
Newham · E16
Worktop installation in Custom House
Fitting day: protected route, back edges scribed to the real wall line, joins pulled flush, sink and hob sealed.
- 5.0from 23 Google reviews
- 25-year material · 5-year workmanship
- Fitted 3-7 working days from template
Custom House kitchens
What the kitchens here are actually like
Solid brick with a sand and cement render is firm to work against and reliably out of plumb across the length of a run. The fitting day is planned backwards from all of it, before the first piece comes off the van. The route is walked before the first lift.
Older terraces and council houses have small rear kitchens of around 2.2m to 2.6m with a pantry recess and a back door in the run. New replacement blocks have single-wall open-plan kitchens, so the work is either a small traditional refit or a like-for-like swap in a modern flat.
Where houses survive there is decent kerb space and level front access, which makes those the straightforward jobs. Ongoing regeneration means hoardings, closed roads and diverted footways that change month to month, so the route needs checking on the day rather than from a map. Site hoardings regularly block the road you templated from, so leave a bit of slack in the delivery window for a diverted approach.
An inter-war terrace is wider than a Victorian one and shallower than a semi, so the kitchen is a compact square room rather than a galley. The carry is the easy part; the plaster around the old breast and the packing over a moved floor are not. That is the shape of the day.
The buildings themselves are mostly interwar terrace, post-war council housing and recent regeneration apartment. They are not interchangeable, and a worktop finds the differences quickly.
True everywhere
Worktop installation, in short
- One visit. A straightforward run is a morning; an island and splashbacks take most of the day.
- Every piece is carried in by hand, and stone does not bend.
- We seat and seal the sink and hob. We do not connect water, waste, gas or electrics.
- Floors and units are protected before anything comes through the door.
Covered on our east London run. Fitted 3–7 working days from template.
1930s and inter-war semis
What gets asked for here
This is one of the three jobs that come up most here, behind worktop replacement. It is the same template visit, the same workshop and the same installers either way.
1930s and inter-war semis
The shape of the run
The catch with a galley is that both runs are seen end-on from the doorway, so any difference in overhang between the two reads immediately. A layout that has been packed and levelled run by run instead of to one datum shows as a step where two pieces meet. Nothing is bonded until the whole run sits flat.
Access
Getting stone into a Custom House kitchen
Ongoing regeneration means hoardings, closed roads and diverted footways that change month to month, so the route needs checking on the day rather than from a map. Where houses survive there is decent kerb space and level front access, which makes those the straightforward jobs.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
east London patch
Custom House is covered on our east London run, along with the rest of Newham.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop installation in Custom House
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you actually work in Custom House, or just list it?
Yes. Custom House is on the patch, and the postcodes we work here are E16. It is worked on our east London run, along with the rest of Newham. A dedicated loading bay or service yard is the easiest arrangement in a managed building, provided the slot is booked and someone has the key to the shutter. A van that has to move mid-fit costs the best part of an hour and takes a man off the tools to do it. It is why the arrival time is what it is. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
What is different about worktop installation in Custom House?
There is usually a shared rear alley, and whether the gate onto it is unlocked decides whether long pieces come in from the back. The fitting itself is slower than the carry: original plaster on the party wall and around the old chimney breast is rarely square to the run, so back scribes get cut on site, and where a return wraps into a breast recess we template that shoulder tight and ease it in. The slow parts are slow for a reason. Site hoardings regularly block the road you templated from, so leave a bit of slack in the delivery window for a diverted approach.
Is access a problem in Custom House?
Ongoing regeneration means hoardings, closed roads and diverted footways that change month to month, so the route needs checking on the day rather than from a map. Where houses survive there is decent kerb space and level front access, which makes those the straightforward jobs. Where the van stands level with the front of the house a piece gets handled twice instead of five times, and stone breaks on handling rather than on the road. The fitting day is planned backwards from that point, before anything comes off the van. It gets checked before the first piece is lifted.
Do you do much worktop installation around Custom House?
It is one of the three we do most here, behind worktop replacement. Same template visit, same workshop, same installers either way. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. The fitting day is scheduled to suit that rather than to suit the diary. Sealed before we leave. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. One visit, with the sink and hob seated and sealed before we leave. One visit, done properly.
What decides the price of a worktop in Custom House?
The catch with a galley is that both runs are seen end-on from the doorway, so any difference in overhang between the two reads immediately. A layout that has been packed and levelled run by run instead of to one datum shows as a step where two pieces meet. Nothing is bonded until the whole run sits flat. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What do I need to sort out first?
A chimney breast left in place splits a wall into two alcoves, and the two are rarely the same width and rarely parallel to each other. The back edge is eased in progressively rather than offered up once and forced. Dry-lay, mark, cut, then bond. Unlock and clear the side gate and back door, and move bins, planters and washing lines out of the alley run. Where a landlord or housing provider is involved there is a specification to meet and a process to follow, and both are settled before a date is offered. Floors and units are protected before anything comes through the door, communal or otherwise. One visit, our own installers.
Related
More around Custom House
Other work we do in Custom House
Next step
Worktop installation in Custom House, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.