Skip to content

Ealing · W5

Splashbacks and upstands in Pitshanger

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

Pitshanger kitchens

What the kitchens here are actually like

1930s semiinterwar detachedEdwardian house near the lanepostwar infill

Solid brick with a sand and cement render is firm to work against and reliably out of plumb across the length of a run. Socket positions, sill heights and wall flatness are the three things that settle this, and all three are properties of the building. Siliconed to the top, never grouted.

1930s semis with the kitchen alongside the garage, extended back into a family room.

Larder and pantry shelving in matching stone gets asked for here, so cut it from the offcut at the same template rather than reordering later. The usual upgrade is an island with breakfast seating plus a walk-in larder with its own shelving. The golf course and the River Brent cut off through routes, so it is one way in and back out. The Pitshanger Lane parade has limited bays but the residential roads have drives.

The kitchen is usually a rear room extended into the garden, with the original external wall now standing inside the run. That leaves a ragged band right where the upstand has to sit, which is fine for a 100mm upstand that covers it, but a full-height splashback needs the wall made good first or it will rock on the high spots. Decided before fabrication starts.

What we are usually templating in is 1930s semi, interwar detached, Edwardian house near the lane and postwar infill. That mix is why two jobs on the same road can run completely differently.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered on our west London run. Fitted 3–7 working days from template.

1930s and inter-war semis

Getting stone into the room

A drive that shelves towards the house needs the van chocked and the trolley controlled, since a loaded A-frame gathers speed quickly on a slope. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. That is why they are crated the way they are.

1930s and inter-war semis

What gets asked for here

Honestly, this is not what we do most on this patch. Worktop design & quotation, worktop installation and worktop fabrication come up more often. That is a statement about the local housing rather than about the work, and nothing about how it is quoted, cut or fitted changes because of it.

Access

Getting stone into a Pitshanger kitchen

The Pitshanger Lane parade has limited bays but the residential roads have drives. The golf course and the River Brent cut off through routes, so it is one way in and back out.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

west London patch

Pitshanger is covered on our west London run, along with the rest of Ealing.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in Pitshanger

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you actually work in Pitshanger, or just list it?

Yes. Pitshanger is on the patch, and the postcodes we work here are W5. It is worked on our west London run, along with the rest of Ealing. A drive that shelves towards the house needs the van chocked and the trolley controlled, since a loaded A-frame gathers speed quickly on a slope. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. That is why they are crated the way they are. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

What is different about worktop splashbacks & upstands in Pitshanger?

The kitchen is usually a rear room extended into the garden, with the original external wall now standing inside the run. That leaves a ragged band right where the upstand has to sit, which is fine for a 100mm upstand that covers it, but a full-height splashback needs the wall made good first or it will rock on the high spots. Decided before fabrication starts. Larder and pantry shelving in matching stone gets asked for here, so cut it from the offcut at the same template rather than reordering later.

Is access a problem in Pitshanger?

The Pitshanger Lane parade has limited bays but the residential roads have drives. The golf course and the River Brent cut off through routes, so it is one way in and back out. A short hard approach with no steps means a full-length piece can be walked in flat by two people rather than turned up on edge. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. Joint positions follow from that.

Is Pitshanger really a worktop splashbacks & upstands area?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop design & quotation, worktop installation and worktop fabrication. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Sockets final before template. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Siliconed to the worktop, never grouted.

What decides the price of a worktop in Pitshanger?

Seating overhangs past roughly 300mm will not carry on the carcass alone, so flat steel bar or a plywood substrate has to be built into the units first. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Corners get their own pieces. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What do I need to sort out first?

The returns into a breast recess are the tightest scribes in the room, and they are eased in rather than forced. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. An upstand rides what a panel exposes. The old tiling must be off and the wall made good and dry before templating, not on fitting day. Where someone is living in the house through the work, the strip-out and the fit are planned so the kitchen is out of use for a day and not a week. Full-height panels need the wall made good first, which is another trade and another timescale. Same slab run as the tops.

Next step

Splashbacks and upstands in Pitshanger, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489