Skip to content

Camden · WC1

Stone bar tops in Bloomsbury

A bar top takes weight on its front edge all evening, so the overhang and what carries it matter more than the slab does.

  • 5.0from 26 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Bloomsbury kitchens

The buildings and streets around Bloomsbury

Georgian townhouselisted square terraceEdwardian mansion blockpost-war institutional conversion

We plan the bar tops in Bloomsbury around access, ceiling height and what the kitchen has already been through, none of which shows up in a phone call. Listed Georgian townhouses split into flats, so kitchens land wherever the conversion put them, commonly a former closet wing or the rear of a larger room with a single 2.4-3m run against an internal wall. Mansion flats have a small fixed kitchen off a central hall and no realistic way to widen it. Tell us which street you are on in Bloomsbury and what the old worktop is, and we can usually narrow it down before we visit.

Lath and plaster, a settled floor and a hall with a turn in it are the three things that decide how this job runs. What carries a bar top here is rarely a kitchen carcass, so the framing underneath gets looked at before anything is measured across the top of it. People push against the front edge, so the front edge gets the steel.

Winders at the head of each flight are the tightest part of the climb and they are appreciably tighter than the straight run below them. Getting a top through the hall and round the newel caps its length, so a long counter in one of these houses is drawn as two pieces with the break sitting over a corbel. Old floors move, so the bar is fixed back as well as down.

What the surveys keep coming back to is Georgian townhouse, listed square terrace, Edwardian mansion block and post-war institutional conversion. The join count is decided by which of those the room sits in.

True everywhere

Stone bar tops, in short

  • Anything past about 300mm of unsupported overhang gets steel or a corbel underneath.
  • The front edge is the one people touch, so it is profiled and polished on all exposed faces.
  • Quartz is the usual choice indoors; porcelain and sintered stone where drinks and citrus are constant.
  • A bar top is fitted level to itself, not to the floor, because floors in older buildings rarely are.
Borough
Camden
Postcodes
WC1
Covered on
our central and north London run
Fitted
5–10 working days from template

The place

Why Bloomsbury is its own job

What we plan around in Bloomsbury has less to do with the worktop than with getting it through the door and against the wall. Inside the Congestion Charge zone with a Monday to Saturday CPZ and almost no loading bays around the squares, and Euston Road on the northern edge is a red route. Communal Georgian staircases are steep with narrow winders and cannot be marked, so protection and small pieces are the norm. Listed communal stairs mean carrying pieces you can hand-turn on a winder, and joins get placed where the client will see them least rather than where the layout suggests. It goes on the drawing, you agree the drawing, and the workshop cuts to that. Nothing is decided on the day.

The work

What bar tops involves

It suits a home bar in a converted cellar or a lounge, a breakfast counter on the end of a run, and a working trade bar with a sink and a drip tray underneath. Where the front edge reaches past what the frame will carry, flat steel is let in flush with the bearing face or corbels are fixed to structure, and which of the two is agreed with you rather than decided on the morning. You end up with a front edge that takes people leaning on it all evening without the top shifting, because the load was worked out before the stone was ordered.

Stone bar tops divide into two kinds of work: a home bar built into a room somebody lives in, and a trade counter that has to survive a service every night. The top is levelled along its own length and packed off the frame, since a floor in an older building will not give a straight line to work from. In a house of this age the bar generally stands in a through-lounge or a cellar, and neither floor is flat enough to set a frame down on without packing it. Every face somebody can see is finished.

Mitred waterfall edge detail on a quartz island
Waterfall endsSee the options

The money

What it costs in Bloomsbury

Material choice moves the figure less than the detail does, and on a bar the detail means the apron, the radius and whatever sits under the front edge. In a galley the runs are short and the cut-outs are close together, so the fixed operations carry more of the total than the stone does. Supply-only material sits between £110 and £550 per square metre, which is one input into the quote rather than the quote. You see what the projection costs before agreeing to it.

period detached houses and villas

The carry, and what it rules out

A walk-up with winders at every half-landing means the piece is rested and re-gripped on the way, so the crew size goes up before the piece size comes down. Where the bar is going into a cellar the pieces travel downward rather than up, and carrying stone down a flight gives a crew less control over it, not more. Cellar bars go down a flight, which is the harder direction.

period detached houses and villas

What Bloomsbury asks for

Commercial rather than residential, and priced from the drawing rather than from the housing type. Residentially, worktop templating, worktop replacement and worktop splashbacks & upstands is what comes up here. The fabrication is identical.

period detached houses and villas

Bloomsbury in the housing figures

Across this patch houses are the minority and blocks are the norm. A bar top that has to go up in a lift is drawn to the car rather than to the room, and the break that follows is placed behind a corbel. The projection is the first line on the drawing.

Access

Getting stone into a Bloomsbury kitchen

Inside the Congestion Charge zone with a Monday to Saturday CPZ and almost no loading bays around the squares, and Euston Road on the northern edge is a red route. Communal Georgian staircases are steep with narrow winders and cannot be marked, so protection and small pieces are the norm.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted, working days from template. The same on this patch as every other.

central and north London patch

Bloomsbury is covered on our central and north London run, along with the rest of Camden.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Bloomsbury

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do your own fitters come out to Bloomsbury?

Yes. Bloomsbury is on the patch, and the postcodes we work here are WC1. It is worked on our central and north London run, along with the rest of Camden. Where a marked loading box sits on the red route the stop is legal but timed, so the unload runs as one movement with every hand on it. A bar fit runs longer than a worktop run, because the frame, the support and the stone are three stages and only the last of them is quick. Where parking is tight the hardware walks in ahead of the stone. Template and fit both happen at the property, so there is nothing to drive to and nothing to collect.

What should I expect from bar tops in a Bloomsbury kitchen?

Ceilings in the principal rooms are three metres or more, so a full-height panel behind a hob is a taller piece here than the same kitchen would need anywhere else. A bar in one of these houses is either the end of a through-lounge or a cellar conversion, and the two behave differently. A bar in a small room is drawn for the stools it will take. Two walls each a degree out give an internal corner two degrees out, and the whole of that error lands in the mitre. On a bar that counts twice over, because the same obstruction has to be cleared by the stone above it and by the knees of whoever is sitting at it. The support plan is drawn at the same time as the cut-out.

How would you get a worktop into a property in Bloomsbury?

Communal stairs get boarded and the handrail padded, and we walk the route with a tape before the first piece leaves the van. That matters more on a bar than on a run, because a join forced by the way in cannot be allowed to land in the unsupported part of the nose. Front tier and back tier are carried and set as two pieces. A bus lane along the frontage brings its own hours with it, and stopping in one is enforced the same way the red route is. That has to cover more than the unload, since the corbels, the flat bar and the fixings all come off the van well before the top does. A bar top left on a pavement is a bar top with a chipped nose.

Do you get much bar tops work in Bloomsbury?

Not particularly. It would be easy to say yes and leave it there. What the research on this patch actually lists is worktop templating, worktop replacement and worktop splashbacks & upstands. That is about what people have here rather than how it gets done. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. Party-wall and lease conditions in a converted building set when noisy work can happen, which shapes the fitting day more than the kitchen does. Where the same detail is repeating across several rooms the support gets standardised once and then cut to length, which is cheaper than drawing it each time. A late bar is a separate visit and the quote says so. Several units in one building are fitted out to the same drawing, so an error on that drawing is an error repeated in every flat. Harder use and stronger cleaning products push the answer towards porcelain or sintered stone, because a resin-bound surface is the one that shows what has been left standing on it. Nothing is assumed about a frame somebody else built.

What moves the number on a quote around here?

Both runs are in view at the same time, so the two pieces are taken off the same area of slab and the veining is set to run the same way on each side. A bar laid over that is a second level rather than a wider one, so it wants a spine underneath it and a settled detail where the two heights meet. The bar is set out from the seat and worked back to the units. Expect £110 to £550 per square metre for material supply only, with templating, fabrication and fitting on their own lines.

What state does a Bloomsbury kitchen have to be in before you template?

A scribe has a working limit, and past twenty millimetres or so the back edge starts eating depth the run cannot spare. A bar top is levelled to itself rather than to what it stands on, so the packing goes into the frame and the stools take up whatever the floor is doing. A bar top will not correct a frame that is out of true. Send the length you want, the number of stools, and photographs walking from the pavement through to the room, including the cellar stair if the bar is going down there. Where ownership is split across a building, the common parts belong to someone else and the carry route is negotiated rather than assumed. A home bar is discretionary work, so the edge profile, the corbel detail and the radius on the nose are worth settling properly rather than defaulting to whatever is quickest. Seating height is set to a person or to a standard, and stated.

What if something breaks during the fit?

A remade piece is cut from the same slab run wherever the slab allows, because a replacement from another batch will not match across a join. Most breakages happen on the carry, which is why the route is walked and measured before anything comes off the van. The rest of the kitchen still goes in. One damaged piece does not hold up the pieces either side. Weight tells on a staircase more than anywhere else, because there is nowhere to set a piece down mid-flight and no way to change your grip once it is moving. The steel and the corbels travel that same route and go in first, so a bar is three separate carries into one room rather than a single delivery. Where the route is tight the bar gains a join behind a corbel.

Can you fit stone I have already bought for a Bloomsbury kitchen?

If your own slab breaks there is no matching replacement to hand, and that is the real difference. Order is what matters: a slab is templated before it is cut, so an uncut slab is straightforward and one already machined for another kitchen is not. Stone cut to somebody else’s drawing cannot usefully be re-cut to yours. A converted flat is measured off the original house, so no two units in the same building have quite the same kitchen run. The support has to be specified to whoever is building the frame before it is boarded up, since steel let in afterwards means taking the front of the bar apart again. The overhang is checked against the frame that exists.

Can you get a full-length top into an upstairs kitchen in Bloomsbury?

An external stair, a side return or a rear garden counts as carry and is measured the same way. Hoisting through a window is occasionally the answer, and it is a decision made at the template, not improvised on the fitting day. Where there is a lift, whether it can be booked out and padded matters as much as its size. Every flight adds a set of handling movements, and handling is where stone gets damaged, so a fourth-floor walk-up is priced by the flight rather than by the metre. A top with a bonded apron on the front arrives deeper than a worktop and behaves like a beam, so there is no easing it round a turn at all. A polished front edge is protected from the tail lift to the frame.

Will I be able to see the joins?

A mitred join at a corner is a different job from a butt join along a run, and they are not priced the same. A join cannot cross a cut-out, so a sink mid-run takes away the position you would have used. There are only ever a few legal positions, and the one taken is furthest from the light. A galley closed at one end takes a short return across the top, and that little piece carries the same edge work, the same handling and nearly the same cost as a full length. Where the counter runs flush with the working surface instead of standing above it the whole thing becomes one plane, which looks better and doubles the unsupported span. A foot rail is planned with the frame, not bolted on later.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 on Google →
Kareem did the countertops dur8ng my kitchen remodel, and I was so impressed that I had him back to do the laundry room as well, which tells you everything you need to know. He is an absolute gem. Shows up when he says he will (which, let’s be honest, is rarer than it should be), does beautifully work, and clearly takes real pride in what he does. The countertops look fantastic, and he even went above and beyond, using leftover quartz to create an extra counter in my bathroom. Genius. He’s kind, professional, reasonably priced, and just gets on with it. No fuss, no drama, just a job very well done. I wouldn’t hesitate to recommend him and will absolutely be using him again if the need arises. Happy to answer any questions.

Susie Wiggins

Google review

Karim is excellent, he did superb job with Templeting and fitting my kitchen, highly recommend

M Sg

Google review

I am really happy with the work! He fitted my kitchen granite worktop really nicely and got the job done on time, just as promised. He was friendly, professional, and made sure everything was done the way I wanted. Would definitely recommend Karam to anyone looking for a great job!

esther boadu

Google review · granite

Next step

Stone bar tops in Bloomsbury, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489