Newham · E16

Splashbacks and upstands in Custom House

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Open-plan room with a navy feature wall, the Arctic Starburst peninsula and bar stools at the far end beyond the sofa

Custom House kitchens

The kitchens we meet in Custom House

We turn down very few splashback jobs in Custom House, but we do insist on seeing the kitchen first, and the reason for that is in the rooms themselves. Older terraces and council houses have small rear kitchens of around 2.2m to 2.6m with a pantry recess and a back door in the run. New replacement blocks have single-wall open-plan kitchens, so the work is either a small traditional refit or a like-for-like swap in a modern flat. Send a few photographs of the run and we will tell you which of those you are dealing with before we come out to Custom House.

A serving hatch through to the dining room is common, and closing one up leaves a panel of newer wall exactly where the run passes. Socket positions, sill heights and wall flatness are the three things that settle this, and all three are properties of the building. Height off the units, not off the old tiles.

There is usually a shared rear alley, and whether the gate onto it is unlocked decides whether long pieces come in from the back. These kitchens are nearly always retiled at least twice, and stripping the old tiles takes the bottom course of plaster with it because the original laminate top ran underneath the tiles rather than up to them. Solid plaster on brick takes a panel; a hollow wall wants thought.

The stock behind these kitchens runs to interwar terrace, post-war council housing and recent regeneration apartment. Which one you have changes the order of the day more than the design does.

Undermounted sink cut-out in a quartz worktop
  • interwar terrace
  • post-war council housing
  • recent regeneration apartment

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • The same fitters who install the worktop put the stone on the wall.
  • Wall pieces are priced by the square metre like everything else, from £110 upwards.
  • Edges are polished on every side that shows, including the top edge of an upstand.
Borough
Newham
Postcodes
E16
Covered on
our east London run
Fitted
5–10 working days from template

The place

Why Custom House is its own job

When we take on a kitchen in Custom House the first thing we work out is how the stone reaches the room it is going in. Ongoing regeneration means hoardings, closed roads and diverted footways that change month to month, so the route needs checking on the day rather than from a map. Where houses survive there is decent kerb space and level front access, which makes those the straightforward jobs. Site hoardings regularly block the road you templated from, so leave a bit of slack in the delivery window for a diverted approach. The point of the free visit is that we see the Custom House job for ourselves rather than guessing at it from an email.

The work

What worktop splashbacks & upstands involves

Splashbacks and upstands put the same stone on the wall behind your worktop instead of tiles, which takes the grout line out of the kitchen. These are templated after the worktop is fitted and settled, never before, so they scribe to the wall the worktop actually meets. Socket and switch positions need to be final first. You end up with sockets and switches sitting in openings machined for them, which is the difference between a panel made for the wall and one cut to clear whatever was on it.

A full-height sheet must live with everything already on that wall, the extractor and its bracket included, because it is machined to fit round them and cannot be eased afterwards. Every outlet on that wall is recorded at its finished face beforehand, since a machined opening in a sheet of stone has no tolerance to move into. The old larder wall in these houses is a single skin with a bow through it, and a hand's width of stone hides what a tall sheet would advertise. A hand's width, or all of it.

Sink cut-outs See the options

The money

What it costs in Custom House

The wall decides the labour. A bowed wall behind a long run is scribing time, and scribing time is the cost. Two facing runs mean two sets of edges and two scribes in a small span, which is why a compact galley rarely prices as cheaply as its area suggests. A per square metre figure of £110 to £550 describes stone, not a worktop. What turns one into the other is machining and a fitting day, and both are listed as themselves. Priced by the edge and the openings, not the wall.

1930s and inter-war semis

Custom House in the housing figures

In Custom House, the council tax banding sits at the bottom of the London range. Let property is specified for durability and turnaround. A window return or a cooker recess turns one panel into several, and that is a fabrication question. The wall as it is, not as it should have been.

1930s and inter-war semis

What Custom House asks for

The stock here does not generate much of this. What it generates is worktop replacement and worktop installation. The job itself is surveyed, quoted and fitted exactly as it would be anywhere else we work.

1930s and inter-war semis

The shape of the run

Two runs of similar length nest as a pair off one slab, and if one of them grows by a few hundred millimetres the pair stops fitting and the yield changes for both. The panel behind a hob is usually the tallest piece in the kitchen, and its height is set by the extractor above it rather than by the wall cupboards either side. Every internal corner is two pieces, not one.

Access

Getting stone into a Custom House kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

East London patch

Custom House is covered on our east London run, along with the rest of Newham.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Custom House

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Are you set up to work in Custom House, or is it a subcontractor?

Yes. Custom House is on the patch, and the postcodes we work here are E16. It is worked on our east London run, along with the rest of Newham. Where the bay sits some distance from the core, the carry across the car park is the longest leg of the day and gets boarded and lit. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. That is why they are crated the way they are. We come to the kitchen to template and again to fit, so there is nothing to visit and nothing to collect.

02

What do the kitchens in Custom House do to worktop splashbacks & upstands?

The back door frequently opens straight into the kitchen, which is the best carry route in the house and the one people forget to mention. That leaves a ragged band right where the upstand has to sit, which is fine for a 100mm upstand that covers it, but a full-height splashback needs the wall made good first or it will rock on the high spots. A chimney breast breaks the run and the panels follow it. An alcove is commonly wider at the back than at the front, so a piece cut to the opening drops in and then stands off the rear wall. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Nothing gets hidden behind a full-height panel.

03

Do you have trouble getting long pieces into Custom House kitchens?

A loading bay or a red route puts a clock on the unload, so the pieces come off in the order they will be fitted rather than the order they were loaded. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. Joint positions follow from that. The goods lift has its own booking sheet, and a bay slot without a lift slot only gets the stone as far as the lobby. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. Long panels and long carries do not mix.

04

Do you get much worktop splashbacks & upstands work in Custom House?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop replacement and worktop installation. That is a point about the buildings round here, not about the job. The quoting, the cutting and the fitting are identical here to anywhere else we work. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Six kitchens, one socket layout, one panel drawing. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. The annexe gets the same panel as the main run.

05

What decides the price of a worktop in Custom House?

Where the aisle is too tight the usual answer is a reduced-depth top on one side, and a 500mm run is a different cut, a different sink and a different drainer to a 600mm one. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Long walls break where the worktop breaks. The material band is £110 to £550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

06

What do I need to sort out first?

The face of a breast is rarely flat, and a top returning onto it picks up that bow across the last few hundred millimetres of its length. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. The reveal decides where the stone dies. The old tiling must be off and the wall made good and dry before templating, not on fitting day. Managed stock usually comes with its own rules about working hours, waste, and who is allowed on site. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. A second visit needs a second permission.

07

Can a damaged worktop be repaired in place?

The rest of the kitchen still goes in. One damaged piece does not hold up the pieces either side. Every piece is dry-assembled on the bench before it is loaded, so a fabrication mistake is found in the workshop rather than in your kitchen. Floors and units are protected before anything comes through the door. The van gets close to the door and the stone comes off the tail lift onto a trolley, which is about the shortest carry we ever get. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. It decides panel size before anything is cut.

08

Can the sink be undermounted rather than sat on top?

Undermount bowls are cut and polished in the workshop and dry-fitted to the stone on the bench before anything is loaded. Two bowls means two cut-outs and a bridge of stone between them, which decides where the sink can go. Two parallel runs with a walkway between them is the most efficient shape there is on a slab, because both pieces nest as straight lengths with almost no waste. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Upstands follow the return round the corner.

09

Does a stone worktop need sealing?

Granite tells you when the seal wants topping up: water stops beading on the surface and starts darkening it instead. Topping a seal up is a wipe-on job with a cloth. A seal is not waterproofing. It only buys time to wipe a spill up. Original quarry-tiled floors sit lower than a later screed, so a run crossing that junction needs the units packed to one level. The ragged band left when old tiles and laminate come off together is what usually decides upstand over full height. Where the plaster undulates, the shorter piece wins.

10

Do most Custom House kitchens take upstands or full-height splashbacks?

A full-height piece shows a wall that is out more than an upstand does, over the extra height. Both are templated after the worktop is down and settled, because they are cut to the wall itself. An upstand covers the gap where the worktop meets a wall that is not flat, which is its real job. The kitchen sits at the rear with a door to the garden and a window over the sink, so the useful run is broken into two short lengths. Behind a hob the panel runs to the underside of the extractor, and that height is settled on site rather than on the plan. The tile bed comes off before anything is measured.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Really impressed with the quality and finish of these worktops. Great range of materials, precise fabrication, and smooth communication throughout. The whole process was easy and the final result looks fantastic. Highly recommend!”
Nastasia DragoGoogle review
★★★★★
“We installed new kitchen and got the worktop and splash back from them. Their professional work and commitment was wonderful. Quality of work compared to price was way too good. Thank you guys.”
MD Matinur RahmanGoogle review
★★★★★
“I am really happy with my worktop. It is beautiful and the service provided was second to none. I totally recommend.”
Magaly RGoogle review

Next step

Splashbacks and upstands in Custom House, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.