Islington · EC1V

Kitchen worktops in St Luke's

A lot of interwar and Victorian model-dwelling flats with small fixed kitchens of about 2.4m and a single window, sitting alongside newer towers with open-plan runs. The older blocks have solid walls, boxed stacks and no scope to extend in any direction.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

The housing stock

What we are usually working with in St Luke's

This is a logistics job before it is a stone job, and the lift car is usually the single biggest constraint on the design. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Same slab run, same day, same batch.

Old Street and City Road are red routes, and the estates have courtyards with bollards and narrow arched entries built for handcarts rather than vans.

Balcony access and long communal corridors are often the carry route, and both are narrower than they look with a piece on edge. Where the stair is the route, each piece is walked up on edge with a hand at every half-landing turn. The age of the house sets the pace of it.

What we are usually templating in is 1930s municipal block, Victorian model-dwelling block, warehouse conversion and modern tower. The differences between them show up at template, not at enquiry.

Access. The older blocks are walk-ups with stone stairs and iron balustrades that do not forgive a swung slab.

There is nothing to visit in St Luke's. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.

Borough
Islington
Postcodes
EC1V
Covered on
our north London run
Lead time
5–10 working days from template

Get a fixed quote Free samples

  • 1930s municipal block
  • Victorian model-dwelling block
  • warehouse conversion
  • modern tower

Islington

St Luke's in the housing figures

In St Luke's, the great majority of homes sit in blocks rather than on their own plot. A tall panel has to be carried on edge and cannot be tilted to clear a turn, so it is usually the splashback that will not go in, not the top. Cut around the electrics as they are, not as drawn.

The building, and what it does to the job

The flats are stacked identically, so the kitchen above sits directly over this one and its waste passes through the same boxing. Where the plaster is old and soft, the panel is bonded to the sound surface behind it rather than to the skim. Dry lining behind a panel needs a fixing plan of its own.

Stone stairs and iron rails mean corner protection on every turn, since a chipped edge on the way up is the most common loss on these blocks.

Getting stone into the room

The van is not staying on a main road for the day, so once the stone is off it goes and parks properly somewhere else. Where the van cannot stay, everything the fit needs goes into the house before it has to move. A drive and a red route make two different fitting days.

Waterfall ends See the options

Nearby

We also work around St Luke's

St Luke's is one of 19 places we cover in Islington. Everything in Islington

The whole Watford patch

Questions

Working in St Luke's

01

Do you come out to St Luke's for a worktop?

Yes. A lot of interwar and Victorian model-dwelling flats with small fixed kitchens of about 2.4m and a single window, sitting alongside newer towers with open-plan runs. The older blocks have solid walls, boxed stacks and no scope to extend in any direction. A red route means no stopping, and no stopping means exactly that, so the stone comes in from a side street or from a bay behind the property. The fitting slot is set around it, which is why we ask about it when the date is booked and not before we leave the yard. The first hand off the van is the one holding the clock.

02

What kind of kitchens do you usually work on in St Luke's?

1930s municipal block, Victorian model-dwelling block, warehouse conversion and modern tower. There is usually a rounded internal corner where the plan turns, and stone does not follow a curve without being cut to it. This is the most managed day we do. Walked, measured, protected, then lifted.

03

How hard is it to get stone into a St Luke's kitchen?

Old Street and City Road are red routes, and the estates have courtyards with bollards and narrow arched entries built for handcarts rather than vans. The older blocks are walk-ups with stone stairs and iron balustrades that do not forgive a swung slab. A walk-up with winders at every half-landing means the piece is rested and re-gripped on the way, so the crew size goes up before the piece size comes down. The fitting day is planned backwards from that point, before anything comes off the van. Protection goes down along it first.

04

What do St Luke's customers usually want done?

Worktop replacement, worktop splashbacks & upstands and worktop installation, in that order. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. The fitting day is scheduled to suit that rather than to suit the diary. Lease hours decide when the noisy part happens. Stone stairs and iron rails mean corner protection on every turn, since a chipped edge on the way up is the most common loss on these blocks.

05

What makes one St Luke's kitchen cost more than another?

The two runs are read against each other rather than against the floor, so they are set to one datum taken across the aisle instead of measured up from the boards. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Corners get their own pieces. Boxing is rarely the same depth at worktop height as it is at floor level, so measuring it low down is the usual reason a top will not sit back. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. Packing the carcasses is part of the replacement. Expect material from £110 per square metre supply only, with templating, fabrication and fitting itemised on their own lines rather than folded into one figure.

06

Are St Luke's flats a problem for you?

One owner can take a date next week while the flat below needs three weeks of notice, so several kitchens in one building end up scheduled by the slowest permission. The fitting day is arranged with whoever can actually give us access for the whole slot. Emptying the room belongs to the keyholder, not the crew. Mention the building when you book. The lift, the stair turn and any freeholder notice then go into the plan instead of turning up on the day.

07

What is the order of events on a St Luke's kitchen?

The template is taken in your kitchen after the units are in and fixed, never before. If the units run late the template moves, not the fit: the gap between them is fabrication. On the fitting day floors and door frames are protected, joins clamped flush, sink and hob sealed. Thick external walls, deep window reveals and boxed risers mean the runs are templated to what is there rather than to a rectangle. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. The wall decides, not the brochure.

08

Is taking the old top off part of the job?

If you want the old top kept for a garage or a utility, say so and it stays on site. On a replacement the old top comes off in the morning and the new stone is down and sealed the same day. The template can be taken with the old top still down, which is why one visit covers both. Where the frontage is a clearway the unload happens away from the door and the carry gets longer, which is a crew and time question rather than a stone one. A van that has to move mid-fit costs the best part of an hour and takes a man off the tools to do it. It is why the arrival time is what it is.

09

How many joins will a St Luke's kitchen need?

There are only ever a few legal positions, and the one taken is furthest from the light. What you get is a line rather than a step, because the pieces are levelled to each other first. A finished join is typically two to three millimetres, colour-matched and sanded flush. A galley that is also the route to the back door is a corridor first and a kitchen second, and what the shape can take is set by the traffic going through it. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. The run decides where that joint falls.

10

What if a worktop will not physically fit through the building?

If a piece cannot be got in at all, we say so at the template rather than on the day. The alternative to a join is a shorter run, which is usually the wrong thing to trade away. Communal stairs get boarded and the handrail padded, and we walk the route with a tape before the first piece leaves the van. We walk the route with a tape and protect it end to end before the first piece is lifted. Every piece is staged to it before fitting starts.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“I used Karem’s services 5 years ago for purchasing and fitting the quartz worktop in my then brand new kitchen. The price was reasonable and the service reliable and spot on, no delays in fitting, misunderstanding or excuses. I recommended him to a friend, who also used his services and they were happy too! If I need to order new kitchen work top again, I would definitely use him again. Thanks Karem!”
shoshencenceGoogle review · quartz
★★★★★
“Karem did an excellent job on my kitchen. He was professional, reliable, and paid great attention to detail. The finish looks amazing and has completely transformed my kitchen. Thank you! Would highly recommend his work!”
Catalina RaduGoogle review
★★★★★
“Excellent work and highly recommend. Very professional and did an outstanding job with my worktop. Karem responded very quickly and swiftly, top guy!”
Faisal KGoogle review

Next step

Get your St Luke's kitchen priced

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.