Skip to content

Camden · NW6 NW3

Restaurant and cafe table tops in South Hampstead

Table tops cut to your bases, with the edge profiled all the way round and the fixing centres drilled to the plate you already own.

  • 5.0from 26 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

South Hampstead kitchens

The buildings and streets around South Hampstead

Victorian villa conversionred-brick mansion blockEdwardian terrace

The reason stone table top work in South Hampstead is quoted per kitchen rather than per metre comes down to the range of rooms these worktops end up in. Large villas divided into two or three flats, which leaves kitchens in odd positions such as a converted bedroom, a rear return or an extended half-landing, and rarely gives you two long parallel walls. Runs sit at 2.4-3m with a lot of fitted corner work around bay windows and blocked fireplace openings. The drawing we work from is agreed with you first, so no one in South Hampstead finds out on fitting day that something was assumed.

A lantern or a rooflight over the room throws raking light across every horizontal surface, which shows a lipped join from the far side of the kitchen. The material is chosen for what lands on it between opening and close, hot plates, spilt wine and a sanitiser cloth, rather than for how it photographs. Nothing is drilled in your dining room.

These kitchens are big rooms with long perimeter runs and an island, so level has to hold across the whole floor rather than along one wall. Deliveries come off a drive or a wide verge, so a whole order can be staged outside and taken in a room at a time. Old floors fall away and the feet take it up.

The building types here are Victorian villa conversion, red-brick mansion block and Edwardian terrace. Which of those you have decides most of what follows.

True everywhere

Restaurant and cafe table tops, in short

  • Every edge is profiled and polished, because every edge is visible and touchable.
  • Fixing centres are drilled to the base plate you already have, so bring us one or its drawing.
  • Thicker stone or a mitred edge reads as a heavier table without adding much weight to lift.
  • Round and oval tops are cut on the CNC, not by hand, so the curve is true all the way round.
Borough
Camden
Postcodes
NW6, NW3
Covered on
our central and north London run
Fitted
5–10 working days from template

The place

Why South Hampstead is its own job

We have carried enough stone into kitchens in South Hampstead to know what to allow for before the day arrives. Permit bays fill early and many villas sit back behind long front paths, so the carry is 15-25 metres before you even reach the door. No lifts in the conversions, and the original staircases are generous in width but have winders at the turn. Winder stairs are worse than narrow ones for slab work because the effective diagonal shrinks at the turn, so size pieces off the tightest tread rather than the landing. We template South Hampstead kitchens after the units are in and levelled, which is the only point at which the real measurements exist.

The work

What restaurant table tops involves

Square, rectangular, round and oval tops are all cut here, the curved ones on the CNC from a drawing rather than dressed by hand off a scribed line. Holes are drilled blind on a pillar drill at the works, to a stopped depth, and threaded sockets are resin-anchored into them so the bolt pulls against metal. You get a surface that can be wiped down hard at close without dulling, which is most of what separates a contract specification from a domestic one.

The work is a batch: a dining room orders tops by the dozen, and they have to come off the same run of slab to match each other. Threaded sockets are resin-anchored into those holes, which gives the bolt something to pull against other than bare stone. Several small rooms mean several sizes, and each size is drawn and priced on its own line. Finished on every edge, because every edge is seen.

Undermounted sink cut-out in a quartz worktop
Sink cut-outsSee the options

The money

What it costs in South Hampstead

Buying the room as one batch is cheaper than buying it twice, because a slab is committed once and its offcuts work for the whole order. Short lengths nest well and waste little, so the material line is usually the kindest part of a galley quote. The stone itself is £110 to £550 per square metre supply only; everything done to it is priced separately and shown separately. Priced by the top, and the count is on the quote.

period detached houses and villas

The carry, and what it rules out

Communal stairs get boarded and the handrail padded, and we walk the route with a tape before the first piece leaves the van. What gets damaged on a route like that is a corner, and a table corner is polished, exposed and at precisely the height of a door frame. The frame needs the clearance the piece does.

period detached houses and villas

What South Hampstead asks for

Not a domestic job, so it is not ranked against the streets around it. Those streets generate worktop replacement, worktop templating and worktop installation. Same slabs, same saw, same installers.

period detached houses and villas

South Hampstead in the housing figures

In this neighbourhood the great majority of the housing predates the First World War. The blocks set the piece sizes as much as the run does. None of that is scribed against here, since a table stands clear of every wall, but it does decide which diameters clear the gangways. Material answers to service, not to the lighting.

Access

Getting stone into a South Hampstead kitchen

Permit bays fill early and many villas sit back behind long front paths, so the carry is 15-25 metres before you even reach the door. No lifts in the conversions, and the original staircases are generous in width but have winders at the turn.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted, working days from template. The same on this patch as every other.

central and north London patch

South Hampstead is covered on our central and north London run, along with the rest of Camden.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in South Hampstead

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Is South Hampstead on your patch?

Yes. South Hampstead is on the patch, and the postcodes we work here are NW6, NW3. It is worked on our central and north London run, along with the rest of Camden. A resident bay and a shared-use bay can sit on the same street under different rules, and it is usually the shared one a visitor permit or a ticket touches. A table order comes off the van as a stack of frames and a pallet of bases, and both of those need somewhere to stand before either is moved. Pieces are staged inside before the van is moved off. The work comes to you. We template in your kitchen and fit in your kitchen, with nothing to visit or collect.

Does the housing in South Hampstead change how restaurant table tops works?

Original walls are thick, lime-plastered and rarely straight, which makes dry-laying and scribing the bulk of the fitting day. Hospitality in an area like this is usually a converted house or an old inn, so the dining space is several small rooms rather than one, and each room takes a different table size. What the unit was before decides what it needs now. The face of a breast is rarely flat, and a top returning onto it picks up that bow across the last few hundred millimetres of its length. None of that is scribed against on a table, since it stands clear of every wall, so the awkwardness moves from the back edge to the floor and the base. What the room does to the base matters more than the wall.

How does the stone actually reach a kitchen in South Hampstead?

Weight tells on a staircase more than anywhere else, because there is nowhere to set a piece down mid-flight and no way to change your grip once it is moving. A table order is many small pieces rather than one long one, so the route decides how many trips the delivery takes rather than how big anything can be. A stack of tops is a weight before it is a delivery. A shared-use bay allows a paid stay up to a set maximum, and that maximum is routinely shorter than the working day the job needs. The bases are the heavy half of the delivery, so the pallet is dealt with first while there are still hands free for it. The pavement stays walkable while the frames come off.

Would you call South Hampstead a restaurant table tops area?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop replacement, worktop templating and worktop installation. That is a point about the buildings round here, not about the job. The quoting, the cutting and the fitting are identical here to anywhere else we work. Several units in one building are fitted out to the same drawing, so an error on that drawing is an error repeated in every flat. Table work arrives as a batch by its nature, and a batch means one slab run rather than the same colour ordered twice a year apart. The count is agreed before the slab is committed. A converted flat is measured off the original house, so no two units in the same building have quite the same kitchen run. Where an operator changes hands the bases usually stay, so a refit becomes a resurface and the saving comes from what is already bolted down. Lead time is the reason the date is set early.

What am I actually paying for, line by line?

A run that stops in mid-air at the open end needs a finished end rather than a cut one, and that end takes the same edge work as the whole front. A table top answers to none of that, since it meets no wall and needs no scribe, but the pieces come off the same slab as the counter and the colour has to carry across both. The blank decides the diameter, not the other way round. The material band is £110 to £550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

Is there anything I have to finish before the template in South Hampstead?

Old breasts carry a bulge low down where the original opening was closed up, and the units stand off it before the stone is measured at all. A column, a boxed duct or a fixed bench in a dining room is designed around with a shape cut to suit rather than notched on site. A thin top over a wide plate wants a pad underneath. Send a plan of each room with its table sizes against it, and say which covers are outdoors so the material can be split before anything is priced. Where two people share the decision it helps to know early which of them is settling the edge profile and which is settling the budget, because it is rarely the same person for both. A table top bolted to a base you already own is loose furniture rather than a fixture, so it leaves with the operator at the end of a term. Bolted to your own bases, so they leave when you do.

Who decides where a join falls?

A join sits over a cabinet gable. It never spans a gap and never runs through a cut-out. A mitred join at a corner is a different job from a butt join along a run, and they are not priced the same. What you get is a line rather than a step, because the pieces are levelled to each other first. Where a run finishes hard against a wall the last few millimetres are scribed, and where it finishes in open floor it is cut square and polished, which is two different jobs on one length. What decides the cut list here is the seating plan rather than the room shape, and one repeated table size nests far better than six one-offs. Mixed sizes are fine; unplanned mixed sizes are not.

Do you quote South Hampstead jobs by the square metre?

The design and quotation visit is free and carries no obligation, so a figure exists before any commitment. No installed price per square metre is published, because it is not a real number. What moves the figure after templating is a change you make: a different edge, an extra cut-out, a bigger sink chosen late. Two alcove pieces will not swap over however similar they look, so they are marked left and right at the bench and stay that way to the van. Where a floor falls away, the levelling is done by winding out the feet under each base rather than by packing anything under the stone. Uneven flags outside are why outdoor feet adjust.

What do you need from me for the sink and hob cut-outs?

A Belfast or butler sink has to be installed and at its final height before the template, because the stone is cut to sit on it. A tap under a window board still needs room for its handle to lift, which is checked at the template. A sit-on sink and an undermounted one are different cut-outs, so which it is gets settled before the template. A doorway partway along one wall breaks that side into two separate pieces, and two short pieces cost more between them than the single long one they replace. Where a servery run forces a join, the tables never carry one, because a table top is a single piece of stone or it is not a table top. What a counter leaves behind is worth designing for.

What if something breaks during the fit?

A dropped pan years later is a different question, and stone is remade rather than filled either way. A piece is never laid flat across a gap while it is moved, because that is how stone cracks unaided. Our own installers do the carry, so there is nobody in the middle to argue with about it. Every flight adds a set of handling movements, and handling is where stone gets damaged, so a fourth-floor walk-up is priced by the flight rather than by the metre. Tops travel upright in a padded frame, and it is the frame rather than the person carrying it that has to clear the tightest turn. Battens under anything that has to wait.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 on Google →
Karem did an excellent job on my kitchen. He was professional, reliable, and paid great attention to detail. The finish looks amazing and has completely transformed my kitchen. Thank you! Would highly recommend his work!

Catalina Radu

Google review

Excellent work and highly recommend. Very professional and did an outstanding job with my worktop. Karem responded very quickly and swiftly, top guy!

Faisal K

Google review

Perfect service,the best on this job

Kleant Istrefi

Google review

Next step

Restaurant and cafe table tops in South Hampstead, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489