Skip to content

Hammersmith and Fulham · W6 W14

Splashbacks and upstands in Brook Green

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

Brook Green kitchens

What the kitchens here are actually like

large late Victorian family terracered-brick Edwardian housemansion flatVictorian villa converted to flats

Lath and plaster, a settled floor and a hall with a turn in it are the three things that decide how this job runs. Socket positions, sill heights and wall flatness are the three things that settle this, and all three are properties of the building. Same slab run, same day, same batch.

This is family-house territory with wide plots, so kitchens are the big rear room after a side-return or full-width extension, running 4m plus with a 2.4-3m island and often a second sink in the island.

Because the extensions are new build, the walls are square and level, which means single long pieces and mitred waterfall ends are actually achievable rather than aspirational.

The addition wall is half a brick thick in places and has usually had a damp course injected and been re-plastered, which leaves it neither flat nor consistent. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here, it rides the bow and hides the junction the worktop can never close on its own. The wall makes that decision, not the brochure.

What we are usually templating in is large late Victorian family terrace, red-brick Edwardian house, mansion flat and Victorian villa converted to flats. The differences between them show up at template, not at enquiry.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered on our west London run. Fitted 3–7 working days from template.

Victorian and Edwardian terraces

Getting stone into the room

Quiet residential streets with CPZ permit bays and reasonable width, so a van can usually get within 20m, but almost every house has a front path with two or three steps and a tiled Victorian threshold you do not want to chip. Where an extension is still under construction the back garden route via a neighbour or a side gate is often open and is far better than the hall.

Victorian and Edwardian terraces

What gets asked for here

This is not the local speciality and there is no point saying otherwise: worktop design & quotation, worktop fabrication and worktop installation is what the housing here actually asks for. It is quoted, cut and fitted exactly the same way regardless.

Victorian and Edwardian terraces

The building, and what it does to the job

Get in while the extension is still a building site and take the stone through the open rear wall - once the bifolds are glazed you are back to fighting the hallway.

A low sill over the sink run is what decides between an upstand and stone dying into a window board, and there is often less clearance than an upstand is tall. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. An upstand rides what a panel exposes.

Access

Getting stone into a Brook Green kitchen

Quiet residential streets with CPZ permit bays and reasonable width, so a van can usually get within 20m, but almost every house has a front path with two or three steps and a tiled Victorian threshold you do not want to chip. Where an extension is still under construction the back garden route via a neighbour or a side gate is often open and is far better than the hall.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

west London patch

Brook Green is covered on our west London run, along with the rest of Hammersmith and Fulham.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in Brook Green

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Is Brook Green on your patch?

Yes. Brook Green is on the patch, and the postcodes we work here are W6, W14. It is worked on our west London run, along with the rest of Hammersmith and Fulham. Enforcement zones rarely accept a trade van unloading stone as an exemption, so this gets sorted before the date is confirmed rather than argued about afterwards. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. One trip is always better than three. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Why would worktop splashbacks & upstands in Brook Green be any different from anywhere else?

The addition wall is half a brick thick in places and has usually had a damp course injected and been re-plastered, which leaves it neither flat nor consistent. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here, it rides the bow and hides the junction the worktop can never close on its own. Decided before fabrication starts. Get in while the extension is still a building site and take the stone through the open rear wall - once the bifolds are glazed you are back to fighting the hallway.

How would you get a worktop into a property in Brook Green?

Quiet residential streets with CPZ permit bays and reasonable width, so a van can usually get within 20m, but almost every house has a front path with two or three steps and a tiled Victorian threshold you do not want to chip. Where an extension is still under construction the back garden route via a neighbour or a side gate is often open and is far better than the hall. A narrow entrance hall with a turn into the back of the house caps the longest piece we can physically get in, whatever the run itself measures. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. Joint positions follow from that.

Is Brook Green really a worktop splashbacks & upstands area?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop design & quotation, worktop fabrication and worktop installation. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. A second kitchen or a kitchenette in an annexe is a small job with the same fixed template, fabrication and fitting lines as a large one. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Same batch, same run, same day. Where an annexe has been built or converted, its floor and its walls are newer than the main house and behave differently under the same run. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Siliconed to the worktop, never grouted.

What moves the number on a quote around here?

An island is a single visible piece with four finished edges and no wall to hide against, so it is the piece the whole kitchen is judged on. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Corners get their own pieces. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What needs to be ready before you come to Brook Green?

Window boards and cills stand proud of the plaster, so the back edge of the top has to be plotted to where the units actually sit rather than to the wall. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. An upstand rides what a panel exposes. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. Where someone is living in the house through the work, the strip-out and the fit are planned so the kitchen is out of use for a day and not a week. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. The wall has to be ready.

Next step

Splashbacks and upstands in Brook Green, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489