
Lewisham · BR1 SE6
Splashbacks and upstands in Downham
Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.
- 5.0from 23 Google reviews
- 25-year material · 5-year workmanship
- Fitted 3-7 working days from template
Downham kitchens
What the kitchens here are actually like
Two runs and a return into a rear extension is the pattern, and the return is the piece that never nests neatly on a slab. Socket positions, sill heights and wall flatness are the three things that settle this, and all three are properties of the building. Same slab run, same day, same batch.
The standard kitchen is a small rear room about 2m by 2.7m and the usual upgrade is knocking through to the dining room for a 3.2m L with a breakfast bar.
One of the large interwar municipal estates, built to repeating semi and terrace plans.
Original quarry-tiled floors sit lower than a later screed, so a run crossing that junction needs the units packed to one level. These kitchens are nearly always retiled at least twice, and stripping the old tiles takes the bottom course of plaster with it because the original laminate top ran underneath the tiles rather than up to them. Decided before fabrication starts.
The stock behind these kitchens runs to 1920s-30s LCC cottage estate, postwar infill and 1960s maisonette block. A quote that ignores which one you have is guessing.
True everywhere
Splashbacks and upstands, in short
- Cut from the same slab run as the worktop, at the same time.
- Ordered later, from a different batch, the match is not reliable where the pieces meet.
- Socket and switch positions must be final before templating.
- The joint to the worktop is siliconed, never grouted.
Covered on our south east London run. Fitted 3–7 working days from template.
ex-local-authority flats and estates
The building, and what it does to the job
The same 3.2m L comes up constantly here, but check for the original chimney breast, it's often still there behind the plaster.
ex-local-authority flats and estates
What gets asked for here
The research on this patch does not put this among the three commonest jobs. Worktop replacement, worktop installation and worktop templating do. That changes how often we are here, not how the work is done.
ex-local-authority flats and estates
The shape of the run
The return piece is the awkward one on a slab: short, full depth, and rarely nesting neatly against the long lengths, so yield rather than area is what moves the material figure. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Joint placement is a decision, not an accident.
ex-local-authority flats and estates
Getting stone into the room
Very easy: wide roads, grass verges, dropped kerbs and driveways or hardstandings on most properties, with room to park a long van directly outside.
Access
Getting stone into a Downham kitchen
Very easy: wide roads, grass verges, dropped kerbs and driveways or hardstandings on most properties, with room to park a long van directly outside.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
south east London patch
Downham is covered on our south east London run, along with the rest of Lewisham.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop splashbacks & upstands in Downham
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Is Downham on your patch?
Yes. Downham is on the patch, and the postcodes we work here are BR1, SE6. It is worked on our south east London run, along with the rest of Lewisham. Off-street parking means the van stays put all day, so tools, packers and the offcut we would rather have than not are all within reach. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. That is why they are crated the way they are. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
Why would worktop splashbacks & upstands in Downham be any different from anywhere else?
Original quarry-tiled floors sit lower than a later screed, so a run crossing that junction needs the units packed to one level. The ragged band left when old tiles and laminate come off together is what usually decides upstand over full height. The wall makes that decision, not the brochure. The same 3.2m L comes up constantly here, but check for the original chimney breast, it's often still there behind the plaster.
How would you get a worktop into a property in Downham?
Very easy: wide roads, grass verges, dropped kerbs and driveways or hardstandings on most properties, with room to park a long van directly outside. The van gets close to the door and the stone comes off the tail lift onto a trolley, which is about the shortest carry we ever get. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. Joint positions follow from that.
Do you get much worktop splashbacks & upstands work in Downham?
Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop replacement, worktop installation and worktop templating. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Same batch, same run, same day. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Sockets final before template.
What moves the number on a quote around here?
The return piece is the awkward one on a slab: short, full depth, and rarely nesting neatly against the long lengths, so yield rather than area is what moves the material figure. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Corners get their own pieces. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What needs to be ready before you come to Downham?
A chimney breast left in place splits a wall into two alcoves, and the two are rarely the same width and rarely parallel to each other. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. An upstand rides what a panel exposes. The old tiling must be off and the wall made good and dry before templating, not on fitting day. Owner-occupied kitchens are usually being done once, which is why the edge profile, the vein direction and where a join falls are worth the conversation. Splashbacks are cut from the same slab run as the tops, so they have to be decided before fabrication, not after. Decided before fabrication, not after.
Related
More around Downham
Other work we do in Downham
Next step
Splashbacks and upstands in Downham, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.