Skip to content

Kensington and Chelsea · W11

Splashbacks and upstands in Notting Hill

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

Notting Hill kitchens

What the kitchens here are actually like

1840s-1860s stucco-fronted townhousecommunal garden square terraceVictorian coach-house mewsEdwardian mansion flat

Nothing in a house of this age is square, and the kitchen is usually the part that has been altered most often. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. Siliconed to the top, never grouted.

The Ladbroke Estate houses put the kitchen on the lower ground floor at the back, usually knocked through into a rear extension that runs out under the communal garden wall, so you get a 3.2-4m wall run plus an island of 2.4m or more. Mews conversions behind the main terraces are the opposite job entirely: a single galley run of 2.6-3.2m against one wall with a hob undercut and no room for a return.

Measure the turn at the foot of the area steps before you cut anything, because a 3m piece that clears the stair will still refuse the 90-degree swing at the bottom. Almost the whole area is conservation area with single yellow and RBKC residents' bays, so a slab van gets a loading window rather than a parking space.

These were built with a scullery that has since been swallowed by an extension, leaving a change of floor level roughly where the run crosses. Where a client wants a full-height piece behind the hob, it usually sits in the old chimney recess, and that recess is rarely square top to bottom or side to side, so it has to be templated as a trapezium rather than a rectangle. The wall makes that decision, not the brochure.

What we are usually templating in is 1840s-1860s stucco-fronted townhouse, communal garden square terrace, Victorian coach-house mews and Edwardian mansion flat. The differences between them show up at template, not at enquiry.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered on our west London run. Fitted 3–7 working days from template.

Victorian and Edwardian terraces

Getting stone into the room

Most houses are entered either up a raised front step or down external area steps into the lightwell, and that bottom landing is where slabs get stuck - it is often under 900mm deep with a right-angle turn straight into the kitchen door.

Victorian and Edwardian terraces

What gets asked for here

The research on this patch does not put this among the three commonest jobs. Worktop templating, worktop fabrication and worktop installation do. That changes how often we are here, not how the work is done.

Victorian and Edwardian terraces

The building, and what it does to the job

Level has to hold across the whole room rather than along one wall, or a floor that falls end to end shows as a step where two pieces meet. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. Scribed, dubbed out, or set proud. Pick one.

Access

Getting stone into a Notting Hill kitchen

Almost the whole area is conservation area with single yellow and RBKC residents' bays, so a slab van gets a loading window rather than a parking space. Most houses are entered either up a raised front step or down external area steps into the lightwell, and that bottom landing is where slabs get stuck - it is often under 900mm deep with a right-angle turn straight into the kitchen door.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

west London patch

Notting Hill is covered on our west London run, along with the rest of Kensington and Chelsea.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in Notting Hill

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Is Notting Hill on your patch?

Yes. Notting Hill is on the patch, and the postcodes we work here are W11. It is worked on our west London run, along with the rest of Kensington and Chelsea. Underground loading has a height restriction, and a van with an A-frame on it is taller than the driver remembers. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. Handling is where these pieces get damaged. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Why would worktop splashbacks & upstands in Notting Hill be any different from anywhere else?

These were built with a scullery that has since been swallowed by an extension, leaving a change of floor level roughly where the run crosses. Where a client wants a full-height piece behind the hob, it usually sits in the old chimney recess, and that recess is rarely square top to bottom or side to side, so it has to be templated as a trapezium rather than a rectangle. Decided before fabrication starts. Measure the turn at the foot of the area steps before you cut anything, because a 3m piece that clears the stair will still refuse the 90-degree swing at the bottom.

How would you get a worktop into a property in Notting Hill?

Almost the whole area is conservation area with single yellow and RBKC residents' bays, so a slab van gets a loading window rather than a parking space. Most houses are entered either up a raised front step or down external area steps into the lightwell, and that bottom landing is where slabs get stuck - it is often under 900mm deep with a right-angle turn straight into the kitchen door. Carrying through the house means protecting the whole route first: floor boarded, banister padded, and the front door held open on a wedge rather than by hand. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. Joint positions follow from that.

Is Notting Hill really a worktop splashbacks & upstands area?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop templating, worktop fabrication and worktop installation. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Same batch, same run, same day. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Siliconed to the worktop, never grouted.

What moves the number on a quote around here?

A galley puts the sink on one side and the hob on the other, which spreads the cut-outs across two pieces instead of weakening one. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Joint placement is a decision, not an accident. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What needs to be ready before you come to Notting Hill?

Floors settle, and once base units are packed and levelled properly the stone sits true while everything else in the room admits it is not. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. An upstand rides what a panel exposes. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. Mixed ownership means the decision-maker is not always the person who lets us in, so it is worth being clear early about who signs the quote off. Full-height panels need the wall made good first, which is another trade and another timescale. Decided before fabrication, not after.

Next step

Splashbacks and upstands in Notting Hill, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489