Skip to content

City of London · EC2M

Worktop templating in Liverpool Street

A digital template plotting the room as it really is, taken once your units are fitted, fixed and level.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

Liverpool Street kitchens

What the kitchens here are actually like

Victorian commercial building converted to flatsmodern apartment above retailnarrow court and alley buildingmixed-use scheme near the station

Thick external walls, deep window reveals and boxed risers mean the runs are templated to what is there rather than to a rectangle. Two to three hours on site, once the units are fitted, fixed and level. The room as it is, to the millimetre.

Residential units are mostly upper-floor conversions in narrow-fronted commercial buildings, so kitchens are long and thin - a 3m single run along one wall with no facing return, and appliances stacked rather than spread. Ceiling heights are generous but the plan is tight, which is why full-height stone behind the run is more common here than wall cupboards.

Station-side streets carry very heavy pedestrian flow all day and several approach lanes are pedestrianised or too narrow for a Luton, so the van stops further out than you would like.

External walls are thick and the run under the window sits in a deep reveal that has to be templated rather than assumed square. Mansion-block kitchens usually have a serviced riser or boxed pipework somewhere in the run, and the boxing is rarely the same depth from one end to the other, so the template takes the depth at worktop height at several points rather than one reading. Recorded as it is, not as it was drawn.

What we are usually templating in is Victorian commercial building converted to flats, modern apartment above retail, narrow court and alley building and mixed-use scheme near the station. Each of those behaves differently once the old top comes off.

True everywhere

Worktop templating, in short

  • Two to three hours on site for a typical kitchen.
  • Units must be fitted, fixed and level first. No stone is ever cut from a plan.
  • Sink, tap and hob must be physically on site, not just ordered.
  • A Belfast or butler sink must be installed and at its final height.

Covered on our the City run. Fitted 3–7 working days from template.

Victorian and Edwardian terraces

What gets asked for here

Second or third on the list around here, after worktop replacement. Same visit, same bench, same crew, same lead time.

Victorian and Edwardian terraces

The building, and what it does to the job

Long thin kitchens in narrow buildings mean the run is easy and the stair is not - build the joints around the landing pivot, not the wall length.

Victorian and Edwardian terraces

Getting stone into the room

Entrances are frequently a single door in a narrow court with a straight steep stair and no lift, which caps piece length hard at what two people can pivot on a landing.

Victorian and Edwardian terraces

The shape of the run

Two parallel runs with a walkway between them is the most efficient shape there is on a slab, because both pieces nest as straight lengths with almost no waste. Join positions and vein direction are marked on the template drawing before it leaves site. The drawing leaves site complete.

Access

Getting stone into a Liverpool Street kitchen

Station-side streets carry very heavy pedestrian flow all day and several approach lanes are pedestrianised or too narrow for a Luton, so the van stops further out than you would like. Entrances are frequently a single door in a narrow court with a straight steep stair and no lift, which caps piece length hard at what two people can pivot on a landing.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

the City patch

Liverpool Street is covered on our the City run, along with the rest of the Square Mile.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop templating in Liverpool Street

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you cover Liverpool Street?

Yes. Liverpool Street is on the patch, and the postcodes we work here are EC2M. It is worked on our the City run, along with the rest of the Square Mile. Where the frontage is a clearway the unload happens away from the door and the carry gets longer, which is a crew and time question rather than a stone one. It is noted on the job sheet at template so the fitting crew inherit the answer rather than rediscovering it. Two hours is the realistic figure. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Does the housing in Liverpool Street change how worktop templating works?

External walls are thick and the run under the window sits in a deep reveal that has to be templated rather than assumed square. Mansion-block kitchens usually have a serviced riser or boxed pipework somewhere in the run, and the boxing is rarely the same depth from one end to the other, so the template takes the depth at worktop height at several points rather than one reading. Recorded as it is, not as it was drawn. Long thin kitchens in narrow buildings mean the run is easy and the stair is not - build the joints around the landing pivot, not the wall length.

How does the stone actually reach a kitchen in Liverpool Street?

Station-side streets carry very heavy pedestrian flow all day and several approach lanes are pedestrianised or too narrow for a Luton, so the van stops further out than you would like. Entrances are frequently a single door in a narrow court with a straight steep stair and no lift, which caps piece length hard at what two people can pivot on a landing. A walk-up with winders at every half-landing means the piece is rested and re-gripped on the way, so the crew size goes up before the piece size comes down. A template taken without walking the route produces a drawing that cuts beautifully and will not go in. It goes on the drawing with the run dimensions.

Is worktop templating common in Liverpool Street?

It is one of the three we do most here, behind worktop replacement. Same template visit, same workshop, same installers either way. Conversions put kitchens where the services could be made to reach rather than where they belong, so runs are short and interrupted. The template visit is booked once the units are genuinely in, not when they are nearly in. Units fitted, fixed and level first. In a converted house the flat entrance and the internal doorway are usually tighter than the communal stairs, and that is easy to overlook. No stone is ever cut from a plan, which is inconvenient exactly when a programme is tight. The room as it is, not as it was drawn.

Why do two Liverpool Street kitchens the same size price differently?

The catch with a galley is that both runs are seen end-on from the doorway, so any difference in overhang between the two reads immediately. The template records every angle in that shape as it actually is rather than as the plan drew it. One datum for the whole room. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What has to be finished before you can template?

Boxing is rarely the same depth at worktop height as it is at floor level, so measuring it low down is the usual reason a top will not sit back. One measurement never describes it, which is why a tape reading taken before the visit rarely matches the template. Plotted, not estimated. Boxing and riser casings built, cased and finished to their final surface, units fixed and levelled, and building access, lift booking and porter arrangements agreed so both the template visit and the later fit can run. Where ownership is split across a building, the common parts belong to someone else and the carry route is negotiated rather than assumed. The templater needs the sink, tap and hob on site, and a Belfast sink installed at its final height. No stone is cut from a plan.

Next step

Worktop templating in Liverpool Street, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489