
Lambeth · SW16
Worktop replacement in Streatham
Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.
- 5.0from 23 Google reviews
- 25-year material · 5-year workmanship
- Fitted 3-7 working days from template
Streatham kitchens
What the kitchens here are actually like
Blockwork with a hard render that has been patched over decades looks modern and behaves nothing like it. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. Stone is far heavier than what is coming off.
Edwardian terraces off the high road take rear extensions of moderate depth, producing an L-shaped kitchen with a peninsula rather than the wide island layouts found further west. The long run of flats above the shops on the high road are single-galley kitchens where a top and upstands is the whole scope.
Above-shop kitchens here sit on old timber floors that slope towards the front of the building, so level off the units and pack rather than following the floor.
Working hours are constrained by the business underneath, so noisy work has a window rather than a day. The units are often 1970s or 80s and only around 500mm deep, so a standard 600mm stone top overhangs at the front and the doors and drawer fronts need checking against it. Units kept, surface changed, one day.
The stock behind these kitchens runs to Edwardian terrace, Victorian terrace, Above-shop flat, 1930s semi and Postwar block. Which of those you have decides most of what follows.
True everywhere
Worktop replacement, in short
- The units stay. Only the surface changes.
- Old tops come out in the morning, new stone is down and sealed the same day.
- A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
- The carcasses have to be sound: stone is far heavier than laminate.
Covered on our south London run. Fitted 3–7 working days from template.
Victorian and Edwardian terraces
What gets asked for here
The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. The carcasses have to be sound, because stone is several times the weight of what is coming off. A day, not a project.
The research on this patch puts this at the top of the list, above worktop splashbacks & upstands and worktop installation.
Victorian and Edwardian terraces
The building, and what it does to the job
Chipboard carcasses under the sink swollen and crumbling from a slow tap or waste leak, which will not take the weight of stone and need replacing before fit day.
Victorian and Edwardian terraces
Getting stone into the room
The high road is a red route with bus lanes and constant traffic, and above-shop flats are reached through a shared door and a straight steep stair with no landing to rest on. Residential side streets are permit-controlled but usually workable outside peak hours.
Access
Getting stone into a Streatham kitchen
The high road is a red route with bus lanes and constant traffic, and above-shop flats are reached through a shared door and a straight steep stair with no landing to rest on. Residential side streets are permit-controlled but usually workable outside peak hours.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
south London patch
Streatham is covered on our south London run, along with the rest of Lambeth.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop replacement in Streatham
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you actually work in Streatham, or just list it?
Yes. Streatham is on the patch, and the postcodes we work here are SW16. It is worked on our south London run, along with the rest of Lambeth. Where the frontage is a clearway the unload happens away from the door and the carry gets longer, which is a crew and time question rather than a stone one. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. The waste run is planned, not improvised. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
What is different about worktop replacement in Streatham?
Working hours are constrained by the business underneath, so noisy work has a window rather than a day. Chipboard carcasses under the sink swollen from a slow leak will not take stone and get replaced before fit day. Units kept, surface changed, one day. Above-shop kitchens here sit on old timber floors that slope towards the front of the building, so level off the units and pack rather than following the floor.
Is access a problem in Streatham?
The high road is a red route with bus lanes and constant traffic, and above-shop flats are reached through a shared door and a straight steep stair with no landing to rest on. Residential side streets are permit-controlled but usually workable outside peak hours. Communal stairs get boarded and the handrail padded, and we walk the route with a tape before the first piece leaves the van. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. The strip-out is planned around it.
Is Streatham mostly worktop replacement work for you?
Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop splashbacks & upstands and worktop installation. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. The carcasses have to be sound, because stone is several times the weight of what is coming off. A day, not a project. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. A day, not a project.
What decides the price of a worktop in Streatham?
Where the return runs into a wall that is out of square, the corner is templated as the angle it really is rather than as ninety degrees. Old laminate has often been holding a run square for years, and taking it off shows what the units were really doing. Height change is checked before we cut. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What do I need to sort out first?
Level has to hold across the whole room rather than along one wall, or a floor that falls end to end shows as a step where two pieces meet. We would rather find it at template than on the morning, which is why the templater looks behind the units. The laminate has been covering it up. Empty the base units completely and have a plumber disconnect the sink, tap and any washing machine plumbed in under the worktop before we arrive. Where ownership is split across a building, the common parts belong to someone else and the carry route is negotiated rather than assumed. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Plumber either side of us.
Related
More around Streatham
Other work we do in Streatham
Next step
Worktop replacement in Streatham, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.