
Greenwich · SE9
Worktop templating in Eltham
A digital template plotting the room as it really is, taken once your units are fitted, fixed and level.
- 5.0from 23 Google reviews
- 25-year material · 5-year workmanship
- Fitted 3-7 working days from template
Eltham kitchens
What the kitchens here are actually like
The kitchen normally sits in the back addition or a later side return, which puts the run against the oldest and least straight wall in the building. No stone is ever cut from a plan, which is why the visit happens after the units are in and not before. The room as it is, to the millimetre.
Overwhelmingly 1930s semis, a kitchen of roughly 2.4m by 3m at the back with a garden door and a separate dining room in front. The standard job is a rear or side-return extension that merges the two into one long room with a 3.5m to 4m run and an island.
The classic Eltham job is templating a new extension where the old back wall has come out, get the steel-supported opening measured properly, it is rarely square to the new build.
The addition wall is half a brick thick in places and has usually had a damp course injected and been re-plastered, which leaves it neither flat nor consistent. Victorian party walls and chimney-breast returns bow along their length, so the template plots the real line rather than assuming a straight one - the template picks up points every few hundred millimetres down the back of the run and the drawing carries that curve through to the saw. No stone is ever cut from a plan.
The stock behind these kitchens runs to 1930s semi, Edwardian terrace, postwar infill and 1960s flats. Which of those you have decides most of what follows.
True everywhere
Worktop templating, in short
- Two to three hours on site for a typical kitchen.
- Units must be fitted, fixed and level first. No stone is ever cut from a plan.
- Sink, tap and hob must be physically on site, not just ordered.
- A Belfast or butler sink must be installed and at its final height.
Covered on our south east London run. Fitted 3–7 working days from template.
1930s and inter-war semis
The shape of the run
An island is a single visible piece with four finished edges and no wall to hide against, so it is the piece the whole kitchen is judged on. The template records every angle in that shape as it actually is rather than as the plan drew it. The drawing leaves site complete.
1930s and inter-war semis
Getting stone into the room
Suburban streets with front drives and dropped kerbs on most roads, so the van usually gets within a few metres of the door; the stretches around the High Street and the station are the exception.
1930s and inter-war semis
What gets asked for here
Second or third on the list around here, after worktop installation. Same visit, same bench, same crew, same lead time.
Access
Getting stone into a Eltham kitchen
Suburban streets with front drives and dropped kerbs on most roads, so the van usually gets within a few metres of the door; the stretches around the High Street and the station are the exception.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
south east London patch
Eltham is covered on our south east London run, along with the rest of Greenwich.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop templating in Eltham
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you actually work in Eltham, or just list it?
Yes. Eltham is on the patch, and the postcodes we work here are SE9. It is worked on our south east London run, along with the rest of Greenwich. Off-street parking means the van stays put all day, so tools, packers and the offcut we would rather have than not are all within reach. A templater circling for a space arrives late into a slot that was already tight, and the drawing is what suffers. Two hours is the realistic figure. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
What is different about worktop templating in Eltham?
The addition wall is half a brick thick in places and has usually had a damp course injected and been re-plastered, which leaves it neither flat nor consistent. Victorian party walls and chimney-breast returns bow along their length, so the template plots the real line rather than assuming a straight one - the template picks up points every few hundred millimetres down the back of the run and the drawing carries that curve through to the saw. No stone is ever cut from a plan. The classic Eltham job is templating a new extension where the old back wall has come out, get the steel-supported opening measured properly, it is rarely square to the new build.
Is access a problem in Eltham?
Suburban streets with front drives and dropped kerbs on most roads, so the van usually gets within a few metres of the door; the stretches around the High Street and the station are the exception. Where the van stands level with the front of the house a piece gets handled twice instead of five times, and stone breaks on handling rather than on the road. A template taken without walking the route produces a drawing that cuts beautifully and will not go in. The template records it along with everything else.
Do you do much worktop templating around Eltham?
It is one of the three we do most here, behind worktop installation. Same template visit, same workshop, same installers either way. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Two to three hours on site, with the sink, tap and hob physically present. The room as it is, not as it was drawn.
What decides the price of a worktop in Eltham?
An island is a single visible piece with four finished edges and no wall to hide against, so it is the piece the whole kitchen is judged on. A layout templated off one wall instead of one datum will not sit right once all the pieces are down together. One datum for the whole room. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What do I need to sort out first?
Where a column lands in the run the template plots its actual outline so the stone is cut to fit around it rather than stopped short and filled. The template plots it as it is, at the exact height the worktop will sit, and the drawing carries that through. Measured at worktop height, nowhere else. Units fixed and packed level over the sloping floor, walls replastered and dry at their final thickness (tiling and splashbacks go on after the worktop, never before), and the sink, tap and hob physically on site, with a Belfast sink built in and set at its finished height. Mixed ownership means the decision-maker is not always the person who lets us in, so it is worth being clear early about who signs the quote off. The templater needs the sink, tap and hob on site, and a Belfast sink installed at its final height. No stone is cut from a plan.
Related
More around Eltham
Other work we do in Eltham
Next step
Worktop templating in Eltham, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.