
Bexley · DA15
Splashbacks and upstands in Longlands
Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.
- 5.0from 23 Google reviews
- 25-year material · 5-year workmanship
- Fitted 3-7 working days from template
Longlands kitchens
What the kitchens here are actually like
Two runs and a return into a rear extension is the pattern, and the return is the piece that never nests neatly on a slab. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. The wall decides, not the brochure.
Semis and chalet bungalows on the slope down to the Cray valley. Bungalow kitchens are square with low ceilings and sills close to the worktop, while the semis follow the usual rear-kitchen-plus-dining-room plan.
Sloping residential roads with drives on most houses, though a few streets narrow sharply toward the railway with little turning space for a long van.
Where the roof has been converted there is usually a steel over the kitchen that went in after the walls, and the run beneath it is worth checking for square. The ragged band left when old tiles and laminate come off together is what usually decides upstand over full height. The wall makes that decision, not the brochure.
The stock behind these kitchens runs to 1930s semi, interwar chalet bungalow and postwar terrace. A quote that ignores which one you have is guessing.
True everywhere
Splashbacks and upstands, in short
- Cut from the same slab run as the worktop, at the same time.
- Ordered later, from a different batch, the match is not reliable where the pieces meet.
- Socket and switch positions must be final before templating.
- The joint to the worktop is siliconed, never grouted.
Covered on our south east London run. Fitted 3–7 working days from template.
1930s and inter-war semis
Getting stone into the room
A drive that shelves towards the house needs the van chocked and the trolley controlled, since a loaded A-frame gathers speed quickly on a slope. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. That is why they are crated the way they are.
1930s and inter-war semis
The building, and what it does to the job
Low window sills in the bungalows kill a standard 100mm upstand, so measure sill height at template stage.
1930s and inter-war semis
What gets asked for here
The research on this patch does not put this among the three commonest jobs. Worktop replacement, worktop installation and worktop templating do. That changes how often we are here, not how the work is done.
1930s and inter-war semis
True everywhere, stated once
What decides between a slim upstand and a full-height splashback is nearly always the wall: what it is made of, how flat it is, and where the sockets ended up.
Access
Getting stone into a Longlands kitchen
Sloping residential roads with drives on most houses, though a few streets narrow sharply toward the railway with little turning space for a long van.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
south east London patch
Longlands is covered on our south east London run, along with the rest of Bexley.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop splashbacks & upstands in Longlands
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you actually work in Longlands, or just list it?
Yes. Longlands is on the patch, and the postcodes we work here are DA15. It is worked on our south east London run, along with the rest of Bexley. A drive that shelves towards the house needs the van chocked and the trolley controlled, since a loaded A-frame gathers speed quickly on a slope. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. That is why they are crated the way they are. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
What is different about worktop splashbacks & upstands in Longlands?
Everything on one level means no stairs, no landings and no turns, which is about the easiest carry there is in domestic work. These kitchens are nearly always retiled at least twice, and stripping the old tiles takes the bottom course of plaster with it because the original laminate top ran underneath the tiles rather than up to them. Cut from the same slab run as the tops. Low window sills in the bungalows kill a standard 100mm upstand, so measure sill height at template stage.
Is access a problem in Longlands?
Sloping residential roads with drives on most houses, though a few streets narrow sharply toward the railway with little turning space for a long van. The van gets close to the door and the stone comes off the tail lift onto a trolley, which is about the shortest carry we ever get. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. It decides panel size before anything is cut.
Do you get much worktop splashbacks & upstands work in Longlands?
Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop replacement, worktop installation and worktop templating. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Same batch, same run, same day. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Sockets final before template.
What decides the price of a worktop in Longlands?
Two parallel runs with a walkway between them is the most efficient shape there is on a slab, because both pieces nest as straight lengths with almost no waste. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Corners get their own pieces. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What do I need to sort out first?
Sill height gets settled with the template on site, because it is one of the few dimensions nobody has measured before we arrive. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. Scribed, dubbed out, or set proud. Pick one. The old tiling must be off and the wall made good and dry before templating, not on fitting day. Owner-occupied kitchens are usually being done once, which is why the edge profile, the vein direction and where a join falls are worth the conversation. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Decided before fabrication, not after.
Related
More around Longlands
Other work we do in Longlands
Next step
Splashbacks and upstands in Longlands, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.