
Ealing · UB6
Splashbacks and upstands in Perivale
Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.
- 5.0from 23 Google reviews
- 25-year material · 5-year workmanship
- Fitted 3-7 working days from template
Perivale kitchens
What the kitchens here are actually like
Services coming up through a floor slab mean the island cannot move to suit the stone, so the stone is cut to suit the island. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. The wall decides, not the brochure.
1930s semis with rear kitchens and side additions, plus apartments in the converted Deco factory buildings where the kitchen is a straight run with a peninsula in an open-plan space.
Western Avenue runs straight through with limited turnings, so overshooting means a long loop. The Deco conversions have deep window reveals and non-standard ceiling heights, so set the splashback height off the actual reveal rather than the architect's drawing.
Steel columns and downstands land where the frame put them, which is frequently in the middle of what would otherwise be a clean run. Setting the panel proud on a subframe with a shadow gap reads as a detail; scribing to raw brick rarely does. Cut from the same slab run as the tops.
The buildings themselves are mostly 1930s semi, Art Deco industrial conversion, interwar terrace and postwar infill. Which of those you have decides most of what follows.
True everywhere
Splashbacks and upstands, in short
- Cut from the same slab run as the worktop, at the same time.
- Ordered later, from a different batch, the match is not reliable where the pieces meet.
- Socket and switch positions must be final before templating.
- The joint to the worktop is siliconed, never grouted.
Covered on our west London run. Fitted 3–7 working days from template.
1930s and inter-war semis
The building, and what it does to the job
Old brickwork with recessed or blown mortar joints, which gives the stone nothing continuous to bear on and forces either a batten frame or a dubbed-out backing board.
1930s and inter-war semis
Getting stone into the room
Residential streets have drives, but the converted-factory apartments need lift booking and residents' permits.
The lift has to be booked and blanketed before anything moves, and that booking needs to cover the old tops coming out as well as the new stone going in. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. That is agreed at template, not on fitting day.
1930s and inter-war semis
What gets asked for here
This is one of the three jobs that come up most here, behind worktop installation. It is the same template visit, the same workshop and the same installers either way.
Access
Getting stone into a Perivale kitchen
Western Avenue runs straight through with limited turnings, so overshooting means a long loop. Residential streets have drives, but the converted-factory apartments need lift booking and residents' permits.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
west London patch
Perivale is covered on our west London run, along with the rest of Ealing.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop splashbacks & upstands in Perivale
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Is Perivale on your patch?
Yes. Perivale is on the patch, and the postcodes we work here are UB6. It is worked on our west London run, along with the rest of Ealing. Permit hours are what matters, not the permit itself, because a bay that frees up at six in the evening is no use for a template at ten. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. One trip is always better than three. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
Why would worktop splashbacks & upstands in Perivale be any different from anywhere else?
Steel columns and downstands land where the frame put them, which is frequently in the middle of what would otherwise be a clean run. Setting the panel proud on a subframe with a shadow gap reads as a detail; scribing to raw brick rarely does. Cut from the same slab run as the tops. The Deco conversions have deep window reveals and non-standard ceiling heights, so set the splashback height off the actual reveal rather than the architect's drawing.
How would you get a worktop into a property in Perivale?
Western Avenue runs straight through with limited turnings, so overshooting means a long loop. Residential streets have drives, but the converted-factory apartments need lift booking and residents' permits. Where the lift will not take the longest run we design a join in rather than gamble, because a piece that will not go up has to go back on the van. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. Joint positions follow from that.
Do you do much worktop splashbacks & upstands around Perivale?
It is one of the three we do most here, behind worktop installation. Same template visit, same workshop, same installers either way. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Sockets final before template. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Siliconed to the worktop, never grouted.
What moves the number on a quote around here?
Peninsulas frequently land on a lightweight partition or on units that were never fixed down, and stone needs proper support under it before it goes on. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. The joint to the worktop is siliconed, never grouted. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What needs to be ready before you come to Perivale?
A low sill over the sink run is what decides between an upstand and stone dying into a window board, and there is often less clearance than an upstand is tall. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. An upstand rides what a panel exposes. Decide and build the backing method, scribe, subframe or board, before the template, because the templater is measuring to that face and not to the brick. A let property is specified for durability and for a fixed window, and both of those are legitimate reasons to choose differently. Splashbacks are cut from the same slab run as the tops, so they have to be decided before fabrication, not after. The wall has to be ready.
Related
More around Perivale
Other work we do in Perivale
Next step
Splashbacks and upstands in Perivale, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.