Skip to content

Newham · E16

Worktop replacement in Custom House

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

Custom House kitchens

What the kitchens here are actually like

interwar terracepost-war council housingrecent regeneration apartment

These kitchens have usually been retiled twice and knocked through once, and both of those leave marks the worktop has to deal with. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. A single day, planned properly.

Older terraces and council houses have small rear kitchens of around 2.2m to 2.6m with a pantry recess and a back door in the run. New replacement blocks have single-wall open-plan kitchens, so the work is either a small traditional refit or a like-for-like swap in a modern flat.

Site hoardings regularly block the road you templated from, so leave a bit of slack in the delivery window for a diverted approach. Ongoing regeneration means hoardings, closed roads and diverted footways that change month to month, so the route needs checking on the day rather than from a map. Where houses survive there is decent kerb space and level front access, which makes those the straightforward jobs.

Original quarry-tiled floors sit lower than a later screed, so a run crossing that junction needs the units packed to one level. The kitchen is normally the original back room with a later side-return or rear extension bolted on, and that helps us: most pieces can go down the side alley and in through the back door in one length, so we can avoid joins that a front-door route would force. Sound carcasses are the one condition.

On these streets the housing is interwar terrace, post-war council housing and recent regeneration apartment. The differences between them show up at template, not at enquiry.

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • Old tops come out in the morning, new stone is down and sealed the same day.
  • A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
  • The carcasses have to be sound: stone is far heavier than laminate.

Covered on our east London run. Fitted 3–7 working days from template.

1930s and inter-war semis

Getting stone into the room

Underground loading has a height restriction, and a van with an A-frame on it is taller than the driver remembers. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. It is a full day at the kerb, not a delivery.

1930s and inter-war semis

What gets asked for here

This is the job the local stock asks for first, ahead of worktop templating and worktop installation.

Access

Getting stone into a Custom House kitchen

Ongoing regeneration means hoardings, closed roads and diverted footways that change month to month, so the route needs checking on the day rather than from a map. Where houses survive there is decent kerb space and level front access, which makes those the straightforward jobs.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

east London patch

Custom House is covered on our east London run, along with the rest of Newham.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop replacement in Custom House

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Is Custom House on your patch?

Yes. Custom House is on the patch, and the postcodes we work here are E16. It is worked on our east London run, along with the rest of Newham. Underground loading has a height restriction, and a van with an A-frame on it is taller than the driver remembers. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. It is a full day at the kerb, not a delivery. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Why would worktop replacement in Custom House be any different from anywhere else?

Original quarry-tiled floors sit lower than a later screed, so a run crossing that junction needs the units packed to one level. The kitchen is normally the original back room with a later side-return or rear extension bolted on, and that helps us: most pieces can go down the side alley and in through the back door in one length, so we can avoid joins that a front-door route would force. Sound carcasses are the one condition. Site hoardings regularly block the road you templated from, so leave a bit of slack in the delivery window for a diverted approach.

How would you get a worktop into a property in Custom House?

Ongoing regeneration means hoardings, closed roads and diverted footways that change month to month, so the route needs checking on the day rather than from a map. Where houses survive there is decent kerb space and level front access, which makes those the straightforward jobs. A short hard approach with no steps means a full-length piece can be walked in flat by two people rather than turned up on edge. With no room to turn, the old top gets cut up in the kitchen instead, which is dusty work and needs the room emptied first. The strip-out is planned around it.

Is worktop replacement the job you do most in Custom House?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop templating and worktop installation. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. The carcasses have to be sound, because stone is several times the weight of what is coming off. A plumber either side of us. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. A day, not a project.

What moves the number on a quote around here?

The catch with a galley is that both runs are seen end-on from the doorway, so any difference in overhang between the two reads immediately. Old laminate has often been holding a run square for years, and taking it off shows what the units were really doing. The units stay, the surface changes. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What needs to be ready before you come to Custom House?

Where a breast interrupts a long wall the join can often go there, so it reads as a natural break rather than a line in the middle of a worktop. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. Found at template, not on fit day. Unlock the side gate and clear the alley of bins, bikes and pots, and arrange a plumber for the sink and an electrician if the hob is hard-wired. Managed stock usually comes with its own rules about working hours, waste, and who is allowed on site. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Units kept, surface changed.

Next step

Worktop replacement in Custom House, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489