Skip to content

Richmond upon Thames · SW13

Stone bar tops in Castelnau

A bar top takes weight on its front edge all evening, so the overhang and what carries it matter more than the slab does.

  • 5.0from 26 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Castelnau kitchens

The buildings and streets around Castelnau

1840s stucco villaVictorian semiinterwar flatspostwar infill

In Castelnau, what the local housing does to stone bar top work is worth knowing before you commit to anything. Distinctive early Victorian paired villas with tall rooms and deep plans - kitchens usually at the rear or in a lower ground, with 3.5m to 4m runs, high ceilings that allow full-height splashbacks, and space for a proper island in the wider houses. Photographs of the run and a rough length are usually enough for us to say which of those you are looking at.

Where the walls have been dry-lined over the old lath there is a void behind the board and no solid fixing until a batten is found. Every face of a bar is on show from a stool, so the front edge and the underside of the nose are profiled and polished rather than left as the saw finished them. Stool height and knee room are settled on the drawing.

The closet wing is a narrow projection at the back with windows on two sides, which leaves very little continuous wall for a run. Getting a top through the hall and round the newel caps its length, so a long counter in one of these houses is drawn as two pieces with the break sitting over a corbel. Wide doors make piece length a choice rather than a limit.

The stock behind these kitchens runs to 1840s stucco villa, Victorian semi, interwar flats and postwar infill. The one you have sets the piece length before the kitchen does.

True everywhere

Stone bar tops, in short

  • Anything past about 300mm of unsupported overhang gets steel or a corbel underneath.
  • The front edge is the one people touch, so it is profiled and polished on all exposed faces.
  • Quartz is the usual choice indoors; porcelain and sintered stone where drinks and citrus are constant.
  • A bar top is fitted level to itself, not to the floor, because floors in older buildings rarely are.
Borough
Richmond upon Thames
Postcodes
SW13
Covered on
our south west London run
Fitted
5–10 working days from template

The place

Why Castelnau is its own job

If a firm has never fitted in Castelnau, the things that decide the day will only turn up once the van is parked. The road is a busy artery towards the bridge with red-route style restrictions at peak, so unloading happens in the side turnings; villa front gardens are short with a flight of steps up to a raised entrance. Tall rooms tempt full-height slab splashbacks, and at 2.4m plus these become the heaviest single piece on the job - plan the lift for the splashback, not the top. Better to know it at the design visit than to find out with a slab standing on the pavement.

The work

What bar tops involves

Material choice is part of it: quartz for most indoor bars, porcelain or sintered stone where citrus, wine and strong cleaning products land on the surface every day. The top is machined at the works with the front edge, the ends and the underside all profiled and polished, since every one of those faces is at eye level from a stool. You are left with a counter level along its own length whatever the floor beneath it is doing, which is what stops a glass wandering across the surface.

The piece is open on the front, the ends and the underside, which is the reverse of a kitchen run that hides three of its four edges against something. Waterfall ends are cut in sequence off the length beside them, so the pattern carries down the leg instead of restarting at the mitre. The hall and the turn at the stairs cap how long a single piece can be, which is why a long counter here arrives as two pieces with a planned break. Every face somebody can see is finished.

Undermounted sink cut-out in a quartz worktop
Sink cut-outsSee the options

The money

What it costs in Castelnau

Material choice moves the figure less than the detail does, and on a bar the detail means the apron, the radius and whatever sits under the front edge. Overhangs, a waterfall end and seating all add machining, and an island is where those decisions cluster. The rate is £110 to £550 per square metre supply only, though what you buy is slabs rather than square metres, which is why the material line follows the yield and not the tape. Edge work is counted by the face, and a bar has more of them.

period detached houses and villas

What Castelnau asks for

Not a domestic job, so it is not ranked against the streets around it. Those streets generate worktop splashbacks & upstands, worktop fabrication and worktop installation. Same slabs, same saw, same installers.

period detached houses and villas

The carry, and what it rules out

Blankets on the walls and a board on the floor go in before the first piece, because a scratched car becomes a bill from the managing agent long after the kitchen is finished. The steel and the corbels travel that same route and go in first, so a bar is three separate carries into one room rather than a single delivery. Where the route is tight the bar gains a join behind a corbel.

period detached houses and villas

The shape of the run

The offcut taken out of the middle for a hob is a large usable piece, and it is worth deciding early whether it becomes an upstand or goes in the skip. Where the counter runs flush with the working surface instead of standing above it the whole thing becomes one plane, which looks better and doubles the unsupported span. Stools need floor as well as knee room, and both are drawn.

Access

Getting stone into a Castelnau kitchen

The road is a busy artery towards the bridge with red-route style restrictions at peak, so unloading happens in the side turnings; villa front gardens are short with a flight of steps up to a raised entrance.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted, working days from template. The same on this patch as every other.

south west London patch

Castelnau is covered on our south west London run, along with the rest of Richmond upon Thames.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Castelnau

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you cover Castelnau?

Yes. Castelnau is on the patch, and the postcodes we work here are SW13. It is worked on our south west London run, along with the rest of Richmond upon Thames. A red route means no stopping, and no stopping means exactly that, so the stone comes in from a side street or from a bay behind the property. A bar fit runs longer than a worktop run, because the frame, the support and the stone are three stages and only the last of them is quick. What comes off the van first is whatever holds the top up. The work comes to you. We template in your kitchen and fit in your kitchen, with nothing to visit or collect.

What do the kitchens in Castelnau do to bar tops?

Original panelling and shutter boxes stand out from the structural wall, so the face the units meet is joinery rather than plaster. A bar in one of these houses is either the end of a through-lounge or a cellar conversion, and the two behave differently. Noggins first, brackets second, stone last. A floor that falls across the depth of a run rather than along it tips the carcasses front to back, and packing the front feet changes the overhang while it fixes the level. A bar top is levelled to itself rather than to what it stands on, so the packing goes into the frame and the stools take up whatever the floor is doing. A notch in a bar top is drawn with its support beside it.

Do you have trouble getting long pieces into Castelnau kitchens?

Lift doors close on a timer that takes no account of somebody holding a worktop, so a pair of hands stays on the buttons at each end. That matters more on a bar than on a run, because a join forced by the way in cannot be allowed to land in the unsupported part of the nose. A polished front edge is protected from the tail lift to the frame. Where the frontage is a clearway the unload happens away from the door and the carry gets longer, which is a crew and time question rather than a stone one. A trade bar is fitted around opening times, so the window the van has and the window the room has are rarely the same window. The van stands for the frame as well as the top.

Does Castelnau actually ask for bar tops?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop splashbacks & upstands, worktop fabrication and worktop installation. That is a point about the buildings round here, not about the job. The quoting, the cutting and the fitting are identical here to anywhere else we work. Extension budgets are usually well spent by the time the worktop is ordered, which is where the choice between quartz and a thinner sintered stone actually gets made. A bar is nearly always the last thing added to a project, so it is templated on a visit of its own once the joinery around it has stopped moving. A bar is the piece most likely to be added after the kitchen. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Where the same detail is repeating across several rooms the support gets standardised once and then cut to length, which is cheaper than drawing it each time. Frames get opened up again when the support was left out.

What decides the price of a worktop in Castelnau?

It is walked round rather than looked at from one side, so the direction the veining runs along it cannot be hidden against a wall the way it can on a perimeter run. A bar laid over that is a second level rather than a wider one, so it wants a spine underneath it and a settled detail where the two heights meet. The bar length answers to the seats, not to the wall behind it. The supply-only figure for material runs £110 to £550 per square metre, and templating, fabrication and fitting are lines of their own.

What do I need to sort out first?

Once the carcasses are levelled the gap under the plinth varies along the run, and that varying gap is the honest record of what the floor is doing. Where the nose has to be carried past something fixed the support moves rather than the stone, since a corbel landing in the knee space is worse than no corbel at all. Leaning is a sideways load and framing has to answer for it. Send the length you want, the number of stools, and photographs walking from the pavement through to the room, including the cellar stair if the bar is going down there. A street with houses in single occupation next to the same houses cut into flats produces two completely different jobs from the same elevation. A home bar is discretionary work, so the edge profile, the corbel detail and the radius on the nose are worth settling properly rather than defaulting to whatever is quickest. The support is specified for the next occupant as well.

Do you quote Castelnau jobs by the square metre?

Two kitchens the same length can be far apart, because material, edge and cut-outs move independently of size. Every run, cut-out, edge, join and groove set is a line, which is what makes it comparable with anyone else’s. The edge profile is its own line, so a shaped edge and a square one are two different figures. A wall line that runs level over a floor that does not means the finish closes up on the plinth at one end, which is joinery rather than something the stone can answer. Anything that puts a notch in a bar takes material out of the piece at the point people lean on it, so the notch and the support are drawn together or not at all. Nothing under the nose is allowed to be in the way.

Is a full-height splashback practical in a Castelnau kitchen?

An upstand is a slim strip that follows the worktop up the wall; a full-height splashback runs from the worktop to the underside of the wall units. An upstand covers the gap where the worktop meets a wall that is not flat, which is its real job. The joint between splashback and worktop is siliconed, never grouted, so it can move a little without cracking. A basement is often reached by its own door under the front steps, and that door is smaller than anything else on the route. In a cellar the headroom fixes the counter height first and everything else works back from it, and the stair down is the tightest part of the route because stone carried downward is harder to control than stone carried up. Two tiers where a single piece will not reach.

Who decides where a join falls?

A mitred join at a corner is a different job from a butt join along a run, and they are not priced the same. Veining carries through a join where both pieces come off the same slab, which is decided at nesting. An island often runs in one piece where a wall run cannot. Some of them overhang on two sides at once, and each side is worked out separately, because the load on an edge people lean against is not the load on an edge people walk past. The seating side is the part that decides the piece, because a stool at the open end puts a load on a corner that a wall would otherwise have been carrying. A deep apron takes knee room away quietly.

Can you fit stone I have already bought for a Castelnau kitchen?

Stone cut to somebody else’s drawing cannot usefully be re-cut to yours. Remnants bought elsewhere are the awkward case, because the drawing is then made to fit the stone. Delivery to the workshop has to be arranged and dated, since nothing is nested until it is there. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. The support has to be specified to whoever is building the frame before it is boarded up, since steel let in afterwards means taking the front of the bar apart again. Repeat detail, single survey, matched batch.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 on Google →
Perfect service,the best on this job

Kleant Istrefi

Google review

I recently had my kitchen worktop and splashback done by Karem from Worktop WorX and i am very pleased with the result. From the initial consultation and measurements to the final installation, the whole process was smooth and professional. The attention for details and the quality made the difference and everything was finished to a high standard. I definitely recommend Worktop WorX to anyone looking for reliable and high quality kitchen work

Alexandru Balint

Google review

Really impressed with the quality and finish of these worktops. Great range of materials, precise fabrication, and smooth communication throughout. The whole process was easy and the final result looks fantastic. Highly recommend!

Nastasia Drago

Google review

Next step

Stone bar tops in Castelnau, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489