Skip to content

City of Westminster · W1D W1F

Splashbacks and upstands in Soho

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

Soho kitchens

What the kitchens here are actually like

18th-century walk-up houseflat above restaurantwarehouse-style conversion

The kitchen normally sits in the back addition or a later side return, which puts the run against the oldest and least straight wall in the building. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. Siliconed to the top, never grouted.

Small flats above bars, restaurants and shops with kitchens under 2.5m of run, often in a room with a sloping ceiling on the top floor.

Compact appliances, slimline dishwashers, and worktop depths cut down to 550mm to keep a walkway are routine. Night-time economy means the working window is genuinely 8am to lunchtime.

Rooms are tall with deep window reveals, and a run finishing into a reveal is templated to it rather than assumed square. Where a client wants a full-height piece behind the hob, it usually sits in the old chimney recess, and that recess is rarely square top to bottom or side to side, so it has to be templated as a trapezium rather than a rectangle. Cut from the same slab run as the tops.

What we are usually templating in is 18th-century walk-up house, flat above restaurant and warehouse-style conversion. The differences between them show up at template, not at enquiry.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered on our central London run. Fitted 3–7 working days from template.

Victorian and Edwardian terraces

Getting stone into the room

The hardest access in the borough. No parking at all, pedestrianised sections, servicing windows that clash with restaurant deliveries, and 18th-century houses with 700mm doors and steep dogleg stairs with winders and no landing.

Victorian and Edwardian terraces

What gets asked for here

Honestly, this is not what we do most on this patch. Worktop templating, worktop installation and worktop replacement come up more often. That is a statement about the local housing rather than about the work, and nothing about how it is quoted, cut or fitted changes because of it.

Victorian and Edwardian terraces

The building, and what it does to the job

Winder stairs in these old houses mean the maximum piece that will physically turn is often around 1.8m - design the joints for the staircase first and the kitchen second.

Victorian and Edwardian terraces

The shape of the run

A galley puts the sink on one side and the hob on the other, which spreads the cut-outs across two pieces instead of weakening one. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. The joint to the worktop is siliconed, never grouted.

Access

Getting stone into a Soho kitchen

The hardest access in the borough. No parking at all, pedestrianised sections, servicing windows that clash with restaurant deliveries, and 18th-century houses with 700mm doors and steep dogleg stairs with winders and no landing. Night-time economy means the working window is genuinely 8am to lunchtime.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

central London patch

Soho is covered on our central London run, along with the rest of Westminster.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in Soho

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you cover Soho?

Yes. Soho is on the patch, and the postcodes we work here are W1D, W1F. It is worked on our central London run, along with the rest of Westminster. The realistic answer on a main road is an early slot, a spotter on the van and pieces staged in one movement rather than several trips. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. Handling is where these pieces get damaged. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Does the housing in Soho change how worktop splashbacks & upstands works?

Georgian houses put the kitchen in a basement or a rear closet wing, and the stairs down to it are the tightest part of the whole route. Where a client wants a full-height piece behind the hob, it usually sits in the old chimney recess, and that recess is rarely square top to bottom or side to side, so it has to be templated as a trapezium rather than a rectangle. The wall makes that decision, not the brochure. Winder stairs in these old houses mean the maximum piece that will physically turn is often around 1.8m - design the joints for the staircase first and the kitchen second.

How does the stone actually reach a kitchen in Soho?

The hardest access in the borough. No parking at all, pedestrianised sections, servicing windows that clash with restaurant deliveries, and 18th-century houses with 700mm doors and steep dogleg stairs with winders and no landing. Night-time economy means the working window is genuinely 8am to lunchtime. Communal stairs get boarded and the handrail padded, and we walk the route with a tape before the first piece leaves the van. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. That is agreed at template, not on fitting day.

Is Soho really a worktop splashbacks & upstands area?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop templating, worktop installation and worktop replacement. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. Conversions put kitchens where the services could be made to reach rather than where they belong, so runs are short and interrupted. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Same batch, same run, same day. In a converted house the flat entrance and the internal doorway are usually tighter than the communal stairs, and that is easy to overlook. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Siliconed to the worktop, never grouted.

Why do two Soho kitchens the same size price differently?

The catch with a galley is that both runs are seen end-on from the doorway, so any difference in overhang between the two reads immediately. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Joint placement is a decision, not an accident. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What has to be finished before you can template?

Where a run finishes into a reveal, the depth of that reveal is taken at worktop height and nowhere else. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. Make the wall good first, or accept the detail. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. The same building type can arrive as a careful one-off kitchen or as a fast turnaround, and the honest answer is that they are priced differently. Full-height panels need the wall made good first, which is another trade and another timescale. Same slab run as the tops.

Next step

Splashbacks and upstands in Soho, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489