

Splashbacks and upstands in Colliers Wood

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

Colliers Wood kitchens

What the kitchens here are actually like

Victorian terrace1930s semi2010s riverside apartmentPostwar tower block

The lift car, the loading bay and the building manager decide the piece sizes here, not the slab. Socket positions, sill heights and wall flatness are the three things that settle this, and all three are properties of the building. Same slab run, same day, same batch.

Two distinct jobs sit side by side here. The riverside apartments off the Wandle came with developer-spec kitchens where owners swap the composite or laminate top for quartz and keep the layout, while the terraces behind the High Street get a modest rear extension with a single wall run and a small breakfast peninsula.

Developer kitchens here are built to a tight 600mm module with the sink already cut into a fixed position, so measure the existing cutouts before quoting a straight swap. The older terraces sit on streets that back onto the river and industrial units, so vans get boxed in by delivery traffic on the A24.

Piece size is set by the lift car and the entrance dogleg, which routinely turns a two-piece kitchen into a three-piece one. The plasterboard is flat enough for a full-height panel; it is the socket positions that cause the trouble. Decided before fabrication starts.

What we are usually templating in is Victorian terrace, 1930s semi, 2010s riverside apartment and Postwar tower block. Each of those behaves differently once the old top comes off.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered from the New Malden patch. Fitted 3–7 working days from template.

Victorian and Edwardian terraces

What gets asked for here

An owner living in the house makes the decisions and lives with them, so the specification tends to go towards the material rather than towards the lowest total. Splashbacks are cut from the same slab run as the tops, so they have to be decided before fabrication, not after. Same slab run as the tops.

Second or third on the list around here, after worktop replacement. Same visit, same bench, same crew, same lead time.

Victorian and Edwardian terraces

Getting stone into the room

The new blocks have loading bays and a goods lift but both need booking with the concierge and there is a hard time limit on the bay.

Access

Getting stone into a Colliers Wood kitchen

The new blocks have loading bays and a goods lift but both need booking with the concierge and there is a hard time limit on the bay. The older terraces sit on streets that back onto the river and industrial units, so vans get boxed in by delivery traffic on the A24.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

New Malden patch

Colliers Wood is worked from our New Malden run, covering South West London & Surrey.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in Colliers Wood

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you cover Colliers Wood?

Yes. Colliers Wood is on the patch, and the postcodes we work here are SW19, CR4. It is run from the New Malden side, covering South West London & Surrey. Bay bookings are usually an hour or two, which is fine for unloading and no use at all as a place to leave the van for a day. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. One trip is always better than three. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Does the housing in Colliers Wood change how worktop splashbacks & upstands works?

Piece size is set by the lift car and the entrance dogleg, which routinely turns a two-piece kitchen into a three-piece one. The plasterboard is flat enough for a full-height panel; it is the socket positions that cause the trouble. The wall makes that decision, not the brochure. Developer kitchens here are built to a tight 600mm module with the sink already cut into a fixed position, so measure the existing cutouts before quoting a straight swap.

How does the stone actually reach a kitchen in Colliers Wood?

The new blocks have loading bays and a goods lift but both need booking with the concierge and there is a hard time limit on the bay. The older terraces sit on streets that back onto the river and industrial units, so vans get boxed in by delivery traffic on the A24. The lift has to be booked and blanketed before anything moves, and that booking needs to cover the old tops coming out as well as the new stone going in. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. Joint positions follow from that. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.

Is worktop splashbacks & upstands common in Colliers Wood?

It is one of the three we do most here, behind worktop replacement. Same template visit, same workshop, same installers either way. Developer-fitted kitchens come with thin cam-lock carcasses, which are fine under laminate and want bracing before stone goes on them. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Same batch, same run, same day. Handover-spec kitchens are square, plumb and predictable, which means the join count is honest and driven by run length rather than by the building. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Sockets final before template.

Why do two Colliers Wood kitchens the same size price differently?

A galley puts the sink on one side and the hob on the other, which spreads the cut-outs across two pieces instead of weakening one. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Corners get their own pieces. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What has to be finished before you can template?

A notch around a boxed stack is machined with a radius at the internal corner, because a square inside corner there is exactly where a top will crack. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Make the wall good first, or accept the detail. Any socket you intend to move must be moved and re-plastered before templating, because a cut-out in the wrong place means a new piece of stone. An owner living in the house makes the decisions and lives with them, so the specification tends to go towards the material rather than towards the lowest total. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Decided before fabrication, not after.

Next step

Splashbacks and upstands in Colliers Wood, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7479 194398