Skip to content

Merton · SW19 CR4

Splashbacks and upstands in Colliers Wood

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

Colliers Wood kitchens

What the kitchens here are actually like

Victorian terrace1930s semi2010s riverside apartmentPostwar tower block

The lift car, the loading bay and the building manager decide the piece sizes here, not the slab. Socket positions, sill heights and wall flatness are the three things that settle this, and all three are properties of the building. Same slab run, same day, same batch.

Two distinct jobs sit side by side here. The riverside apartments off the Wandle came with developer-spec kitchens where owners swap the composite or laminate top for quartz and keep the layout, while the terraces behind the High Street get a modest rear extension with a single wall run and a small breakfast peninsula.

Developer kitchens here are built to a tight 600mm module with the sink already cut into a fixed position, so measure the existing cutouts before quoting a straight swap. The older terraces sit on streets that back onto the river and industrial units, so vans get boxed in by delivery traffic on the A24.

Piece size is set by the lift car and the entrance dogleg, which routinely turns a two-piece kitchen into a three-piece one. The plasterboard is flat enough for a full-height panel; it is the socket positions that cause the trouble. Decided before fabrication starts.

What we are usually templating in is Victorian terrace, 1930s semi, 2010s riverside apartment and Postwar tower block. Each of those behaves differently once the old top comes off.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered on our south west London run. Fitted 3–7 working days from template.

Victorian and Edwardian terraces

What gets asked for here

An owner living in the house makes the decisions and lives with them, so the specification tends to go towards the material rather than towards the lowest total. Splashbacks are cut from the same slab run as the tops, so they have to be decided before fabrication, not after. Same slab run as the tops.

Second or third on the list around here, after worktop replacement. Same visit, same bench, same crew, same lead time.

Victorian and Edwardian terraces

Getting stone into the room

The new blocks have loading bays and a goods lift but both need booking with the concierge and there is a hard time limit on the bay.

Access

Getting stone into a Colliers Wood kitchen

The new blocks have loading bays and a goods lift but both need booking with the concierge and there is a hard time limit on the bay. The older terraces sit on streets that back onto the river and industrial units, so vans get boxed in by delivery traffic on the A24.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

south west London patch

Colliers Wood is covered on our south west London run, along with the rest of Merton.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in Colliers Wood

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you cover Colliers Wood?

Yes. Colliers Wood is on the patch, and the postcodes we work here are SW19, CR4. It is worked on our south west London run, along with the rest of Merton. Underground loading has a height restriction, and a van with an A-frame on it is taller than the driver remembers. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. Handling is where these pieces get damaged. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Does the housing in Colliers Wood change how worktop splashbacks & upstands works?

Dot-and-dab plasterboard bellies at a taped internal angle, so the run picks up a few millimetres over the last 300mm and a plan-angle mitre will not close. The plasterboard is genuinely flat here, so a full-height splashback sits well and a slim upstand looks almost redundant, but the sockets are the problem, because they are set out to the developer's original kitchen and often land at odd heights or right on a joint line. Cut from the same slab run as the tops. Developer kitchens here are built to a tight 600mm module with the sink already cut into a fixed position, so measure the existing cutouts before quoting a straight swap.

How does the stone actually reach a kitchen in Colliers Wood?

The new blocks have loading bays and a goods lift but both need booking with the concierge and there is a hard time limit on the bay. The older terraces sit on streets that back onto the river and industrial units, so vans get boxed in by delivery traffic on the A24. Where the lift will not take the longest run we design a join in rather than gamble, because a piece that will not go up has to go back on the van. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. It decides panel size before anything is cut.

Is worktop splashbacks & upstands common in Colliers Wood?

It is one of the three we do most here, behind worktop replacement. Same template visit, same workshop, same installers either way. Handover-spec kitchens are square, plumb and predictable, which means the join count is honest and driven by run length rather than by the building. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Sockets final before template. Housings and integrated appliances are set out for a 38mm laminate top, so dropping to 20mm or 30mm stone changes the clearances and needs checking before anything is cut. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Siliconed to the worktop, never grouted.

Why do two Colliers Wood kitchens the same size price differently?

Galley runs are usually short enough to come out of a single slab, so the material band you choose does more to the total than the room shape does. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. Joint placement is a decision, not an accident. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What has to be finished before you can template?

Boxing is rarely the same depth at worktop height as it is at floor level, so measuring it low down is the usual reason a top will not sit back. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. An upstand rides what a panel exposes. Any socket you intend to move must be moved and re-plastered before templating, because a cut-out in the wrong place means a new piece of stone. Owner-occupied kitchens are usually being done once, which is why the edge profile, the vein direction and where a join falls are worth the conversation. Full-height panels need the wall made good first, which is another trade and another timescale. Same slab run as the tops.

Next step

Splashbacks and upstands in Colliers Wood, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489