Skip to content

City of Westminster · W1J W1K W1S

Splashbacks and upstands in Mayfair

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

Mayfair kitchens

What the kitchens here are actually like

Georgian townhouselisted mansion flatlateral apartment conversionmews house

These are the multi-piece jobs, where vein direction across a join matters as much as the join itself. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Siliconed to the top, never grouted.

Two distinct jobs - grand flats where the kitchen is a small back-of-house room the owners never intended to be seen, and lateral conversions where two flats have been knocked together and the kitchen becomes a designed room with book-matched marble, a 3m island and a hidden prep pantry behind it. Specs come from an interior designer with a drawing, not from the client.

Marble here is specified by the designer and it stains - get the client to sign off on sealing and expected patina before you fabricate, because the complaint always comes later. Estate freeholders impose alteration consents and works hours, the buildings are listed so nothing gets fixed to original fabric without approval, and the lifts in period blocks are small original cars that will not take a slab. Deliveries are frequently routed through the mews at the back on a permit.

Original joinery is deep and stands proud of the plaster, so the run is plotted to the units rather than to the wall behind them. Long runs mean more than one piece, and the joint belongs in a corner or on a hob centre line rather than mid-run. Cut from the same slab run as the tops.

What we are usually templating in is Georgian townhouse, listed mansion flat, lateral apartment conversion and mews house. Each of those behaves differently once the old top comes off.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered on our central London run. Fitted 3–7 working days from template.

period detached houses and villas

What gets asked for here

This is not the local speciality and there is no point saying otherwise: worktop design & quotation, worktop fabrication and worktop templating is what the housing here actually asks for. It is quoted, cut and fitted exactly the same way regardless.

period detached houses and villas

Getting stone into the room

Without a bay the van ends up on a single yellow with a crew member watching it, which takes a pair of hands off the carry. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. Handling is where these pieces get damaged.

Access

Getting stone into a Mayfair kitchen

Estate freeholders impose alteration consents and works hours, the buildings are listed so nothing gets fixed to original fabric without approval, and the lifts in period blocks are small original cars that will not take a slab. Deliveries are frequently routed through the mews at the back on a permit.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

central London patch

Mayfair is covered on our central London run, along with the rest of Westminster.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in Mayfair

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Is Mayfair on your patch?

Yes. Mayfair is on the patch, and the postcodes we work here are W1J, W1K, W1S. It is worked on our central London run, along with the rest of Westminster. A controlled parking zone means either a visitor permit sorted in advance or a suspended bay, and a suspension is applied for days ahead rather than on the morning. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Handling is where these pieces get damaged. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Why would worktop splashbacks & upstands in Mayfair be any different from anywhere else?

Arts and Crafts houses have deep eaves, low windows and inglenook recesses, so the kitchen has more corners and reveals than its floor area suggests. These runs are long and often include a range recess, so the splashback is nearly always more than one piece and the joint placement matters, put it in a corner or over a hob centre line, not randomly in the middle of a clear run. The wall makes that decision, not the brochure. Marble here is specified by the designer and it stains - get the client to sign off on sealing and expected patina before you fabricate, because the complaint always comes later.

How would you get a worktop into a property in Mayfair?

Estate freeholders impose alteration consents and works hours, the buildings are listed so nothing gets fixed to original fabric without approval, and the lifts in period blocks are small original cars that will not take a slab. Deliveries are frequently routed through the mews at the back on a permit. A car that takes 2.4m on the diagonal will not take a three-metre worktop however it is stood, and there is no trimming it on the landing. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. It decides panel size before anything is cut.

Is Mayfair really a worktop splashbacks & upstands area?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop design & quotation, worktop fabrication and worktop templating. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. In a converted house the flat entrance and the internal doorway are usually tighter than the communal stairs, and that is easy to overlook. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Siliconed to the worktop, never grouted. Party-wall and lease conditions in a converted building set when noisy work can happen, which shapes the fitting day more than the kitchen does. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Same batch, same run, same day.

What moves the number on a quote around here?

If the island is a few hundred millimetres longer than the usable length of a slab, a second slab gets bought to gain that overhang, and the whole slab is paid for rather than the part used. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. Joint placement is a decision, not an accident. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What needs to be ready before you come to Mayfair?

The returns into a breast recess are the tightest scribes in the room, and they are eased in rather than forced. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. An upstand rides what a panel exposes. The range and extractor must be sited and the window cill finished before the template, as both fix the vertical limits of the splashback. The householder is normally on site at template, and that is the right time to settle sink position, tap centres and overhang rather than agree them by email. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Same slab run as the tops.

Next step

Splashbacks and upstands in Mayfair, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489