Newham · E16

Worktop installation in Custom House

Fitting day: protected route, back edges scribed to the real wall line, joins pulled flush, sink and hob sealed.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Induction hob set into an Enzo run below a full-height matching splashback, under the painted mantel canopy

Custom House kitchens

The kitchens we meet in Custom House

There is no single answer to what worktop installation in Custom House costs, and the honest version of that answer starts with the kind of kitchen involved. Older terraces and council houses have small rear kitchens of around 2.2m to 2.6m with a pantry recess and a back door in the run. New replacement blocks have single-wall open-plan kitchens, so the work is either a small traditional refit or a like-for-like swap in a modern flat. We would rather find an out of square wall at survey than on fitting day, so the survey is thorough and unhurried.

A side passage and a back door mean the stone rarely has to come through the house, which changes the job more than most people expect. Protection down, dry-lay, scribe, then bond: the order matters more in a difficult room than an easy one. A settled floor adds an hour and the day allows for it.

An inter-war terrace is wider than a Victorian one and shallower than a semi, so the kitchen is a compact square room rather than a galley. Access is usually the easy part here, as most of these have a side gate and a back door straight into the kitchen, so we carry down the side alley rather than through the house and keep the mess outside. Fixings go into what the wall actually is.

The buildings themselves are mostly interwar terrace, post-war council housing and recent regeneration apartment. The join count is decided by which of those the room sits in.

Mitred waterfall edge detail on a quartz island
  • interwar terrace
  • post-war council housing
  • recent regeneration apartment

True everywhere

Worktop installation, in short

  • One visit. A straightforward run is a morning; an island and splashbacks take most of the day.
  • Floors and units are protected before anything comes through the door.
  • The fit follows a template taken in the same room, not a set of plan measurements.
  • We arrive five to ten working days after the measurements are taken.
Borough
Newham
Postcodes
E16
Covered on
our east London run
Fitted
5–10 working days from template

The place

Why Custom House is its own job

Nothing about fitting stone in Custom House is guesswork on our part, because guesswork with a machined slab is expensive. Ongoing regeneration means hoardings, closed roads and diverted footways that change month to month, so the route needs checking on the day rather than from a map. Where houses survive there is decent kerb space and level front access, which makes those the straightforward jobs. Site hoardings regularly block the road you templated from, so leave a bit of slack in the delivery window for a diverted approach. You see the drawing before we cut, and if we have read the room wrong, that is the moment to say so, not the morning the fitters arrive.

The work

What worktop installation involves

Installation happens three to seven working days after the template, once the pieces exist and have been proved against each other on the bench rather than only on paper. The run is set out from a fixed point, a corner or the wall the sink sits against, and worked outward, so what tolerance the room has ends up at the open end where it can be absorbed. You end up with a five year workmanship guarantee covering how the run was set, joined and sealed, which is the part of a finished kitchen that depends on the fitting rather than the stone.

What arrives is what was templated. There is no cutting to fit on site, because a piece cut to fit is a piece that was measured wrong. Upstands go on after the top is down and settled, so they are scribed to the wall the worktop actually meets. The rear addition and the main run meet at a return that never nests neatly, so that piece is set first and everything else is worked off it. The room is left clean and the offcuts go with us.

Waterfall ends See the options

The money

What it costs in Custom House

Installation is priced from the survey: how many hands, how long, and whether the pieces can reach the room in one go. Two facing runs mean two sets of edges and two scribes in a small span, which is why a compact galley rarely prices as cheaply as its area suggests. Colour and finish account for most of the distance between £110 and £550 per square metre. Everything decided after that is labour, and labour is quoted by the operation. The day is priced from the route, not from the room.

1930s and inter-war semis

What Custom House asks for

The local stock generates worktop replacement, and this sits squarely among it. Every one of those gets the same survey and the same installers.

1930s and inter-war semis

Custom House in the housing figures

Across Custom House, almost no homes fall in the upper council tax bands. Void periods set the date more often than taste does. It decides how many hands the day needs, which is the part people find out late. Protection down before the first piece comes through.

1930s and inter-war semis

The shape of the run

A window at one end and a doorway at the other means one end of the run is lit from behind and the other is interrupted, so the two ends of the same length behave differently. The order the pieces are laid in follows the shape, because a piece set down early can block the one that has to slide past it. Nothing is cut on site if the bench can do it.

Access

Getting stone into a Custom House kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

East London patch

Custom House is covered on our east London run, along with the rest of Newham.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Custom House

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do you actually work in Custom House, or just list it?

Yes. Custom House is on the patch, and the postcodes we work here are E16. It is worked on our east London run, along with the rest of Newham. Underground loading has a height restriction, and a van with an A-frame on it is taller than the driver remembers. The fitting slot is set around it, which is why we ask about it when the date is booked and not before we leave the yard. It is why the arrival time is what it is. Both visits happen in your kitchen, the template and the fit, so there is nothing to visit and nothing to collect.

02

What do the kitchens in Custom House do to worktop installation?

There is usually a shared rear alley, and whether the gate onto it is unlocked decides whether long pieces come in from the back. The fitting itself is slower than the carry: original plaster on the party wall and around the old chimney breast is rarely square to the run, so back scribes get cut on site, and where a return wraps into a breast recess we template that shoulder tight and ease it in. Soft brick takes a different plug to blockwork. A chimney breast left in place splits a wall into two alcoves, and the two are rarely the same width and rarely parallel to each other. On the day it means dry-laying, marking, and cutting the scribe on site before anything is bonded. The notch is eased until it drops, then bonded.

03

Do you have trouble getting long pieces into Custom House kitchens?

Where the van stands level with the front of the house a piece gets handled twice instead of five times, and stone breaks on handling rather than on the road. The fitting day is planned backwards from that point, before anything comes off the van. Nobody sets a worktop down mid-flight to change grip. Where the bay sits some distance from the core, the carry across the car park is the longest leg of the day and gets boarded and lit. We aim for the first slot of the day where parking is tight, because that is when the street is emptiest. The day is built around that window.

04

Is worktop installation common in Custom House?

Yes, one of the three we see most, with worktop replacement ahead of it. Same visit to template, same workshop, same installers on the day. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. The fitting day is scheduled to suit that rather than to suit the diary. A shared house stays occupied while we work in it. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Where the window is fixed there is no second day to fall back on, so the prep list matters more than usual. Fire doors stay shut, so the carry route is longer.

05

What decides the price of a worktop in Custom House?

The two runs are rarely the same length, and the shorter one often carries the sink, which puts the cut-outs in the piece with the least material to spare. On the day that means dry-laying the whole layout first and only then pulling and bonding the joins. A galley is levelled as one plane, both sides together. Material runs £110 to £550 per square metre supply only, and templating, fabrication and fitting each get their own line.

06

What do I need to sort out first?

Alcove pieces get cut oversize on both scribe edges, with the true wall angles carried on the template drawing rather than assumed. Rushing that is what leaves a gap you look at every morning for fifteen years. Two millimetres at the wall is two millimetres you see. Unlock and clear the side gate and back door, and move bins, planters and washing lines out of the alley run. Where a landlord or housing provider is involved there is a specification to meet and a process to follow, and both are settled before a date is offered. A half-day of access is not a fitting day, and it is better to say so at booking than to find out at eleven. Booked with whoever actually holds the keys.

07

When do I pay for a Custom House worktop?

Every run, cut-out, edge, join and groove set is a line, which is what makes it comparable with anyone else’s. Material is quoted supply only and templating, fabrication and fitting sit on their own lines, so it is visible which part is stone and which is labour. Where a breast interrupts a long wall the join can often go there, so it reads as a natural break rather than a line in the middle of a worktop. It adds an hour or two to the day, and that time sits in the schedule rather than being taken out of the finishing. Nothing bears on plasterboard.

08

How much upkeep is a stone worktop?

Granite is porous to varying degrees, so it is sealed when we fit it and topped up over the life of the worktop. Where a top takes wine, oil and lemon most days, the non-porous materials ask least of the household. Marble is the one people underestimate. It is porous, like granite, and wants sealing. The back door frequently opens straight into the kitchen, which is the best carry route in the house and the one people forget to mention. The carry is the easy part; the plaster around the old breast and the packing over a moved floor are not. A floor that falls twenty millimetres is packed out first.

09

Can you fit stone I have already bought for a Custom House kitchen?

Delivery to the workshop has to be arranged and dated, since nothing is nested until it is there. Order is what matters: a slab is templated before it is cut, so an uncut slab is straightforward and one already machined for another kitchen is not. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. One visit, with the sink and hob seated and sealed before we leave. The last trade in inherits every delay before it.

10

Do most Custom House kitchens take upstands or full-height splashbacks?

A full-height piece shows a wall that is out more than an upstand does, over the extra height. It is quoted by area like the worktop, so a long run is a material line rather than a trim. Tiling and stone can meet, but where they meet is decided before the template rather than after. Original quarry-tiled floors sit lower than a later screed, so a run crossing that junction needs the units packed to one level. The side route is boarded where it crosses a soft path or a border, and the gate is measured rather than assumed. The building moved decades ago and the fit allows for it.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Perfect service,the best on this job”
Kleant IstrefiGoogle review
★★★★★
“I recently had my kitchen worktop and splashback done by Karem from Worktop WorX and i am very pleased with the result. From the initial consultation and measurements to the final installation, the whole process was smooth and professional. The attention for details and the quality made the difference and everything was finished to a high standard. I definitely recommend Worktop WorX to anyone looking for reliable and high quality kitchen work”
Alexandru BalintGoogle review
★★★★★
“Really impressed with the quality and finish of these worktops. Great range of materials, precise fabrication, and smooth communication throughout. The whole process was easy and the final result looks fantastic. Highly recommend!”
Nastasia DragoGoogle review

Next step

Worktop installation in Custom House, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.