Skip to content

Redbridge · IG6

Stone bar tops in Barkingside

A bar top takes weight on its front edge all evening, so the overhang and what carries it matter more than the slab does.

  • 5.0from 26 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Barkingside kitchens

The buildings and streets around Barkingside

1930s semipost-war semi1960s terracemodern flat

Where the bar tops in Barkingside get complicated is rarely the stone itself, and much more often the room the stone has to go into. Mostly modest inter-war and post-war semis where the kitchen has been extended a couple of metres into the garden rather than fully knocked about, giving an L-shape with the sink moved to the new rear wall and a 3m run down the long side. Quite a lot of straight like-for-like swaps here where the units are sound and only the tops have gone. Every quote we write for Barkingside starts with somebody looking at the actual run, not with an assumption about what is behind the units.

Small, roughly square kitchens with a back door and a window in the middle of the run: short lengths, few joins, and a lot to work around. What carries a bar top here is rarely a kitchen carcass, so the framing underneath gets looked at before anything is measured across the top of it. Elbows and glasses, not knives and pans.

The window sits in the middle of the run over the sink, and its board and cill set the limit on how tall an upstand can be. Lightweight partitions are common in this stock, so anything fixed back to a wall gets noggins let in before a bracket is offered up to it. Wide doors make piece length a choice rather than a limit.

What we are cutting for, here, is 1930s semi, post-war semi, 1960s terrace and modern flat. The wall build-up is different in each, and the scribe follows the wall.

True everywhere

Stone bar tops, in short

  • Anything past about 300mm of unsupported overhang gets steel or a corbel underneath.
  • The front edge is the one people touch, so it is profiled and polished on all exposed faces.
  • Quartz is the usual choice indoors; porcelain and sintered stone where drinks and citrus are constant.
  • A bar top is fitted level to itself, not to the floor, because floors in older buildings rarely are.
Borough
Redbridge
Postcodes
IG6
Covered on
our east London run
Fitted
5–10 working days from template

The place

Why Barkingside is its own job

Stone is heavy, unforgiving and cut to a millimetre, so what governs a job in Barkingside is everything around it. Easy suburban access on the residential roads with driveways and dropped kerbs; harder on the High Street itself and the flats above the parade, where there is no parking and stairs to the first floor. Plenty of replacement-only work here, so the critical measurement is the existing carcass depth, older units are often 570mm rather than 600mm and the overhang has to be set accordingly. Every run, cut-out, edge and join goes on its own line of the quote, so you can see exactly what you are paying for.

The work

What bar tops involves

The fitting workmanship carries the same five year guarantee as a kitchen worktop, and the support under the front edge is covered by it as much as the stone above is. Seating positions are marked at the survey, so any break in a long counter can be placed over support and clear of where somebody will actually sit. You end up with one firm answerable for the whole piece, support included, so there is no argument available about whether a sagging front edge is the stone or the joinery.

Bar work is joinery with a stone surface on it, and the joinery is the half that decides whether the surface behaves itself. Flat steel is let in flush with the bearing face of the frame, so the stone still lands on a continuous plane rather than on a bar standing proud of everything else. A back door into the kitchen usually lets the piece come in whole, which keeps a break out of a short top that could not carry one. The projection is engineered, not hoped for.

Polished stone edge profile close up
Edge profilesSee the options

The money

What it costs in Barkingside

A bar top is priced from what holds it up as much as from the stone, because the steel, the corbels and the time spent fixing them are real lines rather than an allowance. One continuous L takes more slab than its metreage implies, because the waste sits inside the angle. Supply-only material sits between £110 and £550 per square metre, which is one input into the quote rather than the quote. Frame, support and top, each priced as itself.

1930s and inter-war semis

What Barkingside asks for

This is commercial work rather than something the housing here generates. Domestically these streets ask for worktop replacement, worktop installation and worktop splashbacks & upstands. It runs through the same template, the same bench and the same fitters.

1930s and inter-war semis

Barkingside in the housing figures

In this corner of the borough, most of the stock dates from the building boom of the twenties and thirties. Rooms of that vintage are small, so the bar replaces a table rather than joining one, and the stool count comes off the floor space. Two tiers or one, decided on the drawing.

1930s and inter-war semis

The carry, and what it rules out

Where the drive is shared, the half-hour the van spends in the way is agreed with the neighbour in advance rather than apologised for at the time. It decides whether the counter can stand on trestles outside while the support underneath is checked, which is the step everybody wants to skip. A licensed room sets the hours and the parking has to agree.

Access

Getting stone into a Barkingside kitchen

Easy suburban access on the residential roads with driveways and dropped kerbs; harder on the High Street itself and the flats above the parade, where there is no parking and stairs to the first floor.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted, working days from template. The same on this patch as every other.

east London patch

Barkingside is covered on our east London run, along with the rest of Redbridge.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Barkingside

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Is Barkingside far enough out to be a problem for you?

Yes. Barkingside is on the patch, and the postcodes we work here are IG6. It is worked on our east London run, along with the rest of Redbridge. A step up from the drive to the threshold turns the last two metres into a lift, and a lift is where two pairs of hands become the minimum. A bar fit runs longer than a worktop run, because the frame, the support and the stone are three stages and only the last of them is quick. Nothing is rushed off a tail lift onto an unsupported nose. Everything that involves you happens in your kitchen, so there is nothing to visit and nothing to collect.

Why would bar tops in Barkingside be any different from anywhere else?

Base units from the seventies and eighties are often only 500mm deep, so a 600mm stone top overhangs at the front and the doors want checking against it. A bar in this stock is nearly always a short breakfast counter on the end of a run, and the end is exactly the point where the load lands with the least underneath it. Noggins first, brackets second, stone last. A junction between an original floor and a later extension slab is almost never at the same level, so units carrying a run across it need packing first. On a bar that counts twice over, because the same obstruction has to be cleared by the stone above it and by the knees of whoever is sitting at it. A corbel never lands where a knee goes.

What is the carry like in Barkingside?

A loading bay or a red route puts a clock on the unload, so the pieces come off in the order they will be fitted rather than the order they were loaded. That matters more on a bar than on a run, because a join forced by the way in cannot be allowed to land in the unsupported part of the nose. A polished front edge is protected from the tail lift to the frame. Where the van cannot turn on the plot it has to arrive already facing the right way, so the approach along the street is part of the plan. That has to cover more than the unload, since the corbels, the flat bar and the fixings all come off the van well before the top does. Two trips to the van, one for hardware and one for stone.

Is Barkingside really a bar tops area?

Not to any real extent, and it would be easy to imply it was. What the research on this patch actually lists is worktop replacement, worktop installation and worktop splashbacks & upstands. It describes the kitchens on this patch, not the work that goes into them. Same quoting, same cutting, same fitting as anywhere else on the patch. Extension work runs late far more often than it runs early, and the worktop is close to the last thing in, so the date agreed at the start is rarely the date that happens. Where the same detail is repeating across several rooms the support gets standardised once and then cut to length, which is cheaper than drawing it each time. What gets leaned on gets specified for leaning. Where a family has been living around a building site for months, the finish date carries more weight than any other part of the specification. Harder use and stronger cleaning products push the answer towards porcelain or sintered stone, because a resin-bound surface is the one that shows what has been left standing on it. Batch work still gets its own template per room.

Where does the money go on a Barkingside worktop?

An L can be mitred at the corner for a continuous look or butt-jointed over the gable, and the two are different money and different risk. A bar laid over that is a second level rather than a wider one, so it wants a spine underneath it and a settled detail where the two heights meet. A bar on an end takes the corner load a wall used to take. Stone is £110 to £550 per square metre supply only, and the templating, the fabrication and the fitting each carry their own line.

What needs to be ready before you come to Barkingside?

Legs bottoming out on hard concrete or an uneven screed mean the tops of the carcasses are not one plane, and that is picked up at template rather than on fitting day. A bar top is levelled to itself rather than to what it stands on, so the packing goes into the frame and the stools take up whatever the floor is doing. The bar is packed level off the frame, not off the floor. Tell us what the end of the run is built off, send the length and projection you want, and confirm whether there is rear access into the kitchen. The decision usually gets made standing in the room rather than at a desk, which is why a slab is worth viewing whole instead of choosing from a sample card. A home bar is discretionary work, so the edge profile, the corbel detail and the radius on the nose are worth settling properly rather than defaulting to whatever is quickest. Fixings into structure are agreed before they are drilled.

How many visits does a Barkingside worktop take?

A template on a normal kitchen takes two to three hours in the room. Templating and fitting are two visits, not one, and the gap between them is when the stone is actually cut. The fit follows 5 to 10 working days after the template, and nothing is cut before that visit because nothing is cut from a plan. Blockwork with a hard render that has been patched over decades looks modern and behaves nothing like it. A bar top put into a room like that is an overhang question first, because the nose has to carry people leaning on it long after the slab has stopped being interesting. The seating side is the side the piece is drawn from.

Do you take the old worktop away?

On a replacement the old top comes off in the morning and the new stone is down and sealed the same day. The sink and hob are lifted out with the old top and kept aside if you are reusing them. Disposal means it goes in the van, not into the garden to wait for a collection. A drive behind an electric gate depends on somebody being in to open it and on the gate staying open while the load comes off. A trade bar is fitted around opening times, so the window the van has and the window the room has are rarely the same window. Trestles outside beat balancing a top on a half-built frame.

What happens when the route into a Barkingside kitchen is tighter than the worktop?

The alternative to a join is a shorter run, which is usually the wrong thing to trade away. Doorways, the newel post and the handrail usually take the room away, rather than the stairs themselves. The lift, if there is one, is measured on the diagonal, because that is the dimension a long piece actually uses. The van gets close to the door and the stone comes off the tail lift onto a trolley, which is about the shortest carry we ever get. The steel and the corbels travel that same route and go in first, so a bar is three separate carries into one room rather than a single delivery. Nothing is leaned on a stud wall while it waits to be fitted.

Is the quote a fixed price or an estimate?

The quote is written from the template drawing. Before that it works from what you have described. Ask for the lines rather than the total. One number for a kitchen tells you nothing you can check. Every run, cut-out, edge, join and groove set is a line, which is what makes it comparable with anyone else’s. Level has to hold across the whole room rather than along one wall, or a floor that falls end to end shows as a step where two pieces meet. Where the nose has to be carried past something fixed the support moves rather than the stone, since a corbel landing in the knee space is worse than no corbel at all. A notch in a bar top is drawn with its support beside it.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 on Google →
Nice work from worktop worx. Highly recommended

Rasika Kumarage

Google review

Lovely team, business and quality motivated, prompt delivery with installation. Affordable prices. Wide range of worktops available. High recommendation

Loreta Skalisiene

Google review

Great service. Super quick and easy communication. I love my new worktop 🥹🥹

Sara Arghir

Google review

Next step

Stone bar tops in Barkingside, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489