
Tower Hamlets · E3
Worktop design and quotation in Old Ford
Priced from your plans or the kitchen as it stands, with every cut-out, edge and join on its own line.
- 5.0from 23 Google reviews
- 25-year material · 5-year workmanship
- Fitted 3-7 working days from template
Old Ford kitchens
What the kitchens here are actually like
Nothing in a house of this age is square, and the kitchen is usually the part that has been altered most often. Two kitchens of the same floor area price very differently for exactly these reasons, and the quote should show you which one you have. Itemised, and nothing payable until we template.
Almost every renovated house here has a rear extension running to the boundary, which turns the old kitchen and scullery into one room with a 3m to 3.5m run under a flat rooflight and a separate island. Un-extended houses still have the kitchen at the very back with a door straight into the garden.
Several canal-facing properties have no vehicle frontage at all and the only route in is a towpath walk with a bridge ramp. Streets on the park side are broken up by modal filters and planters, so the van has to approach from the correct end or it will be reversing a long way back out.
The rear room is generous with a chimney breast in one corner, so the run gains a return and two scribed ends whatever the plan drew. The second thing is the carry route: front door, narrow hall, a turn at the stairs and often a step down into the extension, which can mean a piece that would template in one length has to be split to physically get into the room. That is what the itemised lines are for.
What we are usually templating in is Victorian terrace, interwar cottage estate and canal-side new-build. Each of those behaves differently once the old top comes off.
True everywhere
Worktop design and quotation, in short
- Material is £110–£550/m² supply. That is the slab only.
- Templating, fabrication and fitting are quoted as their own lines.
- No installed price per square metre is published, because it is not a real number.
- Nothing is payable until we template.
Covered on our east London run. Fitted 3–7 working days from template.
Victorian and Edwardian terraces
What gets asked for here
Second or third on the list around here, after worktop templating. Same visit, same bench, same crew, same lead time.
Victorian and Edwardian terraces
The building, and what it does to the job
Rear extensions here are usually finished before the kitchen goes in, so the template date slips with the plasterer and the levels across a 6m room need checking properly.
Window boards and cills stand proud of the plaster, so the back edge of the top has to be plotted to where the units actually sit rather than to the wall. This is the item most often left out of a cheaper quote, and it comes back as a variation once the templater has been. Better on the quote than in a variation.
Access
Getting stone into a Old Ford kitchen
Streets on the park side are broken up by modal filters and planters, so the van has to approach from the correct end or it will be reversing a long way back out. Several canal-facing properties have no vehicle frontage at all and the only route in is a towpath walk with a bridge ramp.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
east London patch
Old Ford is covered on our east London run, along with the rest of Tower Hamlets.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop design & quotation in Old Ford
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you cover Old Ford?
Yes. Old Ford is on the patch, and the postcodes we work here are E3. It is worked on our east London run, along with the rest of Tower Hamlets. On a street with no restrictions the constraint is other residents rather than a warden, so it is worth putting a cone or a car out early. Tell us at enquiry stage and it is priced properly, because a crew stood waiting is the most expensive thing on any job. Nothing here is added after the fact. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
Does the housing in Old Ford change how worktop design & quotation works?
The party wall is the straightest surface in the house and everything else has moved away from it over a century. The kitchen is usually a long galley in a rear extension or side return, so the run lengths are the first thing we check against slab length, anything beyond roughly three metres either needs a join or a second slab, and that decision alone moves the material figure more than a few extra square metres would. You see it before you commit to anything. Rear extensions here are usually finished before the kitchen goes in, so the template date slips with the plasterer and the levels across a 6m room need checking properly.
How does the stone actually reach a kitchen in Old Ford?
Streets on the park side are broken up by modal filters and planters, so the van has to approach from the correct end or it will be reversing a long way back out. Several canal-facing properties have no vehicle frontage at all and the only route in is a towpath walk with a bridge ramp. Carrying through the house means protecting the whole route first: floor boarded, banister padded, and the front door held open on a wedge rather than by hand. We price the carry from what you tell us about the route, so photographs of the approach are worth more to us than a floor plan. It appears as its own line rather than buried in a rate.
Is worktop design & quotation common in Old Ford?
It is one of the three we do most here, behind worktop templating. Same template visit, same workshop, same installers either way. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. That changes what the quote should be compared against, because the shape of the job is not the same as a single family kitchen. Nothing payable until we template. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. Comparing quotes only works when they itemise the same things, and this is where the differences usually hide. Material is the slab only, and it says so.
Why do two Old Ford kitchens the same size price differently?
On a heavily veined stone the island and the run behind it are nested off the same area of slab so the movement relates across the room. Each run is priced on its own line against the supply rate, with the join count and the reason for each join stated. Shape first, area second. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What has to be finished before you can template?
Where a run finishes into a reveal, the depth of that reveal is taken at worktop height and nowhere else. It is fabrication time rather than material, so it appears on the fabrication line and not in the square metre figure. Better on the quote than in a variation. Send us the run lengths, plus photos taken walking from the pavement through the hall to the kitchen so we can see the door widths and the stair turn. Mixed ownership means the decision-maker is not always the person who lets us in, so it is worth being clear early about who signs the quote off. The quote is written so it can be read by whoever is paying rather than only by whoever is standing in the kitchen. Nothing payable until template.
Related
More around Old Ford
Other work we do in Old Ford
Next step
Worktop design and quotation in Old Ford, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.