Skip to content

Newham · E16

Splashbacks and upstands in Custom House

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

Custom House kitchens

What the kitchens here are actually like

interwar terracepost-war council housingrecent regeneration apartment

Two runs and a return into a rear extension is the pattern, and the return is the piece that never nests neatly on a slab. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Same slab run, same day, same batch.

Older terraces and council houses have small rear kitchens of around 2.2m to 2.6m with a pantry recess and a back door in the run. New replacement blocks have single-wall open-plan kitchens, so the work is either a small traditional refit or a like-for-like swap in a modern flat.

Where houses survive there is decent kerb space and level front access, which makes those the straightforward jobs. Ongoing regeneration means hoardings, closed roads and diverted footways that change month to month, so the route needs checking on the day rather than from a map. Site hoardings regularly block the road you templated from, so leave a bit of slack in the delivery window for a diverted approach.

The back door frequently opens straight into the kitchen, which is the best carry route in the house and the one people forget to mention. The ragged band left when old tiles and laminate come off together is what usually decides upstand over full height. Decided before fabrication starts.

The stock behind these kitchens runs to interwar terrace, post-war council housing and recent regeneration apartment. They are not interchangeable, and a worktop finds the differences quickly.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered from the Essex patch. Fitted 3–7 working days from template.

1930s and inter-war semis

The shape of the run

A galley puts the sink on one side and the hob on the other, which spreads the cut-outs across two pieces instead of weakening one. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. Corners get their own pieces.

1930s and inter-war semis

What gets asked for here

This is not the local speciality and there is no point saying otherwise: worktop replacement, worktop templating and worktop installation is what the housing here actually asks for. It is quoted, cut and fitted exactly the same way regardless.

Access

Getting stone into a Custom House kitchen

Ongoing regeneration means hoardings, closed roads and diverted footways that change month to month, so the route needs checking on the day rather than from a map. Where houses survive there is decent kerb space and level front access, which makes those the straightforward jobs.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

Essex patch

Custom House is worked from our Essex run, covering Essex & East London.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in Custom House

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you actually work in Custom House, or just list it?

Yes. Custom House is on the patch, and the postcodes we work here are E16. It is run from the Essex side, covering Essex & East London. A dedicated loading bay or service yard is the easiest arrangement in a managed building, provided the slot is booked and someone has the key to the shutter. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. That is why they are crated the way they are. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

What is different about worktop splashbacks & upstands in Custom House?

Original quarry-tiled floors sit lower than a later screed, so a run crossing that junction needs the units packed to one level. That leaves a ragged band right where the upstand has to sit, which is fine for a 100mm upstand that covers it, but a full-height splashback needs the wall made good first or it will rock on the high spots. Decided before fabrication starts. Site hoardings regularly block the road you templated from, so leave a bit of slack in the delivery window for a diverted approach.

Is access a problem in Custom House?

Ongoing regeneration means hoardings, closed roads and diverted footways that change month to month, so the route needs checking on the day rather than from a map. Where houses survive there is decent kerb space and level front access, which makes those the straightforward jobs. Even an easy kerbside carry wants the pavement clear at the tail lift, because a three-metre piece on edge has a swing radius nobody expects until it is swinging. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. It decides panel size before anything is cut. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.

Do you get much worktop splashbacks & upstands work in Custom House?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop replacement, worktop templating and worktop installation. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Sockets final before template. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Siliconed to the worktop, never grouted.

What decides the price of a worktop in Custom House?

Two parallel runs with a walkway between them is the most efficient shape there is on a slab, because both pieces nest as straight lengths with almost no waste. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. The joint to the worktop is siliconed, never grouted. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What do I need to sort out first?

The returns into a breast recess are the tightest scribes in the room, and they are eased in rather than forced. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. Scribed, dubbed out, or set proud. Pick one. The old tiling must be off and the wall made good and dry before templating, not on fitting day. These kitchens tend to be compact and reasonably square, so the fixed template, fabrication and fitting lines are a larger share of the total than the stone is. Splashbacks are cut from the same slab run as the tops, so they have to be decided before fabrication, not after. Decided before fabrication, not after.

Next step

Splashbacks and upstands in Custom House, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7479 194398