
Camden · NW1
Splashbacks and upstands in Regent's Park
Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.
- 5.0from 23 Google reviews
- 25-year material · 5-year workmanship
- Fitted 3-7 working days from template
Regent's Park kitchens
What the kitchens here are actually like
A hundred and forty years of alterations sit under the current kitchen, and the worktop is what has to sit flat on top of all of it. Socket positions, sill heights and wall flatness are the three things that settle this, and all three are properties of the building. Same slab run, same day, same batch.
In the Nash terraces you are working under listed consent against vaulted, uneven basement walls where nothing is square, so template on site and expect a scribe on every back edge. In the listed houses the room is deep, cool and awkwardly shaped, and the layout works around structural walls that cannot be touched. Two extremes within a few hundred metres: listed Nash terraces where the kitchen is in the basement or lower ground with vaulted ceilings and a service stair, and the neighbouring post-war estate with small standard galleys. The Outer Circle has strict waiting restrictions and no loading in front of the terraces, so access to the listed houses is by an area stair or a rear service entrance.
Walls are thick, lime-plastered and built in a soft brick, so they take a scribe well and take a fixing badly. A 100mm upstand bedded on silicone is the honest answer where the plaster bows, because it rides what a tall panel exposes. Cut from the same slab run as the tops.
What turns up on the job sheets is Nash stucco terrace, Regency villa, post-war estate and mansion block. That mix is why two jobs on the same road can run completely differently.
True everywhere
Splashbacks and upstands, in short
- Cut from the same slab run as the worktop, at the same time.
- Ordered later, from a different batch, the match is not reliable where the pieces meet.
- Socket and switch positions must be final before templating.
- The joint to the worktop is siliconed, never grouted.
Covered on our central and north London run. Fitted 3–7 working days from template.
Victorian and Edwardian terraces
Getting stone into the room
The post-war estate has its own internal roads and lifts, which is a completely different set of rules on the same day.
Victorian and Edwardian terraces
What gets asked for here
Honestly, this is not what we do most on this patch. Worktop templating, worktop design & quotation and worktop installation come up more often. That is a statement about the local housing rather than about the work, and nothing about how it is quoted, cut or fitted changes because of it.
Victorian and Edwardian terraces
The shape of the run
The catch with a galley is that both runs are seen end-on from the doorway, so any difference in overhang between the two reads immediately. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Joint placement is a decision, not an accident.
Access
Getting stone into a Regent's Park kitchen
The Outer Circle has strict waiting restrictions and no loading in front of the terraces, so access to the listed houses is by an area stair or a rear service entrance. The post-war estate has its own internal roads and lifts, which is a completely different set of rules on the same day.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
central and north London patch
Regent's Park is covered on our central and north London run, along with the rest of Camden.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop splashbacks & upstands in Regent's Park
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you cover Regent's Park?
Yes. Regent's Park is on the patch, and the postcodes we work here are NW1. It is worked on our central and north London run, along with the rest of Camden. Where the frontage is a clearway the unload happens away from the door and the carry gets longer, which is a crew and time question rather than a stone one. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. Handling is where these pieces get damaged. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
Does the housing in Regent's Park change how worktop splashbacks & upstands works?
Rooms are tall with deep window reveals, and a run finishing into a reveal is templated to it rather than assumed square. Where a client wants a full-height piece behind the hob, it usually sits in the old chimney recess, and that recess is rarely square top to bottom or side to side, so it has to be templated as a trapezium rather than a rectangle. The wall makes that decision, not the brochure. In the Nash terraces you are working under listed consent against vaulted, uneven basement walls where nothing is square, so template on site and expect a scribe on every back edge.
How does the stone actually reach a kitchen in Regent's Park?
The Outer Circle has strict waiting restrictions and no loading in front of the terraces, so access to the listed houses is by an area stair or a rear service entrance. The post-war estate has its own internal roads and lifts, which is a completely different set of rules on the same day. Communal stairs get boarded and the handrail padded, and we walk the route with a tape before the first piece leaves the van. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. It decides panel size before anything is cut.
Is Regent's Park really a worktop splashbacks & upstands area?
Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop templating, worktop design & quotation and worktop installation. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Same batch, same run, same day. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Sockets final before template.
Why do two Regent's Park kitchens the same size price differently?
The catch with a galley is that both runs are seen end-on from the doorway, so any difference in overhang between the two reads immediately. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Corners get their own pieces. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What has to be finished before you can template?
The stone carries the scribe because the wall cannot be persuaded, so back edges are cut oversize and eased in rather than dropped straight down. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. An upstand rides what a panel exposes. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. Where ownership is split across a building, the common parts belong to someone else and the carry route is negotiated rather than assumed. Full-height panels need the wall made good first, which is another trade and another timescale. The wall has to be ready.
Related
More around Regent's Park
Other work we do in Regent's Park
Next step
Splashbacks and upstands in Regent's Park, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.