Skip to content

Kingston upon Thames · KT2

Splashbacks and upstands in Coombe (Kingston)

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

Coombe (Kingston) kitchens

What the kitchens here are actually like

Edwardian mansion house1930s detached1960s architect-designed housemodern replacement house

Lath and plaster, a settled floor and a hall with a turn in it are the three things that decide how this job runs. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Siliconed to the top, never grouted.

Some of the largest domestic kitchens in the borough - big open-plan family rooms with an island of 3m or more, a second sink, integrated coffee stations and boiling taps, plus back kitchens or prep pantries with their own worktops and splashbacks.

Private gated estate roads with entry codes and a caretaker, long in-and-out driveways with ample standing, and rear garden access wide enough to bring stone round the outside instead of through the house.

Deep original skirting is often left in behind the units, standing them off the wall, so the back edge of the stone is plotted where the carcasses actually sit. A 100mm upstand bedded on silicone is the honest answer where the plaster bows, because it rides what a tall panel exposes. The wall makes that decision, not the brochure.

On these streets the housing is Edwardian mansion house, 1930s detached, 1960s architect-designed house and modern replacement house. Each of those behaves differently once the old top comes off.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered on our south west London run. Fitted 3–7 working days from template.

Victorian and Edwardian terraces

Getting stone into the room

Off-street parking means the van stays put all day, so tools, packers and the offcut we would rather have than not are all within reach. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. One trip is always better than three.

Victorian and Edwardian terraces

What gets asked for here

Honestly, this is not what we do most on this patch. Worktop design & quotation, worktop fabrication and worktop installation come up more often. That is a statement about the local housing rather than about the work, and nothing about how it is quoted, cut or fitted changes because of it.

Victorian and Edwardian terraces

The building, and what it does to the job

These are drawing-office jobs - book-matched islands, mitred 100mm aprons and full-height panels, so the slab is chosen off the rack before templating.

Access

Getting stone into a Coombe (Kingston) kitchen

Private gated estate roads with entry codes and a caretaker, long in-and-out driveways with ample standing, and rear garden access wide enough to bring stone round the outside instead of through the house.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

south west London patch

Coombe (Kingston) is covered on our south west London run, along with the rest of Kingston upon Thames.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in Coombe (Kingston)

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you cover Coombe (Kingston)?

Yes. Coombe (Kingston) is on the patch, and the postcodes we work here are KT2. It is worked on our south west London run, along with the rest of Kingston upon Thames. Off-street parking means the van stays put all day, so tools, packers and the offcut we would rather have than not are all within reach. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. That is why they are crated the way they are. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Does the housing in Coombe (Kingston) change how worktop splashbacks & upstands works?

A bay-fronted terrace has a long hall running past the stairs to the kitchen, so the hall turn caps the piece length before the run length does. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here, it rides the bow and hides the junction the worktop can never close on its own. Cut from the same slab run as the tops. These are drawing-office jobs - book-matched islands, mitred 100mm aprons and full-height panels, so the slab is chosen off the rack before templating.

How does the stone actually reach a kitchen in Coombe (Kingston)?

Private gated estate roads with entry codes and a caretaker, long in-and-out driveways with ample standing, and rear garden access wide enough to bring stone round the outside instead of through the house. Estate roads are often too tight for a long-wheelbase van to turn, so the carry starts a good deal further from the door than a map suggests. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. Joint positions follow from that.

Is Coombe (Kingston) really a worktop splashbacks & upstands area?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop design & quotation, worktop fabrication and worktop installation. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. Where an annexe has been built or converted, its floor and its walls are newer than the main house and behave differently under the same run. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Siliconed to the worktop, never grouted. Extended households run kitchens hard, and that pushes the specification towards granite or sintered stone rather than a light quartz. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Sockets final before template.

Why do two Coombe (Kingston) kitchens the same size price differently?

Seating overhangs past roughly 300mm will not carry on the carcass alone, so flat steel bar or a plywood substrate has to be built into the units first. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. The joint to the worktop is siliconed, never grouted. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What has to be finished before you can template?

Walls that bow along their length are the normal condition rather than the exception, and a straight-cut back edge will show a shadow gap at one end and touch at the other. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Scribed, dubbed out, or set proud. Pick one. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. The same building type can arrive as a careful one-off kitchen or as a fast turnaround, and the honest answer is that they are priced differently. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Same slab run as the tops.

Next step

Splashbacks and upstands in Coombe (Kingston), priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489