
Islington · EC1V
Splashbacks and upstands in St Luke's
Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.
- 5.0from 23 Google reviews
- 25-year material · 5-year workmanship
- Fitted 3-7 working days from template
St Luke's kitchens
What the kitchens here are actually like
Thick external walls, deep window reveals and boxed risers mean the runs are templated to what is there rather than to a rectangle. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. The wall decides, not the brochure.
The older blocks have solid walls, boxed stacks and no scope to extend in any direction.
Old Street and City Road are red routes, and the estates have courtyards with bollards and narrow arched entries built for handcarts rather than vans. A lot of interwar and Victorian model-dwelling flats with small fixed kitchens of about 2.4m and a single window, sitting alongside newer towers with open-plan runs.
The original kitchen was a small service room, so what is there now is a knock-through and the junction between the two floors is rarely level. Boxed risers break the run into returns, and every return is a separate piece with its own mitred corner. Decided before fabrication starts.
The mix here is 1930s municipal block, Victorian model-dwelling block, warehouse conversion and modern tower. Which of those you have decides most of what follows.
True everywhere
Splashbacks and upstands, in short
- Cut from the same slab run as the worktop, at the same time.
- Ordered later, from a different batch, the match is not reliable where the pieces meet.
- Socket and switch positions must be final before templating.
- The joint to the worktop is siliconed, never grouted.
Covered on our north London run. Fitted 3–7 working days from template.
1930s and inter-war semis
The building, and what it does to the job
Stone stairs and iron rails mean corner protection on every turn, since a chipped edge on the way up is the most common loss on these blocks.
Boxing is rarely the same depth at worktop height as it is at floor level, so measuring it low down is the usual reason a top will not sit back. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. An upstand rides what a panel exposes.
1930s and inter-war semis
Getting stone into the room
The older blocks are walk-ups with stone stairs and iron balustrades that do not forgive a swung slab.
1930s and inter-war semis
What gets asked for here
It is on the shortlist for this patch rather than at the top of it, because worktop replacement comes up more often. Nothing about the process differs between the two.
Access
Getting stone into a St Luke's kitchen
Old Street and City Road are red routes, and the estates have courtyards with bollards and narrow arched entries built for handcarts rather than vans. The older blocks are walk-ups with stone stairs and iron balustrades that do not forgive a swung slab.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
north London patch
St Luke's is covered on our north London run, along with the rest of Islington.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop splashbacks & upstands in St Luke's
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Is St Luke's on your patch?
Yes. St Luke's is on the patch, and the postcodes we work here are EC1V. It is worked on our north London run, along with the rest of Islington. Where the frontage is a clearway the unload happens away from the door and the carry gets longer, which is a crew and time question rather than a stone one. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. One trip is always better than three. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
Why would worktop splashbacks & upstands in St Luke's be any different from anywhere else?
Balcony access and long communal corridors are often the carry route, and both are narrower than they look with a piece on edge. Each return needs its own piece with a mitred or butted external corner, and those pieces should come off the same slab so the movement lines up across the corner. The wall makes that decision, not the brochure. Stone stairs and iron rails mean corner protection on every turn, since a chipped edge on the way up is the most common loss on these blocks.
How would you get a worktop into a property in St Luke's?
Old Street and City Road are red routes, and the estates have courtyards with bollards and narrow arched entries built for handcarts rather than vans. The older blocks are walk-ups with stone stairs and iron balustrades that do not forgive a swung slab. Stone goes up on edge, and it is the half-landing turn rather than the flight itself that sets the maximum piece. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. Joint positions follow from that.
Do you do much worktop splashbacks & upstands around St Luke's?
It is one of the three we do most here, behind worktop replacement. Same template visit, same workshop, same installers either way. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Sockets final before template. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Siliconed to the worktop, never grouted.
What moves the number on a quote around here?
Galley runs are usually short enough to come out of a single slab, so the material band you choose does more to the total than the room shape does. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Joint placement is a decision, not an accident. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What needs to be ready before you come to St Luke's?
Boxing is rarely the same depth at worktop height as it is at floor level, so measuring it low down is the usual reason a top will not sit back. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. An upstand rides what a panel exposes. The riser boxing must be finished in its final form and any access panel positions agreed before the template, since the stone is set out around them. Where ownership is split across a building, the common parts belong to someone else and the carry route is negotiated rather than assumed. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Decided before fabrication, not after.
Related
More around St Luke's
Other work we do in St Luke's
Next step
Splashbacks and upstands in St Luke's, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.