Skip to content

Harrow · HA1 HA2

Splashbacks and upstands in West Harrow

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

West Harrow kitchens

What the kitchens here are actually like

Edwardian terrace1920s semismall 1960s block

Two runs and a return into a rear extension is the pattern, and the return is the piece that never nests neatly on a slab. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. Same slab run, same day, same batch.

Edwardian and early interwar terraces with a rear kitchen in the back addition, and gardens deep enough that a modest single-storey extension is common but a full-width one is not. Finished kitchens run about 3.5m along one wall with a short peninsula, and the utility usually ends up under the stairs or in a lean-to.

These kitchens have been retiled at least twice, and stripping the tiles takes the bottom band of plaster with them because the old laminate ran underneath rather than up to them. These kitchens are nearly always retiled at least twice, and stripping the old tiles takes the bottom course of plaster with it because the original laminate top ran underneath the tiles rather than up to them. The wall makes that decision, not the brochure.

What we are usually templating in is Edwardian terrace, 1920s semi and small 1960s block. That mix is why two jobs on the same road can run completely differently.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered on our north west London run. Fitted 3–7 working days from template.

Victorian and Edwardian terraces

What gets asked for here

This is not the local speciality and there is no point saying otherwise: worktop replacement, worktop installation and worktop templating is what the housing here actually asks for. It is quoted, cut and fitted exactly the same way regardless.

Victorian and Edwardian terraces

The building, and what it does to the job

The shared side alley is the deciding factor on these terraces, so confirm the gate width and whether the neighbour's fence can be dropped before promising a single-piece top.

Victorian and Edwardian terraces

Getting stone into the room

Terraced streets with a few dropped kerbs and mostly free but crowded parking, and side alleys of around 750mm shared with the neighbour, which usually works for a slab on edge if the gate is removable.

Victorian and Edwardian terraces

The shape of the run

Two parallel runs with a walkway between them is the most efficient shape there is on a slab, because both pieces nest as straight lengths with almost no waste. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. Corners get their own pieces.

Access

Getting stone into a West Harrow kitchen

Terraced streets with a few dropped kerbs and mostly free but crowded parking, and side alleys of around 750mm shared with the neighbour, which usually works for a slab on edge if the gate is removable.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

north west London patch

West Harrow is covered on our north west London run, along with the rest of Harrow.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in West Harrow

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Is West Harrow on your patch?

Yes. West Harrow is on the patch, and the postcodes we work here are HA1, HA2. It is worked on our north west London run, along with the rest of Harrow. A free-parking street with cars both sides can still leave the van forty metres away, and that distance is carry, not driving. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. Handling is where these pieces get damaged. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Why would worktop splashbacks & upstands in West Harrow be any different from anywhere else?

The classic arrangement is the original back room with a later extension bolted onto it, so the kitchen is two ages of building in one room. These kitchens are nearly always retiled at least twice, and stripping the old tiles takes the bottom course of plaster with it because the original laminate top ran underneath the tiles rather than up to them. Cut from the same slab run as the tops. The shared side alley is the deciding factor on these terraces, so confirm the gate width and whether the neighbour's fence can be dropped before promising a single-piece top.

How would you get a worktop into a property in West Harrow?

Terraced streets with a few dropped kerbs and mostly free but crowded parking, and side alleys of around 750mm shared with the neighbour, which usually works for a slab on edge if the gate is removable. The side passage is the measurement that matters, because a piece has to be carried flat down it and then turned in at the back door, and the turn is always tighter than the passage. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. It decides panel size before anything is cut.

Is West Harrow really a worktop splashbacks & upstands area?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop replacement, worktop installation and worktop templating. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Sockets final before template. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Same batch, same run, same day.

What moves the number on a quote around here?

The catch with a galley is that both runs are seen end-on from the doorway, so any difference in overhang between the two reads immediately. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Corners get their own pieces. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What needs to be ready before you come to West Harrow?

Walls that bow along their length are the normal condition rather than the exception, and a straight-cut back edge will show a shadow gap at one end and touch at the other. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. Make the wall good first, or accept the detail. The old tiling must be off and the wall made good and dry before templating, not on fitting day. Owner-occupied kitchens are usually being done once, which is why the edge profile, the vein direction and where a join falls are worth the conversation. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Same slab run as the tops.

Next step

Splashbacks and upstands in West Harrow, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489