Wandsworth · SW17

Splashbacks and upstands in Tooting

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

Tooting kitchens

The kitchens we meet in Tooting

Splashback and upstand work in Tooting tends to go wrong in the planning rather than in the fitting, and planning it properly means starting from the building. Small early cottage-estate houses have compact rear kitchens where a straight 2.7m run and a return is the whole layout, while the larger Victorian terraces off the main roads take a rear infill with a peninsula. Multi-generation households often ask for a second hob run or a separate prep area. Nothing above needs settling before you get in touch. It gets settled with a tape measure, in your kitchen, in Tooting.

Kitchens in this stock are compact and reasonably square, which makes the fixed lines a larger share of the total than the material is. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Behind the hob is where full height earns its cost.

Meters were moved out to a box on the flank wall on a later programme, and the cupboard they came out of is usually still standing in the corner. Dense concrete takes adhesive better than fixings, which actually suits a large bonded panel. Old walls lean back, and a tall panel shows it.

The buildings themselves are mostly Victorian terrace, Edwardian cottage estate house, Above-shop flat and Postwar block. The run length that is easy in one is a join in another.

Mitred waterfall edge detail on a quartz island
  • Victorian terrace
  • Edwardian cottage estate house
  • Above-shop flat
  • Postwar block

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Edges are polished on every side that shows, including the top edge of an upstand.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
Borough
Wandsworth
Postcodes
SW17
Covered on
our south west London run
Fitted
5–10 working days from template

The place

Why Tooting is its own job

The reason we ask so much before quoting in Tooting is that a worktop cannot be trimmed to fit a surprise. Tooting High Street and Mitcham Road are constantly congested with buses and market delivery traffic, and the side streets are permit-controlled. Cottage-estate houses have narrow front doors and a hall under 900mm with the stair immediately inside. Where a second cooking run is added the extraction and the tiling both change, so agree the splashback panel height with the hob run before cutting anything. None of this needs to be a drama. It needs somebody to measure it properly and write down what they found.

The work

What worktop splashbacks & upstands involves

What these pieces do is protect the wall where water and heat land: behind the tap, behind the hob, and along the back edge where a cloth never quite reaches. Because the tops are already in, the kitchen stays in use around this stage. It is a return visit rather than another day of the room being unavailable. You end up with sockets and switches sitting in openings machined for them, which is the difference between a panel made for the wall and one cut to clear whatever was on it.

Splashbacks and upstands are the part of the job that takes the grout line out of the kitchen, which is what most people are really asking for when they ask about stone behind the hob. Panels are offered up dry before any adhesive goes near them, and the scribe comes off the piece, never off the plaster. Electrics in these flats were often surface-run in conduit, and stone will not sit flat over trunking that stands proud of the plaster. Cut from the slab the worktop came out of.

Waterfall ends See the options

The money

What it costs in Tooting

Sockets and switches are cut-outs like any other, and their number does more to the price than the height of the panel does. A peninsula has a finished end and often an overhang, so it carries edge work a wall-side run never does. The stone itself is £110 to £550 per square metre supply only; everything done to it is priced separately and shown separately. Height is a decision with a figure against it.

Victorian and Edwardian terraces

Tooting in the housing figures

In the streets around Tooting, the inter-war years left little behind, so the familiar bay-and-return plan is rare on these jobs. Socket and switch positions have to be final before the panel is templated. The wall makes that call, not the brochure.

Victorian and Edwardian terraces

The shape of the run

The joint where a peninsula meets the main run wants a gable directly under it, and where the units do not offer one, steel goes in to carry that joint instead. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Tall panels are what push a job into a second slab.

Victorian and Edwardian terraces

What Tooting asks for

Not the top of the list on this patch, since worktop replacement takes that, but close enough behind it that we are here often. The method does not change.

Access

Getting stone into a Tooting kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South west London patch

Tooting is covered on our south west London run, along with the rest of Wandsworth.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Tooting

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Is Tooting on your patch?

Yes. Tooting is on the patch, and the postcodes we work here are SW17. It is worked on our south west London run, along with the rest of Wandsworth. Plenty of zones run at the weekend as well as through the week, so a Saturday date is not automatically the easier one to work. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Two hands and a clear route, or it waits on the van. Template and fit both happen at the property, so there is nothing to drive to and nothing to collect.

02

What do the kitchens in Tooting do to worktop splashbacks & upstands?

The ground floor is a solid slab with a bitumen membrane and no void under it, so services either run on the surface or get chased into something hard. The rear kitchen wall in ex-council flats and maisonettes is commonly dense in-situ concrete or blockwork with a thin skim, which means mechanical fixings are hard work and the splashback is held on adhesive rather than screwed. Sockets in a stud wall move more easily than sockets in brick. Level has to hold across the whole room rather than along one wall, or a floor that falls end to end shows as a step where two pieces meet. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. A window board below worktop height ends the upstand argument.

03

Do you have trouble getting long pieces into Tooting kitchens?

Pendant fittings over the stairwell and anything hung on the half-landing come down first, because a piece on edge sweeps a wider arc than the people carrying it. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. A panel that would need turning indoors is turned outside instead. A permit covering the street is permission to park rather than a space reserved on it, and on a full street the difference is the whole morning. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. The longer the walk, the fewer the panels per trip.

04

Do you do much worktop splashbacks & upstands around Tooting?

Yes, one of the three we see most, with worktop replacement ahead of it. Same visit to template, same workshop, same installers on the day. A second kitchen or a kitchenette in an annexe is a small job with the same fixed template, fabrication and fitting lines as a large one. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Ordered together, or the match is luck. Where an annexe has been built or converted, its floor and its walls are newer than the main house and behave differently under the same run. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Sockets final before template.

05

What decides the price of a worktop in Tooting?

A breakfast bar on the outer side is an overhang like any other, and the support under it is sized for people leaning on the end rather than for the weight of the stone alone. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Height is agreed before the cut list closes. Reckon on £110 to £550 per square metre for the material supply only, with templating, fabrication and fitting itemised separately.

06

What do I need to sort out first?

A floor that falls across the depth of a run rather than along it tips the carcasses front to back, and packing the front feet changes the overhang while it fixes the level. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. Full height wants a flat wall behind it. Any surface trunking or conduit has to be rerouted or accepted and boxed before templating, because the stone cannot be scribed around a live conduit on site. Some doors in a building need a consent letter and some need nothing at all, so the first question is which arrangement applies here rather than which one is usual. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. The wall has to be ready.

07

Can you get a full-length top into an upstairs kitchen in Tooting?

A piece travels on edge, never flat, because on edge is how stone of that length carries its own weight. Splitting a run costs a join, and that is the price of getting stone into the room at all. A join forced by the route still sits over a gable, so it is no poorer a join for that. A communal flight is out of use while a piece is on it, so the carry is timed so nobody is trying to pass on a half-landing. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. What can be got into the room decides the height above the worktop.

08

Do the template and the fit happen on the same visit?

Nothing is payable in advance of the template. On the fitting day floors and door frames are protected, joins clamped flush, sink and hob sealed. The design and quotation visit comes first. It is free and carries no obligation. There is nearly always a boxed soil stack or a service riser in a corner of the run, and it is rarely mentioned at enquiry. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. Panel joints land over a unit line, never mid-span.

09

What happens if my units are not level?

Packing takes up small variation. It is not there to hide something that belongs in the units. The check comes before the measuring rather than after, because the whole drawing is set out from that plane. Stone does not flex, so a run that rocks on its carcasses rocks just as badly once it is stone. Once the carcasses are levelled the gap under the plinth varies along the run, and that varying gap is the honest record of what the floor is doing. It decides whether the run gets one continuous piece or a set of separate lengths with a joint at every obstruction. Each obstruction is another joint, and it is priced as one.

10

What do drainer grooves add to the job?

Where there is no room for a separate drainer, grooves are usually what gets specified instead. On a porous stone the grooved area is sealed with the rest, and it gets wet more than anything else. The carry is the constraint: a single stair with tight half-landings, or deck access with a long walk from the lift. Socket positions, sill heights and wall flatness are the three things that settle this, and all three are properties of the building. Sockets move on paper more easily than in stone.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Really impressed with the quality and finish of these worktops. Great range of materials, precise fabrication, and smooth communication throughout. The whole process was easy and the final result looks fantastic. Highly recommend!”
Nastasia DragoGoogle review
★★★★★
“We installed new kitchen and got the worktop and splash back from them. Their professional work and commitment was wonderful. Quality of work compared to price was way too good. Thank you guys.”
MD Matinur RahmanGoogle review
★★★★★
“I am really happy with my worktop. It is beautiful and the service provided was second to none. I totally recommend.”
Magaly RGoogle review

Next step

Splashbacks and upstands in Tooting, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.