Skip to content

Greenwich · SE7

Worktop installation in Charlton

Fitting day: protected route, back edges scribed to the real wall line, joins pulled flush, sink and hob sealed.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

Charlton kitchens

What the kitchens here are actually like

Victorian terraceEdwardian bay-fronted terrace1930s semipostwar council maisonette

Lath and plaster, a settled floor and a hall with a turn in it are the three things that decide how this job runs. Almost everything that makes a fitting day hard is a property of the building rather than of the stone. One visit, our own installers.

Runs are typically 2.4m to 3m in an L, islands only where a rear extension has gone in.

The roads climb hard from the riverside up to the village and parking on the terraced streets is nose-to-tail; the interwar semis higher up usually have a drive, which changes the job completely. Steep streets of Victorian and Edwardian terraces with rear-addition kitchens, plus interwar semis higher up the hill where the kitchen is a small square room off the hall that owners usually open into the dining room. Some of the steepest carries in the borough are here, if the van can't get above the house, budget for pushing a slab up a 1-in-8 pavement.

The rear room is generous with a chimney breast in one corner, so the run gains a return and two scribed ends whatever the plan drew. The day is planned backwards from the hall. The slow parts are slow for a reason.

What turns up on the job sheets is Victorian terrace, Edwardian bay-fronted terrace, 1930s semi and postwar council maisonette. That mix is why two jobs on the same road can run completely differently.

True everywhere

Worktop installation, in short

  • One visit. A straightforward run is a morning; an island and splashbacks take most of the day.
  • Every piece is carried in by hand, and stone does not bend.
  • We seat and seal the sink and hob. We do not connect water, waste, gas or electrics.
  • Floors and units are protected before anything comes through the door.

Covered on our south east London run. Fitted 3–7 working days from template.

Victorian and Edwardian terraces

What gets asked for here

Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. The fitting day is scheduled to suit that rather than to suit the diary. The prep list is not optional.

It is on the shortlist for this patch rather than at the top of it, because worktop replacement comes up more often. Nothing about the process differs between the two.

Victorian and Edwardian terraces

The building, and what it does to the job

The hallway turn and the door width, which cap the longest single piece we can physically get to the kitchen regardless of what the run measures.

Access

Getting stone into a Charlton kitchen

The roads climb hard from the riverside up to the village and parking on the terraced streets is nose-to-tail; the interwar semis higher up usually have a drive, which changes the job completely.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

south east London patch

Charlton is covered on our south east London run, along with the rest of Greenwich.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop installation in Charlton

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you cover Charlton?

Yes. Charlton is on the patch, and the postcodes we work here are SE7. It is worked on our south east London run, along with the rest of Greenwich. Where the van can pull up level with the gate the pieces are handled the fewest times, which is what actually protects them. We aim for the first slot of the day where parking is tight, because that is when the street is emptiest. It is why the arrival time is what it is. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Does the housing in Charlton change how worktop installation works?

The party wall is the straightest surface in the house and everything else has moved away from it over a century. We measure the front door, the hall width and the turn into the kitchen before anything comes off the van, because a 3m piece has to swing through that corner on edge and stone does not bend to help you. The slow parts are slow for a reason. Some of the steepest carries in the borough are here, if the van can't get above the house, budget for pushing a slab up a 1-in-8 pavement.

How does the stone actually reach a kitchen in Charlton?

The roads climb hard from the riverside up to the village and parking on the terraced streets is nose-to-tail; the interwar semis higher up usually have a drive, which changes the job completely. Door width, hall width and the diagonal at the turn are three separate measurements, and it is the diagonal that catches people out. The fitting day is planned backwards from that point, before anything comes off the van. That is what the morning is planned around.

Is worktop installation common in Charlton?

It is one of the three we do most here, behind worktop replacement. Same template visit, same workshop, same installers either way. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. The fitting day is scheduled to suit that rather than to suit the diary. The prep list is not optional. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. One visit, with the sink and hob seated and sealed before we leave. One visit, done properly.

Why do two Charlton kitchens the same size price differently?

If the island is a few hundred millimetres longer than the usable length of a slab, a second slab gets bought to gain that overhang, and the whole slab is paid for rather than the part used. On the day that means dry-laying the whole layout first and only then pulling and bonding the joins. Dry-lay first, always. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What has to be finished before you can template?

The stone carries the scribe because the wall cannot be persuaded, so back edges are cut oversize and eased in rather than dropped straight down. The back edge is eased in progressively rather than offered up once and forced. Dry-lay, mark, cut, then bond. Clear the full hall and stairs route of furniture, bikes, coats and stair-gates, and keep the front door propped and unobstructed for the carry. Consent for the work sits with the freeholder or the managing body, and getting it in writing first avoids a crew arriving to a locked door. Floors and units are protected before anything comes through the door, communal or otherwise. Access for the whole slot, or a different day.

Next step

Worktop installation in Charlton, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489