
Islington · EC1
Splashbacks and upstands in Farringdon
Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.
- 5.0from 23 Google reviews
- 25-year material · 5-year workmanship
- Fitted 3-7 working days from template
Farringdon kitchens
What the kitchens here are actually like
Exposed brick and steel is the whole job here, because neither of them presents a flat plane to scribe to. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. The wall decides, not the brochure.
Mostly commercial-to-residential conversions with open-plan layouts and the kitchen wall integrated into the living space, so one long run, a freestanding island and appliances stacked into tall units.
Ceiling heights are generous, which is why full-height stone splashbacks get specified here more than almost anywhere in the three boroughs. Service lifts are common and worth confirming in writing before anything is cut. Congestion Charge zone, heavy weekday traffic, and buildings that open straight onto the pavement with no lay-by, so loading is a booked bay or an early slot. These are fabrication jobs more than fitting jobs, with long single pieces, mitred edges and matched veining, so slab selection and layout deserve the time up front.
Poured screed over steel decking can fall away across a long run, so level is checked across the whole room before anything is packed. Exposed brick is the defining issue: the face is uneven by 10mm or more across a bay, so a stone splashback either scribes to it, which means the back of the panel has to be relieved, or it is deliberately set proud on a subframe with a shadow reveal all round. The wall makes that decision, not the brochure.
The mix here is warehouse and office conversion, live-work unit, modern apartment and Georgian remnant. They are not interchangeable, and a worktop finds the differences quickly.
True everywhere
Splashbacks and upstands, in short
- Cut from the same slab run as the worktop, at the same time.
- Ordered later, from a different batch, the match is not reliable where the pieces meet.
- Socket and switch positions must be final before templating.
- The joint to the worktop is siliconed, never grouted.
Covered on our north London run. Fitted 3–7 working days from template.
warehouse and wharf conversions
Getting stone into the room
The lift has to be booked and blanketed before anything moves, and that booking needs to cover the old tops coming out as well as the new stone going in. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. It decides panel size before anything is cut.
warehouse and wharf conversions
What gets asked for here
Honestly, this is not what we do most on this patch. Worktop fabrication, worktop design & quotation and worktop installation come up more often. That is a statement about the local housing rather than about the work, and nothing about how it is quoted, cut or fitted changes because of it.
Access
Getting stone into a Farringdon kitchen
Congestion Charge zone, heavy weekday traffic, and buildings that open straight onto the pavement with no lay-by, so loading is a booked bay or an early slot. Service lifts are common and worth confirming in writing before anything is cut.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
north London patch
Farringdon is covered on our north London run, along with the rest of Islington.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop splashbacks & upstands in Farringdon
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you cover Farringdon?
Yes. Farringdon is on the patch, and the postcodes we work here are EC1. It is worked on our north London run, along with the rest of Islington. Where the bay sits some distance from the core, the carry across the car park is the longest leg of the day and gets boarded and lit. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. Handling is where these pieces get damaged. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
Does the housing in Farringdon change how worktop splashbacks & upstands works?
Poured screed over steel decking can fall away across a long run, so level is checked across the whole room before anything is packed. Exposed brick is the defining issue: the face is uneven by 10mm or more across a bay, so a stone splashback either scribes to it, which means the back of the panel has to be relieved, or it is deliberately set proud on a subframe with a shadow reveal all round. The wall makes that decision, not the brochure. These are fabrication jobs more than fitting jobs, with long single pieces, mitred edges and matched veining, so slab selection and layout deserve the time up front.
How does the stone actually reach a kitchen in Farringdon?
Congestion Charge zone, heavy weekday traffic, and buildings that open straight onto the pavement with no lay-by, so loading is a booked bay or an early slot. Service lifts are common and worth confirming in writing before anything is cut. Where the lift will not take the longest run we design a join in rather than gamble, because a piece that will not go up has to go back on the van. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. It decides panel size before anything is cut.
Do you get much worktop splashbacks & upstands work in Farringdon?
Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop fabrication, worktop design & quotation and worktop installation. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Same batch, same run, same day. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Siliconed to the worktop, never grouted.
Why do two Farringdon kitchens the same size price differently?
An island is a single visible piece with four finished edges and no wall to hide against, so it is the piece the whole kitchen is judged on. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Joint placement is a decision, not an accident. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What has to be finished before you can template?
Exposed structure means the back edge is not a straight line at all, and a scribe of fifteen or twenty millimetres across a run is normal. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. Make the wall good first, or accept the detail. Decide and build the backing method, scribe, subframe or board, before the template, because the templater is measuring to that face and not to the brick. A let property is specified for durability and for a fixed window, and both of those are legitimate reasons to choose differently. Splashbacks are cut from the same slab run as the tops, so they have to be decided before fabrication, not after. The wall has to be ready.
Related
More around Farringdon
Other work we do in Farringdon
Next step
Splashbacks and upstands in Farringdon, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.