
Hammersmith and Fulham · SW6
Splashbacks and upstands in Fulham
Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.
- 5.0from 23 Google reviews
- 25-year material · 5-year workmanship
- Fitted 3-7 working days from template
Fulham kitchens
What the kitchens here are actually like
The kitchen normally sits in the back addition or a later side return, which puts the run against the oldest and least straight wall in the building. Socket positions, sill heights and wall flatness are the three things that settle this, and all three are properties of the building. The wall decides, not the brochure.
The classic SW6 job is a side-return infill on a two-storey terrace, giving a kitchen of roughly 5m by 3.5m with a 3m run along the flank wall and an island of 2.4-2.8m, usually in quartz with a mitred 60mm edge.
Take the kitchen door and its stops off first - a 760mm opening will not pass a 900mm island top and people always find that out at the worst moment. Because so many of these houses have also gone up into the loft, the structural work is done before you arrive and the walls are new and square, which makes single long pieces realistic. Front paths have a step and a gate, halls are around 1m wide with the stair on one side, and the kitchen sits at the far end past a doorway that is often only 760mm - the door leaf and stops come off before anything moves.
A long piece has to come through the front door, down the hall, round the newel post and through a doorway with a step down into the addition. A 100mm upstand bedded on silicone is the honest answer where the plaster bows, because it rides what a tall panel exposes. Cut from the same slab run as the tops.
On these streets the housing is late Victorian two-storey terrace, Edwardian terrace, purpose-built mansion flat and loft-converted family house. That mix is why two jobs on the same road can run completely differently.
True everywhere
Splashbacks and upstands, in short
- Cut from the same slab run as the worktop, at the same time.
- Ordered later, from a different batch, the match is not reliable where the pieces meet.
- Socket and switch positions must be final before templating.
- The joint to the worktop is siliconed, never grouted.
Covered on our west London run. Fitted 3–7 working days from template.
Victorian and Edwardian terraces
Getting stone into the room
Uniform terraced grid with CPZ permit bays, so the van goes on a suspension or a short loading window and the trolley run is 15-30m.
Victorian and Edwardian terraces
What gets asked for here
The research on this patch does not put this among the three commonest jobs. Worktop templating, worktop fabrication and worktop installation do. That changes how often we are here, not how the work is done.
Victorian and Edwardian terraces
The shape of the run
Rooflights along a side return mean the worktop is lit from directly above all day, which shows every ripple in a surface and every gap at a scribe. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. The joint to the worktop is siliconed, never grouted.
Access
Getting stone into a Fulham kitchen
Uniform terraced grid with CPZ permit bays, so the van goes on a suspension or a short loading window and the trolley run is 15-30m. Front paths have a step and a gate, halls are around 1m wide with the stair on one side, and the kitchen sits at the far end past a doorway that is often only 760mm - the door leaf and stops come off before anything moves.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
west London patch
Fulham is covered on our west London run, along with the rest of Hammersmith and Fulham.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop splashbacks & upstands in Fulham
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you cover Fulham?
Yes. Fulham is on the patch, and the postcodes we work here are SW6. It is worked on our west London run, along with the rest of Hammersmith and Fulham. Permit hours are what matters, not the permit itself, because a bay that frees up at six in the evening is no use for a template at ten. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Handling is where these pieces get damaged. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
Does the housing in Fulham change how worktop splashbacks & upstands works?
A long piece has to come through the front door, down the hall, round the newel post and through a doorway with a step down into the addition. A 100mm upstand bedded on silicone is the honest answer where the plaster bows, because it rides what a tall panel exposes. Cut from the same slab run as the tops. Take the kitchen door and its stops off first - a 760mm opening will not pass a 900mm island top and people always find that out at the worst moment.
How does the stone actually reach a kitchen in Fulham?
Uniform terraced grid with CPZ permit bays, so the van goes on a suspension or a short loading window and the trolley run is 15-30m. Front paths have a step and a gate, halls are around 1m wide with the stair on one side, and the kitchen sits at the far end past a doorway that is often only 760mm - the door leaf and stops come off before anything moves. Stone goes up on edge, and it is the half-landing turn rather than the flight itself that sets the maximum piece. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. It decides panel size before anything is cut.
Is Fulham really a worktop splashbacks & upstands area?
Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop templating, worktop fabrication and worktop installation. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Sockets final before template. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Siliconed to the worktop, never grouted.
Why do two Fulham kitchens the same size price differently?
Rooflights along a side return mean the worktop is lit from directly above all day, which shows every ripple in a surface and every gap at a scribe. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. The joint to the worktop is siliconed, never grouted. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What has to be finished before you can template?
Floors settle, and once base units are packed and levelled properly the stone sits true while everything else in the room admits it is not. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. An upstand rides what a panel exposes. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. An owner living in the house makes the decisions and lives with them, so the specification tends to go towards the material rather than towards the lowest total. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Decided before fabrication, not after.
Related
More around Fulham
Other work we do in Fulham
Next step
Splashbacks and upstands in Fulham, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.