Skip to content

Havering · RM5

Worktop templating in Chase Cross

A digital template plotting the room as it really is, taken once your units are fitted, fixed and level.

Chase Cross kitchens

What the kitchens here are actually like

1950s semi1960s terracepost-war maisonette1980s infill

Units are often only 500mm deep, so a standard 600mm stone top overhangs at the front and the doors need checking against it. No stone is ever cut from a plan, which is why the visit happens after the units are in and not before. Units fitted, fixed and level first.

Closing up an old serving hatch changes the wall line, so we template after the plastering is done rather than working to the builder's intended dimension. Straight replacement is the usual brief, with a stone-topped breakfast bar formed where the hatch wall comes out. Post-war housing at the top of Collier Row with smaller, tighter kitchens than the inter-war stock down the hill, often a single run plus a short return and a serving hatch that the client wants closed up.

Post-war terraces have a short straight hall to the kitchen, which is a good deal kinder than the houses they replaced. Runs commonly finish at a doorway, and the architrave and skirting stand proud of the plaster, so the end of the top is notched or stopped on the drawing. No stone is ever cut from a plan.

The mix here is 1950s semi, 1960s terrace, post-war maisonette and 1980s infill. Which of those you have decides most of what follows.

True everywhere

Worktop templating, in short

  • Two to three hours on site for a typical kitchen.
  • Units must be fitted, fixed and level first. No stone is ever cut from a plan.
  • Sink, tap and hob must be physically on site, not just ordered.
  • A Belfast or butler sink must be installed and at its final height.

Covered from the Essex patch. Fitted 3–7 working days from template.

1930s and inter-war semis

The building, and what it does to the job

The finish at the doorway - an architrave standing proud of the wall shortens the usable run, and it is nearly always measured to the plaster instead.

1930s and inter-war semis

What gets asked for here

Second or third on the list around here, after worktop replacement. Same visit, same bench, same crew, same lead time.

1930s and inter-war semis

The shape of the run

The catch with a galley is that both runs are seen end-on from the doorway, so any difference in overhang between the two reads immediately. A layout templated off one wall instead of one datum will not sit right once all the pieces are down together. One datum for the whole room.

1930s and inter-war semis

Getting stone into the room

Open post-war layouts with verges, parking courts and hardstanding, so no restrictions to worry about, though the parking courts sit behind the houses and the front carry can be longer than it looks.

Access

Getting stone into a Chase Cross kitchen

Open post-war layouts with verges, parking courts and hardstanding, so no restrictions to worry about, though the parking courts sit behind the houses and the front carry can be longer than it looks.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

Essex patch

Chase Cross is worked from our Essex run, covering Essex & East London.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop templating in Chase Cross

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Is Chase Cross on your patch?

Yes. Chase Cross is on the patch, and the postcodes we work here are RM5. It is run from the Essex side, covering Essex & East London. A free-parking street with cars both sides can still leave the van forty metres away, and that distance is carry, not driving. The templating visit needs somewhere to stop for two or three hours, which is a different problem from unloading for twenty minutes. The templater needs a proper stop, not a pause. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Why would worktop templating in Chase Cross be any different from anywhere else?

The window sits in the middle of the run over the sink, and its board and cill set the limit on how tall an upstand can be. The scribe at worktop height differs from the one at plinth level, and only the worktop line matters. No stone is ever cut from a plan. Closing up an old serving hatch changes the wall line, so we template after the plastering is done rather than working to the builder's intended dimension.

How would you get a worktop into a property in Chase Cross?

Open post-war layouts with verges, parking courts and hardstanding, so no restrictions to worry about, though the parking courts sit behind the houses and the front carry can be longer than it looks. Where the parking court sits behind the block the carry crosses open ground and gets boarded, because loaded trolleys and block paving do not agree. The templater measures that route on the same visit, so the drawing leaves site already knowing the maximum piece. That is part of what the visit is for. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.

Do you do much worktop templating around Chase Cross?

It is one of the three we do most here, behind worktop replacement. Same template visit, same workshop, same installers either way. A kitchen carved out of a larger room sits under whatever the original plan left behind, so the run frequently ends at a blocked doorway or a boxed-in service. No stone is ever cut from a plan, which is inconvenient exactly when a programme is tight. Units fitted, fixed and level first. A kitchen carved out of a larger room sits under whatever the original plan left behind, so the run frequently ends at a blocked doorway or a boxed-in service. No stone is ever cut from a plan, which is inconvenient exactly when a programme is tight. Appliances on site, not on order.

What moves the number on a quote around here?

Two parallel runs with a walkway between them is the most efficient shape there is on a slab, because both pieces nest as straight lengths with almost no waste. The template records every angle in that shape as it actually is rather than as the plan drew it. Real angles, not plan angles. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What needs to be ready before you come to Chase Cross?

A run can measure dead right at both ends and still belly out in the middle, which only appears once the laser plots the intermediate points. The laser plots it as it is, at the exact height the worktop will sit, and the drawing carries that through. Plotted, not estimated. Units fixed, packed level and pushed as far back as the leaning wall allows, walls made good to final thickness with tiling left until after the worktop, and the sink, tap and hob on site so cut-outs are set from the real items. Where someone is living in the house through the work, the strip-out and the fit are planned so the kitchen is out of use for a day and not a week. The template happens when the units are in, fixed and level, whoever is fitting them. Appliances on site, not on order.

Next step

Worktop templating in Chase Cross, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7479 194398